Commercial Mapping Products Guideline CMPG Ad Hoc Team Report ASPRS Hot Topic San Diego Conference.

Slides:



Advertisements
Similar presentations
Introducing MyWave Portal. MyWave Portal Access time-saving tools and resources Build convenience into managing your everyday work tasks Collaborate with.
Advertisements

4/27/99Health Level 7 Public Health Data Standards Consortium by Hetty Khan National Center for Health Statistics.
EVALUATIONS & STUDENT GROWTH MEASURES 2-20/ , KEEN CONFERENCE BILL BAGSHAW, ASSISTANT DIRECTOR KAYERI AKWEKS, EPC KSDE, TLA, EVALUATIONS.
Kendle Implementation of Clinical Data Acquisition Standards Harmonization Dr Elke Sennewald Kendle 9th German CDISC User Group Meeting Berlin, 28 September.
[Title of meeting] [Name of sponsor] [Date] For guidance on working with PowerPoint and reformatting slides, click on Help, then Microsoft PowerPoint Help,
Teaching Accessibility & Universal Design Concepts Through the Use of Public Policy Projects Dr. Jonathan Lazar Dept of Computer and Information Sciences.
U.S. General Services Administration General Services Administration Policy, the Procurement Process, the Buy Accessible Wizard, and Purchasing Section.
U.S. Department of the Interior U.S. Geological Survey USGS Digital Aerial Mapping Camera Status CRSS/ASPRS Specialty Conference October 2007 USGS Remote.
Orientation to the Physical Education K to 7 Integrated Resource Package 2006.
Technology Accessibility New Regulations, New Reporting.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
1 September 13, 2012YMPO RTP Technical Advisory Committee Meeting.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Developing an Online Course: A Road Map for the Process English Language Arts 3-5: Vocabulary.
E-government in the Pacific Islands: project update Rowena Cullen Graham Hassall.
1 Interagency Committee on Government Information (ICGI) and the Web Content Standards Working Group Sheila Campbell, GSA / FirstGov Records Administration.
K-12 Web Content Development Process
Sarasota Policy Wiki Why Wiki? To provide a new platform for community input on public policies and issues. To encourage engagement.
Proposition: Digital Collections Are Easier to Find and Use through DLF Aquifer’s American Social History Online Katherine Kott, Aquifer Director Library.
Guidance for Editors Working with care maps © 2008 Map of Medicine Ltd. Commercial and in confidence.
Sooooooo … What did we learn?. Top Interests Topics Changing the University University/Industry Partnerships Public Relations Research.
Revision Process for the PHS Guideline for Reducing HIV, HBV and HCV Transmission through Solid Organ Transplantation Matthew J. Kuehnert, M.D. Office.
U.S. Department of Agriculture eGovernment Program eGovernment Working Group Meeting Chris Niedermayer, USDA eGovernment Executive September 3, 2003.
1 This Presentation is printed on recycled materials.
United Nations Economic Commission for Europe Statistical Division Part B of CMF: Metadata, Standards Concepts and Models Jana Meliskova UNECE Work Session.
Web Redesign Project Update September 15, Agenda Recall: Project Scope and requirements Information Architecture Usability Testing Visual Design.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Civil Works Transformation Foundations of SMART Planning
Developing a Global Testing Framework for SAP Mark S. Smith and Parul D. Parikh.
Presented to presented by Cambridge Systematics, Inc. WVDOT Planning Guidebook Interview & Development Process 2015 WVDOT/MPO/FHWA Planning Conference.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
1 Technical & Business Writing (ENG-315) Muhammad Bilal Bashir UIIT, Rawalpindi.
U.S. Department of the Interior U.S. Geological Survey Lidar Interoperability: The Need for Common Guidelines and Practices ASPRS Annual Conference Thursday.
1 NDIA Earned Value Management Application Guide Status Report August 16-17, 2005 Wayne Abba Walt Berkey David Muzio David Treacy NDIA EVM Application.
Evaluating Assessment for the NRS Evaluating Assessments for the NRS American Institutes for Research February 2005.
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
Creating Successful Theme-based Web Pages Theme-based web sites provide users with a coherent in-depth narrative on a single topic Nancy N. Soreide NOAA/PMEL.
Project 2. Redesign of Jones Plaza 1.Identify your final conceptual design represented both in mind map and drawing. 2.Write a draft problem statement.
Florida Enterprise GIS Workgroup Collaborating and sharing to empower and enhance GIS services and resources statewide Sara Wander, GISP
1 Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Improving COI Information Management Special Projects COI Committee Lois Brako, Assistant Vice President for Research Regulatory Compliance Oversight June,
Presented to: By: Date: Federal Aviation Administration Office of Commercial Space Transportation Human Spaceflight Guidelines Update COMSTAC, Systems.
U.S. Department of the Interior U.S. Geological Survey LSI Constellation Portal Project WGISS #26, Boulder, Colorado, USA September, 2008 Lyndon R. Oleson.
Additional Clauses For Consideration To TC100 Guidelines and Procedures Based on Stage 0 Project on Audio, Video, and Multimedia Systems and Equipment.
A FIRST LOOK: Information and Issues A FIRST LOOK: Information and Issues Recreational Boating Accident Reporting Manual (COMDTINST M ) Federal Register.
Taft Elementary Title Meeting. AGENDA What is Title 1? Action Plan: What does it look like at Taft Elementary? Assessment Title Policy Parent Conferences:
BTT presentation to SG-6, Osaka, Japan, March Browse Task Team Progress to date, future plan 6th SG Meeting, Osaka Osamu Ochiai (NASDA) Browse Task.
What is policy surveillance? What are the methods? Why is it important? November 2015.
Draft FAR Changes Part of a Quality Team Report. Draft FAR Changes LEGEND. Above the FAR text, a legend shows the date of the team report, type of rule,
Evaluation of State Oral Health Plans Paul W. Mattessich, Ph.D.
The Federal Biobased Products Preferred Procurement Program: Standards and Status Presented To Federal Environmental Symposium Bethesda, Maryland May 4,
Better Data, Better Decisions, Better Government: Digital Accountability and Transparency Act (DATA Act) Implementation Update Christina Ho, Deputy Assistant.
 Welcome/Introductions  Overview of the Plan  Updates on Information Requests  Plan Discussion  Hazards/Gaps/Actions/Priorities  Next Steps.
HAZARDOUS MATERIALS REGIONAL PLANS PROJECT, PHASE II UPDATE BRIEFING TO RRT.
Procedures Manual Reconstruction Presentation to: Georgia WIC Program Presented by: Abeda Hannan, MBA Policy and Compliance Unit Manager Date: December.
CPMGT 300 Week 4 Learning Team Collecting Requirements Check this A+ tutorial guideline at 300/CPMGT-300-Week-4-Learning-Team-Collecting-
2009 IOOS Regional Coordination Workshop Thursday, August 27
ONF presentations to ETSI NFV Info Modelling Industry Status ONF Modeling Update 29 March 2016 Note that some points are related to the Multi-SDO Issues.
TechStambha PMP Certification Training
Proposed Nendica Report Progression Process
E-Tariff Technical Volunteers Status Update
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
FGDC Metadata Working Group Meeting
Evaluations & Student Growth Measures
Evaluations & Student Growth Measures
Part B of CMF: Metadata, Standards Concepts and Models Jana Meliskova
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Jadu XForms Professional
Pipeline Safety Electronic Data Reporting Project
Presentation transcript:

Commercial Mapping Products Guideline CMPG Ad Hoc Team Report ASPRS Hot Topic San Diego Conference

Representation The Ad Hoc team for the CMPG has made significant progress since the last report. The team is made up of representation at all levels of government and commercial segments. We have received inputs from all tiers of government and commercial data users and providers. –Our intent is to be assured that the best practices from these tiers are incorporated.

Reference Material The document has attempted to include some of the best of breed procurement documentation materials from: –Commercial –County –State –Federal We have focused on agencies that have made commercial product and service procurements successfully We have utilized many of the state procurement policies available online as additional resources The FAR has also been included to insure compliance with federal regulations.

Multiple phases to reach the final deliverable A series of telecon and face to face meetings have been held to discuss the goals and text in the plan Documents have been collected from across this industry and others A compilation of the best of material is near completion This and the QBS Guideline will act as the raw materials for the CMPG

Activity The team has completed its document gather phase and is down adding the “best of” content to the CMPG. Inputs have been made using the QBS Guideline as a format template as appropriate Our goal is immediately after the San Diego ASPRS to create our web site under ASPRS PPD, formalize the team and place the first draft online for comment.