1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December.

Slides:



Advertisements
Similar presentations
San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.
Advertisements

- P G Ajith kumara.  Introduce strong community/ business concept  Build capacity of non technical aspects  Build capacity of technical Aspects  Identify.
Project ideas for Mozambique Country Context Project 1. Integrated project of electrification using low cost technologies for rural villages and biomass.
中 国 水力资源与开发概况 Overview of Hydropower Resources and Development in China Zhou Shangjie China Society for Hydropower Engineering.
INTEGRATED WIND ENERGY GENERATION PROGRAM Tangiers, june 28th, 2010.
Norwegian Water Resources and Energy Directorate
Strictly Private & Confidential 1 Tunis, 21 October 2009 Nur Energie Solar Development in the Mediterranean Basin.
Hydropower Development: Experience of Nepal
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
EE535: Renewable Energy: Systems, Technology & Economics
Hydro Electricity Generation What is Hydroelectricity?  the production of electrical power through the use of the gravitational force of falling.
Green Energy Hydro Power (Hydroelectric Inflow Dam System) By IP Management Pte Ltd
By: Alizar Rizvi Fatima Raza VIII-A. Mangla Dam is located on the Jhelum river. Kashmir, Pakistan. It is the 16th largest dam in the world. It was built.
Hydro Power Plant Prepared by: Nimesh Gajjar
The Importance of Hydropower and the Dam of Włoczławek
Small hydropower: water for energy Luigi Papetti ESHA.
46 mini/micro hydro plants KP Pakistan
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Is a Financial Institution controlled by the Italian Ministry for Economic Development, participated by leading Italian Banks and Confindustria – the.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Robert Crooks ADFD/WB Project Preparation and Appraisal Workshop Abu Dhabi, April 2010 Environmental Assessment Category A and B Projects Compared.
1 Innovation Energie Développement - IED Innovative Financial scheme for sustainable development of RE in Rural Area in Indonesia, Philippines & Vietnam.
Contributions In Aid of Construction Mark Beauchamp Business & Finance Workshop Utility Financial Solutions
1 Innovation Energie Développement Innovative Financial scheme for sustainable development of RE in Rural Area in Indonesia, Philippines & Vietnam (IFRERA)
From the 16th century, the power of falling water was utilized in Europe. In the early 18th century, the importance of water power replaced by the use.
Hydrology Days 2004 Applied Stochastic Hydrology Lessons Learned from the Brazilian Electric Energy Crisis of 2001 Jerson Kelman President of ANA (Brazilian.
HYDRO POWER SYSTEMS Hydropower is the capture of the energy of moving water for some useful purpose. Hydropower now supplies about 715, 000 MWe or 19%
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
Project preparation and appraisal. Preparation of project report and appraisal are intimately tied up.
Deksyos Tarekegn National DSS Specialist - Ethiopia
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Hydro-Electric Power Station Lecture No: 4. “”A generating station which utilizes the potential energy of water at a high level for the generation of.
Neotech Institute of technology Department of Civil Engineering
Hydro Electric Power Plant
Presented by:- 21. Kunal Kaklij. 22. Ritesh Kedare. 23. Kuldeep Kharjul. 24. Salman Khatik.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Srinakarin Dam ครูจันทนา คำอนุกูล. The Srinakarin Dam is one of the important dams in Kanchanaburi, which is situated in Srisawat District. The atmosphere.
Conduit Hydropower Potential in City’s WDS P1-1 GDS 2055 workshop Conduit Hydropower Potential in City’s Water Distribution System.
15-17 Nov 2004Italy-Vietnam Cooperation Perspectives1 International workshop on Management and Protection of Vietnam’s Natural Environment and Resources.
2 ELECTRICITY SUPPLY MATRIX WORLD x BRAZIL (%) 3 HYDROPOWER REQUIRES SYSTEM INTEGRATION HAVING CONTINENTAL DIMENSIONS EQUIVALENT TO EUROPE Rio de Janeiro.
Supported by the ACE through the EC-ASEAN Energy Facility IFRERA – Vietnam Environmental and Socio-economic impact of Krong Pa 2 Training and dissemination.
El Gallo Hydroelectricity Project PDD Analysis
1 IFRERA first year meeting July 2005 Lyon IFRERA Progress meeting and workshops Lyon 20 – 22 July 2005.
KRONG PA 2 Hydropower Project, Feasibility Study, Vietnam krong pa 2 hydropower PLANT FEASIBILITY STUDY, VIETNAM 2005 Tran Thanh Lien, Institute.
BI Marketing Analyst input into report marketing Report TitleElectricity in Namibia Report Subtitle Country profile of power sector, market trends and.
Sustainable Energy Technologies MSE Hydro energy Eduard Latõšov.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
Erdeneburen HPP Project Implementation Unit
1 Application of SDI in hydrology for assessment of hydropower potential of small streams Subija IZEIROSKI Bashkim IDRIZI Sotir PANOVSKI Igor NEDELKOVSKI.
Hydropower development of Bulgaria: current state and future outlook Valentin Ivanov Deputy Minister Ministry of Economy and Energy.
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
Local level integration SIA and EIA ETC Energy Lyon, 20 July 2005.
Paper Presented by At the Zambezi River Basin Stakeholder Conference : 22 – 23 Nov Windhoek, Namibia Eng. S. Z. Mhlanga Senior Manager (Projects.
Hydroelectric Generation CEE 6490 David Rosenberg.
Nepal’s Water Resources at a Glance
Run-of-River Small Hydro Project, Canada
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
From: Nuclear Power as a Basis for Future Electricity Generation
Presentation of the case in Japan for Technical Committee K - Integrated Operation of Hydropower Stations and Reservoirs- Centers for Civil Engineering.
HPP USTIKOLINA Sarajevo, May 2017.
Assessment of Resource Potential of Submersible Water Turbine
Hydro-electric power plant
Selection of Site for Hydrokinetic
Other renewable energy sources
Integrated Water Resources Management Nam Ngum River Basin – Pilot Project Lao PDR Nam Ngum River Basin Committee Secretariat & Department of Water Resources.
Incentives for electricity infrastructure – ERGEG view
ALPINE CONVENTION - Platform „Water Management in the Alps“
Presentation transcript:

1 Institute of Energy & Gia Lam Joint Stock Company Development of Krong Pa 2 and implementation issues Dissemination and Training workshop Hanoi December 19-20, 2005 Supported by the European Commission through the EC – ASEAN Energy Facility IFRERA

2 Institute of Energy & Gia Lam Joint Stock Company Presentation plan  Background information on Krong Pa 2  Objectives & benefits of the project  Eco-social conditions  Main features of the Krong Pa 2  Implementation issues

3 Institute of Energy & Gia Lam Joint Stock Company Background information on Krong Pa 2  Krong Pa 2 hydropower is located in Krong Pa river which is one of tributaries of Ba river.  The dam site is located in DakRong commune, KBang district, Gia Lai province  Decveloped by Gia Lam Joint Stock company (GJS) – a local private developer

4 Institute of Energy & Gia Lam Joint Stock Company Objectives & benefits of the project  Supply electricity with annual average electricity production of 24.5 x 106 KWh to : –Kbang district –National network –Two nearby remote villages  The project is expected to contribute to impulse for local economic and social development

5 Institute of Energy & Gia Lam Joint Stock Company Eco-social conditions in the area  In this area, mainly ethnic minorities of Ba Na, E De, etc live with low density.  Local life is poor, local inhabitants mainly earn their livings by husbandry and exploitation of forest products. Their life will be improved (by creating jobs, processing agricultural products, etc.) when the hydropower plant comes in.  The area owns convenient access road to the site. Road No. 669 A.  Access road to the dams is sloped gently along the riverside and convenient for construction.  Covered by primary forest but it has no significant impacts on environment  see further on the EIA & SIA by ETC.

6 Institute of Energy & Gia Lam Joint Stock Company Main features of the Krong Pa 2 - Layout

7 Institute of Energy & Gia Lam Joint Stock Company Main features of Krong Pa 2 – Power station  Install Capacity: 5.80 MW  Firm Capacity: 0.88 MW  Annual production24.5 GWh  Number of units: 2 units  Type of Turbine: Francis  Max Water Head: m  Design Water Head: m  Turbine Design Discharge: 2.80 m3/s

8 Institute of Energy & Gia Lam Joint Stock Company Main features of Krong Pa 2 – Catchments & reservoir  Catchment area: 99 km2  Annual average flow: 2.71 m3/s  Full Supply Level, FSL:979.0 m  Minimum Operating Level, MOL:977.5 m  Total storage capacity:82.38 x 103 m3  Active storage capacity:61.31 x 103 m3

9 Institute of Energy & Gia Lam Joint Stock Company Main features of Krong Pa 2 – Power station  Install Capacity: 5.80 MW  Firm Capacity: 0.88 MW  Annual production24.5 GWh  Number of units: 2 units  Type of Turbine: Francis  Max Water Head: m  Design Water Head: m  Turbine Design Discharge: 2.80 m3/s

10 Institute of Energy & Gia Lam Joint Stock Company Main features of Krong Pa 2 – other parameters  Full Supply Level, FSL:979.0 m  Minimum Operating Level, MOL:977.5 m  Total storage capacity:82.38 x 103 m3  Dam type: Concrete Gravity  Crest elevation: 985 m.a.s.l  Crest length: m  Max height: 9.52 m  TUNNEL Length: 2,420 m  Investment cost –Construction:52.72 bil. VND –Equipment: bil. VND –Other cost: 7.62 bil. VND –Contingency: 9.14 bil. VND

11 Institute of Energy & Gia Lam Joint Stock Company Implementation issues Under Vietnamese standard, TCXD VN: , based on the design parameters as FSL of 979 m, dam height of 9.52, and install capacity of 5.4 MW, the Krong Pa 2 hydropower project should be project at level III. Based on the previous studies on topographic and geological conditions at project site, two alternatives 1&2 are compared to select the best dam site. Alternatives of FSL will be either 978 m or 980 m, with daily regulation or non- regulation. Consideration for alternatives of install capacity and number of units. Krong Pa 2 hydropower project is planned to construct within 2.5 years, 6 months among them will be spent for preparation.

12 Institute of Energy & Gia Lam Joint Stock Company Conclusions Technical FS : a good site Economical and financial issues : remaining issues are the risks, grants, CDM. Fiscal : PPA issue? Local level integration : very good EIA & SIA, very good local community participation Implementation package : many issues are to be work out with IFRERA partners

13 Institute of Energy & Gia Lam Joint Stock Company Some drawings & images

14 Institute of Energy & Gia Lam Joint Stock Company CROSS SECTION OF POWER STATION

15 Institute of Energy & Gia Lam Joint Stock Company LAYOUT OF HEADWORKS