Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.

Slides:



Advertisements
Similar presentations
How Will it Help Me Do My Job?
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
Auditing, Assurance and Governance in Local Government
More CMM Part Two : Details.
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
A Feedback and Continuous Improvement Tool to ACE Audit Readiness Keith S. Joy Quality Manager September 14, 2004.
ORP Incorporating Human Performance Improvement Tools into DOE Processes Shirley J. Olinger, Deputy Manager, ORP Brian Harkins, ORP Facility Representative.
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
Quality evaluation and improvement for Internal Audit
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
International Civil Aviation Organization FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Software Quality Assurance Implementation Plan June 15, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs.
DOE-HSS Review of LBNL Science Divisions 10/23/08.
Cross Border Animal Health Plan of Action – Kenya and Uganda Four Strategic areas 1. To improve prevention, management and control of cross border animal.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
ISM Workshop 1 Independent Oversight Perspectives Michael A. Kilpatrick Deputy Director Office of Security and Safety Performance Assurance.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Establishing A Compliance Program: It Makes Sense
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
Management Responsibilities. Building a Culture of Safety.
Georgia Institute of Technology CS 4320 Fall 2003.
River Corridor Closure Project 1 Safety Teamwork Disciplined Operations Integrity River Corridor Closure Project Safety Teamwork Disciplined Operations.
U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
ISM at the Savannah River Site
Tax Administration Diagnostic Assessment Tool MODULE 11 “POA 9: ACCOUNTABILITY AND TRANSPARENCY”
Independent Oversight Status Report on Workplace Exposure Monitoring ISM Workshop 2007.
State of Georgia Release Management Training
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Practice of HOF regulatory oversight E.G. Kudryavtsev Department of Safety Regulation of Nuclear Fuel Cycle Facilities, Marine Nuclear Power Installations.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
Matthew Moury Associate Under Secretary for Environment, Health, Safety and Security Office of Environment, Health, Safety and Security EFCOG Executive.
IAEA International Atomic Energy Agency Arusha, Tanzania Uganda Dr. Akisophel Kisolo Project Counterpart 2 – 5 December 2013 RAF9038 Final Coordination.
Click to edit Master title 1 1 Raymond W. Blowitski, Office of Analysis, HS-32 Phone: (301) Strategy for Implementing DOE O 210.2, DOE Corporate.
U N C L A S S I F I E D Operated by the Los Alamos National Security, LLC for the DOE/NNSA Los Alamos National Laboratory Maintenance Work Planner Training.
1 Quality Assurance Software Quality Assurance Implementation Plans October 16, 2003 Defense Nuclear Facilities Safety Board Beverly Cook Assistant Secretary.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 Federal Emergency Management Agency Charlie Hoffman Disaster Operations Directorate Chief, DEC Programs Disaster Emergency Communications National Public.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Planning for Succession
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Office of Health and Safety Updates EFCOG ISM & QA Working Group 2016 Spring Meeting Las Vegas October 31-November 3, 2016 Patricia R. Worthington,
Document Evaluation Process May 2005 Revision
The EM/HQ Perspective on Readiness Review
FAOSD Programme Administrative and Programme Participation Terms & Conditions Roles and Responsibilities.
DOE NNSA CAS EFCOG/DOE CAS Effectiveness Task Team Sharon Steele Office of the Chief Defense Nuclear Safety (NA-511) November 16, 2016.
Clinical Engineering Lecture (3).
Outline: OCS Overview: Organizational Structure USDA Coordination
State Beef Council Reviews Monitoring of QSBC expenditure compliance
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
By Jeff Burklo, Director
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
SADC PPP Network PPPs in SADC
Presentation transcript:

Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office of the Under Secretary September 2006 Phone (301)

Office of the Under Secretary 2 1.Transparent set of policies that ensure nuclear safety is integrated into a corporate management approach 2.Implementing procedures support the policy and are replicable across the ESE Complex 3.Personnel identified to execute the policy 4.Vigilance in executing that policy 5.Mechanisms established for continuous improvement (including policy) General Approach – Under Secretary’s Direction

Office of the Under Secretary 3 Integrating Processes Feedback & Improvement, Qualifications, Initiatives (6) Policy, R & D (7) Monitoring, Supporting Execution Of Plan (5) Integrated Oversight Plan (4) Expectations In Contracts (1, 2, 3) Operational Awareness Integrated Safety Management

Office of the Under Secretary 4 Technical Support  Exemptions  Special/Independent Reviews  , SQA  , Safety  , Ventilation Line Support  Oversight Activities  Authorization Basis  Tool Box Codes  TRU Waste AB Std  Contracts/Exemptions  Project Management  Operational Readiness Reviews  Vital Safety System Oversight  Office of the Under Secretary Administrative  Procedures  Technical Training  Federal Technical Training  COOP  Field Management Council  Budget/Travel Chief of Nuclear Safety Staff Activities

Office of the Under Secretary 5 CNS Role in Oversight Activities –Supplement existing processes and reinforce –Participate with Facility Representatives, Field Office and HQ Teams –Accountability to site processes –Promote CRADs and consistency –Promote questioning attitude

Office of the Under Secretary 6 CNS Staff are Integrated with Line Oversight Activities 3 Tiered Approach –HQ Reviews –Field Office Activities –Facility Reps Support 226.1A implementation Oversight of high hazard operations become a routine and expected Refine schedules as we learn through implementation

Office of the Under Secretary 7 General Approach Functional area review frequency developed based on risk Coordinate and provide expectations for conducting oversight (basis) Elevate importance of oversight Provide a basis for what we do and technical positions Sites must develop their own integrated plans before HQ can build upon them Need to start with high risk facilities Resource loaded Strengthen existing processes

Office of the Under Secretary 8 Current Activities –ATR Management Review-Completed –Idaho ISM Verification-In Progress –Hanford/ETTP Criticality Safety Reviews-3 rd /4 th quarter –SWPF Design Review-September – Ventilation System Analysis-In Progress –WIPP ORR –TRU Waste AB Standard Development –ABTR Licensing Support –Software Quality Assurance-Toolbox Code Support

Office of the Under Secretary 9 Staff On Board or Arriving –Joseph Arcano-PhD Civil/Env. Engineering –Larry Berg-Criticality Safety –Todd LaPointe-Operations –Bud Danielson-Quality Assurance –Debra Sparkman-Software Quality Assurance –Tony Eng-Safety Basis –Frank Chen-Safety Basis –Bill Weaver-Nuclear Engineer

Office of the Under Secretary 10 1.Integrate staff with line oversight plans 2.Develop CNS strategic plan a.Helps with implementation of 226.1A b.Prioritizes higher risk facilities/projects 3.Support Ventilation System Reviews 4.Publish nuclear safety List B requirements- a.Draft DOE Notice Prepared b.Establish exemption process Upcoming Actions