Implementation Issues Pete Hendel Analyst Procter & Gamble.

Slides:



Advertisements
Similar presentations
Copyright The Info-Tech Research Group Inc. All Rights Reserved. D1-1 by James M. Dutcher Strategic IT Planning & Governance Creation H I G H.
Advertisements

Program Management Office (PMO) Design
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
IT Governance and Enterprise Architecture CAUDIT Enterprise Architecture Symposium – Nov 2006 Leo de Sousa, Enterprise Architect British Columbia Institute.
Faculty Grievance Committee Training October 26, 2012.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
UNIVERSITY OF BALLARAT RISK MANAGEMENT OVERVIEW OF THE DEVELOPMENT OF POLICIES AND PROCEDURES John Gavens Managing Principal.
John Zammit-Haber National Grid
School of Nursing Student Grade Appeal Procedure Prepared by cgalang Revised fkhoiny 4/2011.
ECM Project Roles and Responsibilities
Hiring Process Fact Sheet This fact sheet outlines Goddard Space Flight Center’s hiring process, which is based on the Office of Personnel Management's.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
 AB1725 (1988) – Legislates the implementation of shared or participatory governance on each California Community College Campus.
The Campaign for McMaster University Environmental & Occupational Health Support Services and Central Joint Health and Safety Committee Developed from.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
“Worldwide Review of the Profession” Competition & Regulatory Developments ALAN HUNTER.
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Senior Regulators Meeting The future of the IRRS Programme: Enhancing the Effectiveness of the Regulatory Body Ramzi Jammal, Executive Vice-President and.
New Grants Model Document Retention 1 District 5240 Grants Document Retention District Assembly /6/2013.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
T AXI L IMOUSINE A DVISORY C OMMITTEE C OMMUNICATING AND E NGAGING S TAKEHOLDERS March 25, 2011.
Local Assessment of Code of Conduct Complaints. 2 Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
Grade Change & Incompletes Policy/ Procedure Auburn University Office of the Provost.
IFTA DISPUTE RESOLUTION PROCESS AMENDMENT PROPOSALS Present by Rick LaRose, Chair Dispute Resolution Committee Annual IFTA Business Meeting July 18-19,
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
1 Roles and Responsibilities of The Learning Evidence Team at CCRI Presented at CCRI Peggy Maki
Local Assessment of Code of Conduct Complaints. Background  On 08 May 2008 – the local assessment of Code of Conduct complaints was implemented due to.
1 The GCC Metrology Group GULFMET Mohammad Al Mulla GSO - Building for Integration
IMPLEMENTING EDI VERSION 4010 AN OVERVIEW. Agenda The Argument For An Industry Solution What Is VICS 4010? How Do I Implement 4010 With My Trading Partners?
Moving To the Year 2000:Implementing 4010 Implementation Resolution Process Rich Emrich EDI Manager J.M. Schneider.
Section 4.9 Review Report Request for MAC Approval December 1, 2015.
Policy and Procedure for the Handling of Complaints against the AG Consultation with the Standing Committee on the Auditor-General 9 April 2008 Wandile.
Greater Essex County District School Board Regulation: School Councils Reference NO: R-AD-03 Principal Chris Mills.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
PSCIOC/PSSDC XML Subcommittee Dave Wallace Corporate Chief Technology Officer Management Board Secretariat Ontario Government Glenn Sargant Chief Information.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Developing & Maintaining Policies & Procedures 2007 National Leadership Conference.
Page  ASME 2013 Standards and Certification Training Module B – Process B7. The Appeals Process.
Turning our Action Plan into Action. Acronyms: FACA – Federal Advisory Committee Act WRDA 1996 – Water Resources Development Act of 1996.
PROCEDURAL OUTLINE FOR DESIGNATION OF AN ECONOMIC DEVELOPMENT AREA A Guide for Developers.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Idaho Conservation District’s Resolutions. Resolution res·o·lu·tion noun 1. a formal expression of opinion or intention made, usually after voting, by.
V Global Forum on Fighting Corruption and Safeguarding Integrity – South Africa Trade and Customs Partnership to fight against corruption and safeguard.
© International Training Centre of the ILO International Labour Standards and the ILO Supervisory System: tools to defend workers’ rights Geneva,
AES Board Regional Representative SA Chapter Regional Committee Secretary Workshop/ Seminar Coordinator.
Handbook of Informatics for Nurses and Healthcare Professionals Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights.
Preparation of the Self-Study and Documentation
TEXAS NODAL (ERCOT REVISIONS)
Monitoring Forest Resources for SFM in the UNECE Region
HRM 498 ASSIST Experience Tradition/hrm498assist.com
Overview of U.S. Participation in ISO and IEC
Implementation Strategy July 2002
2 Selecting a Healthcare Information System.
Project Roles and Responsibilities
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
VP Committee Composition and Cross-Committee Collaboration
CBP Biennial Strategy Review System
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
Greater Essex County District School Board
Portfolio, Programme and Project
CUSC Amendment Panel Recommendation
Fort Valley State University
Articulation Manual Faculty Senate Presentation
Project Kick-off <Customer Name> <Project Name>
Public Protector South Africa Deputy Public Protector of South Africa
Presentation transcript:

Implementation Issues Pete Hendel Analyst Procter & Gamble

Agenda Implementation Pitfalls Strategic Issues Tactical Issues

Implementation Pitfalls Poor business processes Deviation from standards Inadequate planning or strategy No business case, alignment or champion Expecting too much or too little Trading partner limitations/constraints Lack of resources Training/Education

Strategic Issues 1. Knowledge of business processes

2. Commitment from senior management –You need a Champion Strategic Issues

3. Alignment of EDI implementation with core business objectives Strategic Issues

4. Trading partners involvement and consultation (customers, suppliers, vendors, etc.) Strategic Issues

5. Use EDI as a tool and an opportunity for re-engineering the business Strategic Issues

Tactical Issues Selection of technology Business applications Standards Internal resources Training/education Audit and control requirements

Good Luck! Sources: University of Ottawa, Case Study Instructor Notes, Electronic Commerce Strategies Profit Magazine, EDI or Else!, May 7, 1996 Systems Management Group, A Small Business Guide to Information Technologies Asia Pacific Economic Cooperation, EDI Environmental Assessment, May 13, 1996 The Society of Management Accountants of Canada, Implementing Electronic Data Interchange, Feb.. 1, 1994 Nigel Wood, ECCC

EDI Standards & Guidelines Development Robert Fletcher V.P. Electronic Commerce Livingston Logistics Michael Sadiwnyk Vice President ECCC

EDI Standards Development

EDI Industry Guidelines Development

Canadian Guidelines Development

Moving To the Year 2000:Implementing 4010 Implementation Resolution Process Rich Emrich EDI Manager J.M. Schneider

Introduction The implementation of an industry wide initiative as comprehensive as the movement to VICS 4010 will require a resolution process to address standards related issues. Therefore an implementation resolution process has been established to ensure timely resolution and to ensure consistency in implementation. Note: This process will only address standards related issues, and not issues arising from application limitations.

Objectives Maintain harmonious Trading Partner Relationships Address Business needs over system needs Endorse and formally submit required standards changes Timely resolution (within 4 weeks were standards changes are not required

Structure A committee of 5 members is to be created preferably from the group who developed the implementation guides. Two members each representing distributors and suppliers and one neutral part (one of the co-chairs of the ECCC Industry Standards Advisory Committee)

Procedure 4Documented complaint will be sent to co-chairs of the EDI Technology Committee. Complaint will outline the following points: 4Identify trading partners involved 4Identify transaction sets 4description of issue and problem 4suggested approach to resolve the situation

Procedure Upon receipt of complaint the co-chair will remove the names of the trading partners from the “complaint” and forward it to the other co-chair and members of the Implementation Guideline Committee. A review date will be scheduled within two weeks to discuss and recommend a solution. The recommended solution or judgement is to: be routed back to one of the co-chairs who will notify the complainant of the outcome.

Procedure ·If the recommended solution is to: ·Change the guidelines: The co-chairs will authorize the change to the guidelines and notify the membership at large indicating the rationale. ·Change the Standards: The co-chairs and the ISAC standards representative shall forward the draft request to the appropriate standards body and post a notice on the ECCC web site to advise the membership and indicate status.

Procedure Upon approval or refusal of the proposed change, the complainant is to be advised by the co-chair and Guidelines will be changed if required.

Appeals Only those judgements that have not gone to the Standards bodies will be eligible for the appeal process. Appeals are to be requested in writing stating the position being challenged and the arguments against the initial ruling to either co-chair within 30 days of the judgement. Appeal verdicts are final.

Appeals Process Appeals are to be presented by the requester of the appeal with the other affected party to a committee consisting of: The Implementation Guideline Chair, the two co-chairs of the EDI Subcommittee in a meeting (conference call) arranged by the co-chair to be scheduled within two weeks of receiving the notice

Questions & Answers

The Courtyard Room