06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

“The Honeywell Web-based Corrective Action Solution”
Transition from Q1- 8th to Q1- 9th edition
Final/Shipout Inspection Approved for Public Release.
Company Confidential 1 IAQG “ Supply Chain Management Handbook” IAQG General Assembly York, North Yorkshire, UK Friday, October 22, 2010 Bill Schmiege.
PPAP Requirements Training
Company Confidential Registration Management Committee (RMC) Other Party (OP) Assessor Workshop San Diego, CA January 20, AS9104/2 Oversight Process.
First Article Inspection Report
Variation Management of Key Characteristics
SUBSAFE Approved for Public Release
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Guardian Tier 2 PPAP Guidelines
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Prepared by: Tim Lee – Chair IAQG OPMT The Boeing Company October 10, 2013 International Aerospace Quality Group (IAQG) Other Party Management Team (OPMT)
ISO 9000 Certification ISO 9001 and ISO
First Article Inspection 9102 Carl ZimmermanSept,2013.
AEROSPACE QUALITY MANAGEMENT SYSTEM 9100
First Article Inspection
IAQG International Aerospace Quality Group QMS Standards: Change Overview Quality Management Systems (QMS) For Aviation, Space and Defense April 16,
1 Inspection and Testing Approved for Public Release.
S3: Module D Physikalisch-Technische Bundesanstalt Session 3: Conformity Assessment Module D Peter Ulbig, Harry Stolz Belgrade, 31 October.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
1 of 59September 9, 2004Civil Aviation Safety Symposium AEROSPACE QUALITY MANAGEMENT SYSTEMS Eugene M. Barker. Past Chairman Americas Aerospace Quality.
New Components Introduction (NCI) and Suppliers Selection. General Awareness Presentation Valentina Shirina GE Transportation June 22, 2011 Eskisehir.
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
Company Confidential Rewrite Team Proposal Tim Lee - OPMT.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
AAQG Sector Report William SchmiegeOctober 10, 2013.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Last Update: 4/8/03 Page FAI Standard Implementation Review Team Status April 9, 2003.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Company Confidential 1 AAQG RMC 9101:2009 Revision Workshop Prepared by IAQG 9101 Team 19 July, 2010 Atlanta Ga. “It’s All About Performing” Quality Management.
Company Confidential 1 IAQG 9100:2009 Revision Overview Buddy Cressionnie Lockheed Martin Americas 9100 Team Lead Prepared by IAQG 9100 Team Rev: 1 Dated:
Supplier Quality Improvement
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
To the Greater Phoenix Chapter of ASQ January 10, 2013.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Inspection & Test Plan (ITP) / Manufacturing Process Quality Plan (MPQP) - training of suppliers to FMC Technologies, Norway QRL FMC Standard.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
Quality Management: Mutually beneficial supplier relationships.
External Provider Control
Production Part Approval Process
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
NEEDS & EXPECTATIONS: INTERESTED PARTIES TO ISO & AS9100
AEROSPACE QUALITY MANAGEMENT SYSTEMS
First Article Inspection
AEROSPACE QUALITY MANAGEMENT SYSTEM STANDARD AS / EN / JIS Q9100
First Article Inspection (Per AS9102)
Statistical Product Acceptance
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Guidance Material: FAI Review
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
SQA01 Supplier Guidance Material: Permission to Ship Forms
First Article Inspection
Production Part Approval Process
IAQG 9120:2009 Revision Overview
International Aerospace Quality Group European Sector Leader
AS 9100 Awareness Training.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
First Article Inspection (Per AS9102)
Presentation transcript:

06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design Quality Honeywell Engines and Systems Phoenix, Arizona 5

What is AS9102- FAI Standard? 06/27/100 What is AS9102- FAI Standard? International Standard for First Article inspection (FAI), co-published as AS9102 by SAE in Americas EN 9102 by AECMA in Europe SJAC 9102 by SJAC in Asia Developed by International Aerospace Quality Group (IAQG) Outlines the Documentation and Inspection Requirements Published in August 2000 7

Motivation to Develop a Common Standard Current Status Aerospace Companies Have Somewhat Common Requirements for First Article Inspection (FAI) Documentation Requirements Differ Common Standard and Unified Requirements Will Eliminate Common Errors and Omissions Simplify FAI for Suppliers Focus on Product Quality Rather Than Documentation Writing Team Charter: Standardized Aerospace FAI Requirements A Common Form of Documentation for Supplier FAI

Key Elements of AS/EN/SJAC 9102 When to Perform FAI- Full And/or “Delta * ” FAI: Specific Triggers What to Inspect: Unified Requirements for Inspection How to Document- Common Format for Documenting FAI Results * Delta FAI: The FAI requirements may be satisfied by addressing differences between current configuration and prior approved configurations

When to Perform First Article Inspection? Full FAI New Part New Supplier or New Location of Manufacture Lapse in Production- Default: 24 Months Delta* FAI Drawing Change/ Revision Change Manufacturing Process Change: Including NC Programs, Material Change, Sub-tier Change Change in Inspection Method or Inspection Plan * Delta FAI: The FAI requirements may be satisfied by addressing differences between current configuration and prior approved configurations

Applicability Assemblies and All Levels of Parts Within an Assembly, Including Castings and Forgings Organizations That Are Responsible for Producing the Design Characteristics Suppliers and Their Subcontractors Who Produce Design Characteristics, Suppliers Responsible for Ensuring That Characteristics Conform to Customer Requirements.

What is Included in First Article Inspection? Verification of All Design Characteristics: Dimensional Verification Via Marked up (or “Ballooned”) Drawing That Correlates Characteristic Number From FAI to the Drawing. Part Marking Replication Material and Special Process Certs (Including Operator Certs (e.g. NDT, Welding), If Required). Manufacturing Process Verifications Manufacturing Routing Sheets. Referenced Exhibits Supporting the FAI (e.g. CMM Data Printouts, Test Data, Acceptance Test Procedures, Process Certifications, etc.). Process Capability Studies, As Applicable. Gauge Correlation, As Applicable. Tooling Traceability, If Tooling Is Used to Verify Design Characteristics Nonconformance Resolutions

Common Documentation Requirements Standardized Forms With Each Field Numerically Coded Form 1: Part Number Accountability Form 2: Product Accountability – Raw Material, Special Process(s), Functional Testing Form 3: Characteristic Accountability, Verification and Compatibility Evaluation Forms May Be Generated Electronically... Must Contain All the Required Information SAE Allows Free Reproduction of the Forms

Where to Obtain AS9102 Copies? Society of Automotive Engineering (SAE) AS9102 available for purchase from SAE http://www.sae.org/servlets/techtrack?PROD_TYP=STD (There are no spaces in this web address...they are underlines) The current price for the standard is : Mail: $45 List Price ($36 member price) Fax: $75 List Price ($60 member price) Download: $59 List Price ($47.20 member price)

Thank You!