Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.

Slides:



Advertisements
Similar presentations
TERENA Networking Conference, Lyngby, May 2007, R. Hughes-Jones Manchester 1 The Performance of High Throughput Data Flows for e-VLBI in Europe Multiple.
Advertisements

Dominik Stoklosa Poznan Supercomputing and Networking Center, Supercomputing Department EGEE 2007 Budapest, Hungary, October 1-5 Workflow management in.
Connecting Academic Networks The ORIENT, TEIN and GÉANT Projects: International Research Networks John Chevers, DANTE International eVLBI Workshop Shanghai,
Dominik Stokłosa Pozna ń Supercomputing and Networking Center, Supercomputing Department INGRID 2008 Lacco Ameno, Island of Ischia, ITALY, April 9-11 Workflow.
Project Partners Project Collaborators The Council for the Central Laboratory of the Research Councils Funded by EPSRC GR/T04465/01
7th US VLBI Technical Meeting at Haystack Observatory, November 3-4, 2009 Arecibo VLBI Report Arecibo VLBI Team: V. Arun, R. Ganesan, T. Ghosh, C. Salter.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Arpad Szomoru Joint Institute for VLBI in Europe
V. Tudose (UvA, AIRA), R. Fender (Soton, UvA), M. Garrett (JIVE), J. Miller-Jones (UvA), Z. Paragi (JIVE), R. Spencer (Jodrell), G. Pooley (Cambridge),
ESLEA Bits&Bytes, Manchester, 7-8 Dec 2006, R. Hughes-Jones Manchester 1 VLBI & Protocols vlbi_udp Multiple Flow Tests Richard Hughes-Jones The University.
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk MIT Haystack Observatory 10 Jan 2006 IVS General Meeting Concepion, Chile.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
E-VLBI: Science with Multi-Gigabit Global Networks Dr Shaun Amy (Dr Chris Phillips, Dr Tasso Tzioumis) Australia Telescope National Facility 22 January.
Michael Enrico - GÉANT Developments -Networkshop, York, 2 April 2003 GÉANT Developments Networkshop 31, York, 2 April 2003 Michael Enrico, Network Engineering.
Poznań city, PSNC - who are we? Poznań city, PSNC - who are we? Introduction into Virtual Laboratory Introduction into Virtual Laboratory VLab architecture.
Marcin Okoń Pozna ń Supercomputing and Networking Center, Supercomputing Department e-Science 2006, Amsterdam, Dec Virtual Laboratory as a Remote.
Internet2, Washington, 10 April 2003 eVLBI Research in the European VLBI Network Steve Parsley Joint Institute for VLBI in Europe Dwingeloo, Netherlands.
09-Sept-2004 NeSC UKLight Town Meeting Peter Clarke, UKLight Town Meeting Welcome, background and & programme for the day Peter Clarke.
AMPATH, FIU, Miami, 31 January 2003 eVLBI Research in the European VLBI Network Steve Parsley Joint Institute for VLBI in Europe Dwingeloo, Netherlands.
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.
Support for Radio Astronomy Michael Enrico DANTE.
High Rate Internet Data Transfer for eVLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester All Hands Sept 2005.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
4th e-VLBI workshop, Sydney, July 2005, A. Szomoru, JIVE e-VLBI and EXPReS Arpad Szomoru.
Arecibo (JIVE/EXPReS +) Presented by : Tapasi Ghosh Other active players: Arun Venkataraman, Chris Salter, & Emmanuel Momjian. A brief history.
Marian García - GÉANT Support for Research GÉANT Support for Research Within and Beyond Europe TNC 2003, Zagreb May Marian Garcia, Operations Manager.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
Connect. Communicate. Collaborate GÉANT2 User Support for eVLBI John Chevers, Project Manager, DANTE Forskningsnet Konference 2005 Middelfart, Denmark.
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
IVS General Meeting, Feb 2004, Ottawa eVLBI Research in the European VLBI Network Steve Parsley JIVE
Swedish LOFAR: John Conway Hamburg, Sept 17th, 2008 Onsala Space Observatory, Swedish national facility for radio astronomy, provides access for Swedish.
Connect. Communicate. Collaborate Support by GÉANT2 and NRENs for eVLBI in Europe John Chevers, DANTE In collaboration with: Toby Rodwell (DANTE) Steve.
Collaborative Research Projects in Australia: Radio Astronomy Dr. Greg Wickham (AARNet) Dr Tasso Tzioumis Dr Shaun Amy Dr Chris Phillips (CSIRO ATNF) Global.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
Connect. Communicate. Collaborate GÉANT2 status and update, IPv6 Network Infrastructure & Services Marco Marletta, GARR HEPiX Spring meeting rd.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
Current Network Architecture. First eVLBI with JIVE: September 2004 The first eVLBI test observations took place on Sept. 10, The source, ,
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
5 th e-VLBI Workshop, Haystack Observatory, September 2006, A. Szomoru, JIVE e-VLBI Developments at JIVE Arpad Szomoru.
NEXPReS Period 3 Overview WP 6: High Bandwidth on Demand Paul Boven, JIVE.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
2007 April 17EXPReS Annual ReviewSlide #: 1. EXPReS Annual Review April 17 EXPReS Project Team JIVE, Coordinating Institution.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
Coordinator’s report Huib van Langevelde EXPReS board Utrecht, 30 January, 2008.
Targeting transient phenomena with e-VLBI Zsolt Paragi (JIVE), for the EXPReS project.
Shatskaya M, Abramov A., Fedorov N., Kostenko V., Likhachev S., Seliverstov S., Sichev D. Astro Space Center, P. Lebedev Physical Institute, RAS, Moscow,
8 th EVN Symposium, Torun, September 2006, A. Szomoru, JIVE Recent e-EVN Developments Arpad Szomoru.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
NEXPReS Period 3 Overview WP2 EVN-NREN Richard Hughes-Jones, DANTE.
SPIE, Orlando, May 2006, A. Szomoru, JIVE VLBI in Transition Arpad Szomoru Joint Institute for VLBI in Europe.
EInfrastructures: Usage Policy Mike Garrett Joint Institute for VLBI in Europe (JIVE, Dwingeloo, The Netherlands) eInfrastructure meeting, Dublin, April.
Presentation Title Presentation subtitle Your name Your title, organisation.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
SA1: Production e-VLBI service Previous 12 Month Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
SA1: overview, first results
Overview of 4Gbps connectivity for Nordic-MERLIN fringe tests
Shatskaya M, Abramov A. , Fedorov N. , Kostenko V. , Likhachev S
eInfrastructures: Usage Policy
E-EVN developments in 2006 Arpad Szomoru.
EXPReS Annual Review April 17
Arecibo (JIVE/EXPReS +)
SA1: third year overview
User interaction and workflow management in Grid enabled e-VLBI experiments Dominik Stokłosa Poznań Supercomputing and Networking Center, Supercomputing.
Constraining IMBH masses with VLBI
Presentation transcript:

Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University of Technology, Gothenburg Torun Poland Gbit link 3 rd EVN-NREN Meeting Steve Parsley, JIVE,

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Outline Proof of Concept Project – Review of Progress Timeline Milestones Connection status Next six months FP6 IST proposal

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Project Timeline You are here Low data rate astronomy Transatlantic real-time fringes

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 eVLBI Milestones (since 2 nd EVN-NREN Meeting) January 2004: Disk buffered eVLBI session: Three telescopes at 128Mb/s for first eVLBI image On – Wb fringes at 256Mb/s April 2004: Three-telescope, real-time eVLBI session. Fringes at 64Mb/s First real-time EVN image - 32Mb/s. September 2004: Four telescope real-time eVLBI Fringes to Torun and Arecibo First EVN, eVLBI Science session January 2005: First “dedicated light-path” eVLBI ??Gbyte of data from Huygens descent transferred from Australia to JIVE Data rate ~450Mb/s

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Jodrell Bank UK Onsala Sweden Medicina Italy Torun Poland Effelsberg Germany Westerbork Netherlands Telescopes connections JIVE 1Gb/s 155Mb/s MERLIN Cambridge UK 2.5Gb/s 1Gb/s MERLIN e ? ? ? ? ?

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Outline Proof of Concept Project – Review of Progress Timeline Milestones Connection status Next six months FP6 IST proposal

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Next Six Months Objectives Induction of Jodrell/Cambridge and Medicina when high speed links are ready. Expansion of the array to seven telescopes: Ar, Cm, Jb, Mc, On, Tr, Wb Higher data rates > PoC target of 512Mb/s. Correlator/Mark5, eVLBI robustness issues. eVLBI Logistics: FS and correlator-control coordination for smooth operations. Alternative protocol development and testing - viz. work underway at Jodrell Bank and JIVE Integration of Haystack e-VLBI products: VSI-E, network monitoring tools. Transatlantic eVLBI and dedicated light paths.

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Next Six Months Dates for Scheduled e-VLBI tests and demos 10 Feb - (not Onsala) 11 March - (science demo) 24 March 28 April 26 May 7th July (not Onsala)

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Science Demo – 11 March Cm, Jb,On, Wb, Tr, (Mc?) Continuum source 128Mb/s First trial of “dynamic scheduling”: Test several sources for suitability Observe brightest ….not possible with standard VLBI

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Outline Proof of Concept Project – Review of Progress Timeline Milestones Connection status Next six months FP6 IST proposal (see separate presentation)

3 rd EVN-NRAN Meeting – Schiphol, Amsterdam – 28 th January 2005 Thank you