07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

S. Veneziano, Lecce 21 February 2002 RPC readout and trigger electronics status Lecce 21/02/2002.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
1 PET in the detection of breast cancer The ClearPEM Project Encontro Nacional de Ciência — Ciência 2009 Fundação Calouste Gulbenkian de Julho de.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Presentation of the ClearPEM-Sonic mammography scanner ClearPEM-Sonic.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
LIP - L ABORATORY OF I NSTRUMENTATION AND EXPERIMENTAL P ARTICLE PHYSICS Lisbon, PORTUGAL THE 12 TH VIENNA CONFERENCE ON INSTRUMENTATION FEV 2010.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
Parallel Data Acquisition Systems for a Compton Camera
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
COMPET Electronics and Readout
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
THE 12 TH VIENNA CONFERENCE ON INSTRUMENTATION FEV 2010 The ClearPEM Breast Imaging Scanner LIP - L ABORATORY OF I NSTRUMENTATION AND EXPERIMENTAL.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
ClearPEM, J. Varela EuroMedIm06, Marseille, May ClearPEM: a PET imaging system dedicated to breast cancer diagnostics J. Varela LIP/IST Lisbon &
ASIC Activities for the PANDA GSI Peter Wieczorek.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Introduction to the ClearPEM projects
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
1 Rome, 14 October 2008 Joao Varela LIP, Lisbon PET-MRI Project in FP7 LIP Motivations and Proposals.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Update on works with SiPMs at Pisa Matteo Morrocchi.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
TIMING DETECTOR ELECTRONICS FRONT END ELECTRONICS - NINO JOSE DA SILVA –CT-PPS TIMING ENGINEERING REVIEW /
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SKIROC status Calice meeting – Kobe – 10/05/2007.
LISHEP 2015, Manaus 1 PET Technologies and developments Jose DA SILVA LIP-Lisboa Manaus
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
ETD meeting Architecture and costing On behalf of PID group
Micromegas Vertex Tracker Status Report
PID meeting SNATS to SCATS New front end design
High-Speed Data Acquisition Electronics for a PEM Scanner
Mini-drawers, FE-ASIC , Integrator
EMC Electronics and Trigger Review and Trigger Plan
ECAL OD Electronic Workshop 7-8/04/2005
VELO readout On detector electronics Off detector electronics to DAQ
Status of n-XYTER read-out chain at GSI
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
BESIII EMC electronics
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Setup for testing LHCb Inner Tracker Modules
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva, M.Ferreira, S.Ferreira, J.Neves, R.Bugalho, R.Silva, G.Silva, C.Ortigao, J.Varela

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards Data Acquisition Electronics (DAE) and test boards Front End Board (FEB) Validation tests Status of scanner assembly

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards DAE and test boards FEB Validation tests Status of scanner assembly

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA ClearPem Sonic  ClearPEM-Sonic : a project in the framework of CERIMED that combines: –a dedicated mammography PET, the ClearPEM –an UltraSound transducer working in elastographic mode from SuperSonicImagine Same Electronics Mechanical structure revised Breast Contention Image fusion

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA ClearPem Sonic

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA ClearPem Sonic

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards DAE and test boards FEB Validation tests Status of scanner assembly MADE IN LIP

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Two detector plates: 6144 LYSO 2x2x20 mm 3 crystals6144 LYSO 2x2x20 mm 3 crystals APD pixel channels12288 APD pixel channels Dual readout of crystal pixelsDual readout of crystal pixels ( for DoI measurement) 160x180 mm 2 active area160x180 mm 2 active area Water coolingWater cooling Detector Heads Electronics

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA LYSO 2x2x20 mm 3 crystalsLYSO 2x2x20 mm 3 crystals Detector modulesDetector modules 64 Xtals,4 APDs64 Xtals,4 APDs Detector Heads Electronics

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Detector Heads Electronics Characteristics Technology: CMOS 0.35μm Area: 70mm 2 Input: 192 channels Output: 2 highest channels Shaping: 40ns Analog Memories: 10 pulse samples Clock Frequency: MHz Power: 3.6 mW/channel

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Frontend Board Contains 2 ASICs for signal selection 2 High-speed dual ADCs (10bit, 100MHz) 1 LVDS transmitter (600Mb/s)Supermodule 2 FE Boards and detector modules Processes 768 APD channels Detector Plate 8 Supermodules One board for bias-voltage regulation, power supply and clock distribution Frontend Board Contains 2 ASICs for signal selection 2 High-speed dual ADCs (10bit, 100MHz) 1 LVDS transmitter (600Mb/s)Supermodule 2 FE Boards and detector modules Processes 768 APD channels Detector Plate 8 Supermodules One board for bias-voltage regulation, power supply and clock distribution Detector Plate 4.5 cm Detector Heads Electronics

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA  PCB Production issues  Bond Pads etching and gold plating  ENIG= electroless nickel immersion gold Detector Heads Electronics

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Detector Heads Electronics  Auxiliary Boards  Service Board: LV, HV, Threshold, Reset, Temperature readout  HV Matrix  Clock Fanout Board M.Ferreira

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Service RACK  DAQ Server  LV and HV  DSS  Network Bridge  Patch Pannel  Isolation Transformer

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA SoftwareSoftware  Service Manager  Software Acquisition Manager  (R.Bugalho) R.Bugalho/G.Silva

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards DAE and test boards FEB Validation tests Status of scanner assembly

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA DAE and Trigger Crate DAE Crate System Single 19” 4U crateSingle 19” 4U crate Uses two cPCI backplanesUses two cPCI backplanes 4 DAQ Boards4 DAQ Boards 1 Trigger & Data Concentrator Board1 Trigger & Data Concentrator Board Coincidence Trigger Coincidence Trigger Energy and time determination in Virtex FPGA’sEnergy and time determination in Virtex FPGA’s Calibration constants for individual channelsCalibration constants for individual channels Programmable energy thresholds and coincidence windowProgrammable energy thresholds and coincidence window Fast link to Data Acquisition Server bandwidth up to 6.4Gb/sFast link to Data Acquisition Server bandwidth up to 6.4Gb/s

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Test Boards FE Emulator FE Emulator 5 boards manufactured and in use 5 boards manufactured and in use Important for the validation of the DAQ Boards Important for the validation of the DAQ Boards FE Receiver 7 boards manufactured, 6 in use 7 boards manufactured, 6 in use Important for the validations of the FE Boards Important for the validations of the FE Boards FEB Tester 1 board assembled 1 board assembled Important for FEB production tests Important for FEB production tests Currently under tests by INOV and LIP Currently under tests by INOV and LIP

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards DAE and test boards FEB Validation tests Status of scanner assembly J.Neves/R.Silva

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA  Evaluation of FEB´s performance:  Characterization and Quantification of the mean pedestal (baseline) and the ASIC Noise (pedestal RMS)  Looking for dead and noisy ASIC channels FEB Validation Tests Ok to Globtop

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA ClearPEM Sonic FEBs – Test Results ASIC 0 ASIC 1 Good Results !

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA ClearPEM Sonic FEBs – Test Results P36 Bad Results ! P31 P10

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA FEB Validation Tests 1st Batch 2nd Batch - 22 FEBs CERN (C1, C2,…, C22) -> OK: 12/ FEBs Photochemie (P1, P2,…, P10) -> OK: 8/ FEBs Photochemie (P11, P12,…, P50) -> OK: 33/38

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Presentation Guidelines Introduction to ClearPEM-Sonic Front-end electronics and Service Boards DAE and test boards FEB Validation tests Status of scanner assembly

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA  Detector Heads  All Electronics in hand  Assembly of the SMs started  Cables and Integration tests  DAQ and Services RACK  LV, HV, DSS, Network, etc : All in hand  DAE  ALL Boards Produced, New Crate fully equipped and in tests Scanner Assembly Status

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Scanner Assembly Status

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA  Scanner Mechanics  Major components received and assembled  Main assembly in February (cables, pipes, etc)  Expected fully deliver by March Scanner Assembly Status

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Scanner Assembly Status

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Scanner Assembly Status

07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA  All major components are in hand or close to be delivered  Important to really keep deadlines now!!  System fully functional from February to have 2 month Calibration/Validation  deliver the ClearPEM Scanner in Marseilles in May Thank you 30 Final words