By PT. PLN Geothermal for Energy Business Forum of the 38 th Meeting of the APEC Working Group (Bali, November 17, 2009) 1.

Slides:



Advertisements
Similar presentations
1 st ASEAN – EU Business Summit (AEBS) Infrastructure Sector Sandiaga S. Uno Founding Partner of Saratoga Capital ASEAN EU Business Summit 2011 Jakarta,
Advertisements

FORUM ON BRITISH INVESTMENTS TO THE PROFIT OF NIGER London June 14th 2012 PUBLIC PRIVatE partnership in NIGER.
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
PT. REKAYASA CAKRAWALA RESOURCES
New eyes… New Vision… New Beginning… JOIN WITH US NOW…. New eyes…
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
South Boston Energy Project South Boston, VA
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Business plan presentation
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
KIC InnoEnergy SE - CC Poland Plus Business Creation KIC InnoEnergy Highway Krakow, 12 April 2011.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Exclusive Dealing Case Study on The Distribution of Cement by PT. Semen Gresik Indonesia Presented by : Sholihatun Kiptiyah, KPPU Republic of Indonesia.
Technical Due Diligence Renewable Energy We build with Passion!
ENERGY EFFICIENCY IN THE INDUSTRIAL SECTOR: PRACTICAL SOLUTIONS.
1 Best Practice for Preparing & Responding to RFPs.
1 Merger of PM and UHM as an example of the globalization of the Russian economy London April 2004 Pavel G Skitovich Deputy General Director Strategy and.
Bay Area Integrated Regional Water Management Plan North Bay Watershed Association Meeting November 3, 2006 Working together to enhance sustainable water.
International workshop on power generation with CCS in India 22 January 2008 Rachel Crisp Deputy Director, CCS team, Department of Business and Enterprise.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
NEW PROJECT YEAR 2009 The 10 TH HAPUA WG-1 Meeting – 26 February 2009 MANAGEMENT OF HYDRO POWER PLANT TECHNICAL AND PERFORMANCE PROBLEMS PROPOSE BY PT.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Fiscal and other Policies to Leverage Private Sector Finance.
Company Name Business Plan. Business Concept Clearly state your company’s long-term mission. –Try to use words that will help direct the growth of your.
DEVE LOPING A SUCCESSFUL GEOTHERMAL INDUSTRY IN INDONESIA, CHARTING THE WAY TO A GREEN ENERGY ECONOMY THROUGH FISCAL POLICY REFORMS ( ROLE FOR MINISTRY.
Title written in CAPITAL letters, broken into 2 lines, if it fits with the length of the words Optional: Cover this area with photo. Proportions are approx.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Geothermal Fields On the Ring of Fire Prospect Developed Fields.
Acquisition and preparing for indicative agreements Business Contract Drafting Arief Surowidjojo April 10, 2012.
2008 Bidders Workshop Attachment D April 11, 2008.
IPP and Corruption in Indonesia Fabby Tumiwa Institute for Essential Services Reform 14 th IACC Workshop CLEAN ENERGY 13 November 2010.
New Orleans Ninth Ward to CBD TIGER III Funding Application The Notice of Funding Availability was published in the Federal Register on August 12, 2011.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
12/24/2015 Wei Huang Change or Die. 12/24/2015 Wei Huang 2 Mission Statement A clear statement of your company’s long-term mission. Try to use words that.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
1 Presented by: Refex Energy Limited. SWITCH ON THE SUN.
4. Environmentally friendly
Copyright 2006 by Ironsclad Solutions, Inc. All rights reserved April 28, 2006 The Business Capture Process J. Jeffrey Irons.
COLLABORATIVE IV – Lead Economy: China Adoption of Renewable Energy Standards Project overseer Song Yanqin November 4, 2002 Seoul.
E L E C T R I C I T Y F O R A B E T T E R L I F E INDONESIA Geothermal Power Plants in the 2 nd Phase 10,000 MW Project APEC ENERGY BUSINESS FORUM 17 November.
Harmonisation in progress: the telecom regulation example Andrzej Chrzanowski Office of Telecommunications and Post Regulation URTiP, Poland November 2004.
APPROACHES TO REGULATING RUSSIAN ARCTIC ZONE THROUGH THE LENSES OF PUBLIC DISCOURSE Ekaterina Mikhailova PhD candidate Higher School of Economics
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
Comments on the Infrastructure Milestones Ala Alizadeh Atomic Energy of Canada Limited (AECL) November 2007 IAECL Vienna.
Geothermal Policy and Regulation Cases from Chile, Kenya, New Zealand and the Philippines November 2015.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
STANDARDS AND REGULATIONS PRESENTATION TO PASC XXX 26 April 2007.
© Copyright 2004 Frost & Sullivan. All Rights Reserved. Asian Power Plant Services Markets A Potentially Lucrative Market Energy Markets Group “The lure.
November Overview APEC Leaders have noted the importance of continued focus on green building: “Promote energy efficiency by taking specific steps.
Driving Innovation Fuel cells manufacturing and supply chain Proposed outline for competition for funding.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
City and County of San Francisco Local Agency Formation Commission
STATE LAW OFFICE AND DEPARTMENT OF JUSTICE
Dominican Republic LNG and Power Plan Facility
Geothermal Energy By Arielle.
HERO SUPERMARKET UNION
Project Feasibility CIS 255.
ELSA Day KAM Münster, September 2016.
March, 30 – April 3, 2009, Honolulu, Hawaii
Application of Proposed New BES Definition:
NZGW - Industry Update 2018 Year in review and looking forward
Presentation to NZ Geothermal Workshop
Update on the Philippine Geothermal Industry
Presentation transcript:

by PT. PLN Geothermal for Energy Business Forum of the 38 th Meeting of the APEC Working Group (Bali, November 17, 2009) 1

About PT. PLN Geothermal (PLN-G)  PLN-G is a subsidiary company of PT. PLN (Persero), a state- owned power company in Indonesia.  PLN-G was legally established on April 6, 2008 for aiming at supporting the power development business in Indonesia through the program of geothermal energy development. 2

The Geothermal Power Business in Indonesia 1.Indonesia presents a unique geothermal power value chain 2.Incumbents operate at various points in this value chain 3.Terminology: a.Brownfield: A field that has had its geothermal resources tested sufficiently for development to proceed b.Greenfield: Any field that has not yet been tested. c.Legacy WKP: WKP belonging to PGE and PLN governed by Keppres 45/1991. Includes elements 4 through 9 of value chain. d.New WKP: WKP offered under Law 27/2003. Includes elements 1 through 9 of value chain 3 7. Power Plant Construction 8. Power Station O&M 1. Opportunity Identifica- tion 2. Preliminary Resource Assessment 3. WKP Proposal Preparation 4. Exploration 5. Feasibility Study& PPA Negotiation 6. Field Develop- ment PLN-G (near-term) 9. Field O&M Geothermal Power Value Chain Greenfield Brownfield PLN-G (long-term)

Opportunities for PLN-G MW total (1,5,6) 40.5 MW total (1,5,6,8) 493 MW total (1) 430 MW total (1,5) ~1,800 MW total (1,5,6,8) Near term (Captive)Long term (Competitive)

Up to 1,800 MW 40.5 MW 430 MW 493 MW 760 MW Fit & Schedule: Business Line Staging * If regulatory environment improves

Opportunities for Partnership (Near-term) 6

Opportunities for Partnership (Long-term) 7

Key Notes 8

9 Jl. Wijaya I No. 61, Kebayoran Baru, Jakarta 12170, Indonesia.