1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.

Slides:



Advertisements
Similar presentations
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Advertisements

PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
1 Update and functional test results for SWIM David McCann Solar system physics and space technology IRF, Kiruna Supervisor: Professor Stas Barabash David.
Expected Influence of Crustal Magnetic Fields on ASPERA-3 ELS Observations: Insight from MGS D.A. Brain, J.G. Luhmann, D.L. Mitchell, R.P. Lin UC Berkeley.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 SEP Integration and Test Alan Cummings
1 MAVEN PFP SWIA Electrical Pre-CDR Peer Review MAVEN SWIA Electrical Pre-CDR Peer Review May 11, 2011 E. Taylor Space Science Laboratory University of.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
IES Calibration Modeling Phil Valek and Roman Gomez May 29, 2013.
1 PFP MSR, 11/15/2011 Particles and Fields Package Monthly Status Review (MSR) November 15, 2011 Dave Curtis, PFP PM.
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
18-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Package Dave Curtis, PFP Package Manager Mars.
1 PFP MSR, 11/17/2009 Particles and Fields Package Monthly Status Review (MSR) November 17, 2009 Dave Curtis, PFP PM.
LPW Preamp/Sensor Overview Greg Delory, LPW Co-I MAVEN PFP Pre-CDR Peer Review May 10, 2011.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
1 PFP MSR, 3/15/2011 Particles and Fields Package Monthly Status Review (MSR) March 15, 2011 Dave Curtis, PFP PM.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
24-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : ATLO Support Dave Curtis Mars Atmosphere and Volatile.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review System Engineering David Curtis, PF Package Manager.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Critical Design Review May , 2011 Integration and Test Dave Curtis PFP Package Manager Mars.
PFP Instrument Status All PFP Instruments Except SWEA have been delivered, integrated, and tested; supporting environmental tests Issues: –EUV alignment.
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
1 PFP QSR, 1/18/2012 Particles and Fields Package Quarterly Status Review (QSR) January 18, 2012 Dave Curtis, PFP PM.
1 MAVEN PFP ICDR May 23-25, 2011 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Particles and Fields Science Critical Design Review May ,
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
Failures encoutered during build and test of Swea sensor instrument MAVEN-Swea sensor pre-shipping review - December 1-2/
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
1 PFP MSR, 02/17/2010 Particles and Fields Package Monthly Status Review (MSR) February 17, 2010 Dave Curtis, PFP PM.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
1 PFP MSR, 2/14/2011 Particles and Fields Package Monthly Status Review (MSR) February 14, 2011 Dave Curtis, PFP PM.
1 STATIC pre-CDR Peer Review, May STATIC pre-CDR Peer Review 2011 May11 Instrument Lead: James McFadden Electrical: Ken Hatch, Rick Sterling, Dorothy.
10-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : EMC Dave Curtis Mars Atmosphere and Volatile EvolutioN.
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
MAVEN Archive Overview J. Mafi PDSMC Face-to-Face Berkeley, California 18 November 2014.
15-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , SWIA (Solar Wind Ion Analyzer) J.S. Halekas.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
TRIO-CINEMA 1 UCB, 2/08/2010 Integration and Test Program Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Mullard Space Science Laboratory Using a CCD for the direct detection of electrons in a low energy space plasma spectrometer A CCD in place of an MCP:
15-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, 2012 Section 15 STATIC James McFadden Mars Atmosphere and.
4-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , Verification Dave Curtis, PFP Package Manager.
1 PFP MSR, 12/13/2011 Particles and Fields Package Monthly Status Review (MSR) December 13, 2011 Dave Curtis, PFP PM.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
1 PFP Team Meeting Particles and Fields Package Weekly Team Meeting, SSL April Dave Curtis, PFP PM.
1 MAVEN PFP ICDR May 23-25, 2011 Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Solar Wind Electron Analyzer (SWEA) Critical Design Review May.
EKT 314/4 WEEK 2 : CHAPTER 1 INTRODUCTION TO EI ELECTRONIC INSTRUMENTATION.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review SWEA David L. Mitchell Paul Turin Ellen Taylor (with.
Techniques for mass resolution improvement achieved by typical plasma analyzers: Modeling and simulations 1 G. Nicolaou, 1 M. Yamauchi, 1 M. Wieser, 1.
Introduction to MAVEN Dave Brain LASP / University of Colorado On behalf of the MAVEN team.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
The dynamic range extension system for the LHAASO-WCDA experiment
SWEA sensor FM model work remaining before delivery
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
SWIA Front End Peer Review
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
Cross-Calibration Meeting ESTEC, February 2006
THEMIS INSTRUMENT SUITE
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
MIPA status report (Miniature Ion Precipitation Analyzer)
CONTOUR NGIMS Electronics Test History
Presentation transcript:

1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell

2 SWEA pre-CDR Peer Review IRAP / UCB-SSL Collaboration IRAP, Toulouse Analyzer MCP Anode HVPS SSL, Berkeley Pedestal Digital / FPGA LVPS (same as for STEREO SWEA)

3 SWEA pre-CDR Peer Review PFP I&T Flow

4 SWEA pre-CDR Peer Review SSL Integration and Test Facilities One of 5 Thermal Vac chambers at SSL Cleanroom (with 5 THEMIS probes) Magnetics Screening StationOne of 3 calibration chambers at SSL

5 SWEA pre-CDR Peer Review SWEA Verification PFP Verification Plan MAVEN_PF_SYS_023 PFP Verification Matrix MAVEN_PF_SYS_033 Maps requirements to verification tests –FRD, ERD, ICD Requirements Most SWEA Performance Requirements in the FRD verified during SWEA Instrument Calibrations ERD requirements verified during Environmental Tests

6 SWEA pre-CDR Peer Review SWEA I&T Plans at SSL SWEA Sensor delivered to SSL ~12/2012 –Will have been calibrated at IRAP –Includes verification of instrument sensitivity (PF66), flux range (PF65), energy range and resolution (PF67, PF68), angular resolution (PF70), and FOV (PF71). SWEA Integrated with SSL electronics –Interface verifications –Comprehensive Functional Test (CPT) Uses internal test pulsers outside of vacuum chamber Verify all possible modes of operation Verify all instrument commands –Chamber tests to verify no change in performance, sweeping modes, data products

7 SWEA pre-CDR Peer Review SWEA System-Level Testing End-to-end testing in vacuum chamber from front-end analyzer optics, to digital electronics, to data products Calibration utilizes a GSE that controls the instrument, and the electron source, the 3-axis manipulator, and records the data Verify analyzer, deflector, and V 0 voltage sweeping modes –Provides verification of time resolution (PF69) –Verify sufficient precision and stability for “ionosphere mode” Test energy and angular response to check that instrument response matches expectations from IRAP calibrations and simulation –Verify uniform energy/angle response –Check hemisphere concentricity –Determine relative anode/MCP sensitivity Verify data products

8 SWEA pre-CDR Peer Review In-Flight Calibration (PF107) Pre-launch: SWEA must have the right dynamic range to handle expected flux range at Mars (10 years of experience with MGS ER) –Need to know GF to a factor of ~2: pre-launch calibrations and simulations easily provide this Primary Method: LPW measures plasma frequency in the sheath to determine absolute plasma density – compare with SWEA, SWIA, STATIC Secondary Method: STATIC MCP efficiencies can be determined in flight by comparing START and STOP events – combine with well known mechanical geometric factor to determine absolute sensitivity – cross calibrate with SWEA in sheath Cross Check: STATIC cross calibrated with NGIMS by measuring periapsis RAM ions – cross calibrate with SWEA in sheath