Transportation, Assignment, and Transshipment Problems Pertemuan 7 Matakuliah: K0442-Metode Kuantitatif Tahun: 2009
Bina Nusantara University 3 Material Outline Transportation Problem Network Representation General LP Formulation Assignment Problem Network Representation General LP Formulation Transshipment Problem Network Representation General LP Formulation
Transportation, Assignment, and Transshipment Problems A network model is one which can be represented by a set of nodes, a set of arcs, and functions (e.g. costs, supplies, demands, etc.) associated with the arcs and/or nodes. Transportation, assignment, and transshipment problems of this chapter as well as the PERT/CPM problems (in another chapter) are all examples of network problems.
Transportation, Assignment, and Transshipment Problems Each of the three models of this chapter can be formulated as linear programs and solved by general purpose linear programming codes. For each of the three models, if the right-hand side of the linear programming formulations are all integers, the optimal solution will be in terms of integer values for the decision variables. However, there are many computer packages (including The Management Scientist) that contain separate computer codes for these models which take advantage of their network structure.
Transportation Problem The transportation problem seeks to minimize the total shipping costs of transporting goods from m origins (each with a supply s i ) to n destinations (each with a demand d j ), when the unit shipping cost from an origin, i, to a destination, j, is c ij. The network representation for a transportation problem with two sources and three destinations is given on the next slide.
Transportation Problem Network Representation 2 2 c 11 c 12 c 13 c 21 c 22 c 23 d1d1d1d1 d2d2d2d2 d3d3d3d3 s1s1s1s1 s2s2 SourcesDestinations
Transportation Problem LP Formulation The LP formulation in terms of the amounts shipped from the origins to the destinations, x ij, can be written as: Min c ij x ij i j s.t. x ij < s i for each origin i j x ij = d j for each destination j i x ij > 0 for all i and j
LP Formulation Special Cases The following special-case modifications to the linear programming formulation can be made: –Minimum shipping guarantee from i to j: x ij > L ij –Maximum route capacity from i to j: x ij < L ij –Unacceptable route: Remove the corresponding decision variable. Transportation Problem
Example: Acme Block Co. Acme Block Company has orders for 80 tons of concrete blocks at three suburban locations as follows: Northwood tons, Westwood tons, and Eastwood tons. Acme has two plants, each of which can produce 50 tons per week. Delivery cost per ton from each plant to each suburban location is shown on the next slide. How should end of week shipments be made to fill the above orders? AcmeAcme
n Delivery Cost Per Ton Northwood Westwood Eastwood Plant Plant Example: Acme Block Co.
n Optimal Solution From To Amount Cost Plant 1 Northwood Plant 1 Westwood 45 1,350 Plant 2 Northwood Plant 2 Eastwood Total Cost = $2,490 Example: Acme Block Co.
n Partial Sensitivity Report (first half) Example: Acme Block Co.
n Partial Sensitivity Report (second half) Example: Acme Block Co.
Assignment Problem An assignment problem seeks to minimize the total cost assignment of m workers to m jobs, given that the cost of worker i performing job j is c ij. It assumes all workers are assigned and each job is performed. An assignment problem is a special case of a transportation problem in which all supplies and all demands are equal to 1; hence assignment problems may be solved as linear programs. The network representation of an assignment problem with three workers and three jobs is shown on the next slide.
Assignment Problem Network Representation c 11 c 12 c 13 c 21 c 22 c 23 c 31 c 32 c 33 AgentsTasks
LP Formulation Min c ij x ij i j s.t. x ij = 1 for each agent i j x ij = 1 for each task j i x ij = 0 or 1 for all i and j –Note: A modification to the right-hand side of the first constraint set can be made if a worker is permitted to work more than 1 job. Assignment Problem
n LP Formulation Special Cases Number of agents exceeds the number of tasks: x ij < 1 for each agent i j Number of tasks exceeds the number of agents: Add enough dummy agents to equalize the number of agents and the number of tasks. The objective function coefficients for these new variable would be zero. Assignment Problem
n LP Formulation Special Cases (continued) The assignment alternatives are evaluated in terms of revenue or profit: Solve as a maximization problem. An assignment is unacceptable: Remove the corresponding decision variable. An agent is permitted to work a tasks: x ij < a for each agent i j
An electrical contractor pays his subcontractors a fixed fee plus mileage for work performed. On a given day the contractor is faced with three electrical jobs associated with various projects. Given below are the distances between the subcontractors and the projects. Projects Subcontractor A B C Westside Federated Goliath Universal How should the contractors be assigned to minimize total mileage costs? Example: Who Does What?
n Network Representation West. CC BB AA Univ.Univ. Gol.Gol. Fed. Fed. Projects Subcontractors
Example: Who Does What? n Linear Programming Formulation Min 50x x x x x x x x x x x x 43 s.t. x 11 +x 12 +x 13 < 1 x 21 +x 22 +x 23 < 1 x 31 +x 32 +x 33 < 1 x 41 +x 42 +x 43 < 1 x 11 +x 21 +x 31 +x 41 = 1 x 12 +x 22 +x 32 +x 42 = 1 x 13 +x 23 +x 33 +x 43 = 1 x ij = 0 or 1 for all i and j Agents Tasks
Example: Who Does What? The optimal assignment is: Subcontractor Project Distance Westside C 16 Federated A 28 Goliath (unassigned) Universal B 25 Total Distance = 69 miles
Transshipment Problem Transshipment problems are transportation problems in which a shipment may move through intermediate nodes (transshipment nodes)before reaching a particular destination node. Transshipment problems can be converted to larger transportation problems and solved by a special transportation program. Transshipment problems can also be solved by general purpose linear programming codes. The network representation for a transshipment problem with two sources, three intermediate nodes, and two destinations is shown on the next slide.
Transshipment Problem Network Representation c 13 c 14 c 23 c 24 c 25 c 15 s1s1s1s1 c 36 c 37 c 46 c 47 c 56 c 57 d1d1d1d1 d2d2d2d2 Intermediate Nodes Sources Destinations s2s2s2s2 Demand Supply
Transshipment Problem Linear Programming Formulation x ij represents the shipment from node i to node j Min c ij x ij i j s.t. x ij < s i for each origin i j x ik - x kj = 0 for each intermediate i j node k x ij = d j for each destination j i x ij > 0 for all i and j
Example: Zeron Shelving The Northside and Southside facilities of Zeron Industries supply three firms (Zrox, Hewes, Rockrite) with customized shelving for its offices. They both order shelving from the same two manufacturers, Arnold Manufacturers and Supershelf, Inc. Currently weekly demands by the users are 50 for Zrox, 60 for Hewes, and 40 for Rockrite. Both Arnold and Supershelf can supply at most 75 units to its customers. Additional data is shown on the next slide.
Example: Zeron Shelving Because of long standing contracts based on past orders, unit costs from the manufacturers to the suppliers are: Zeron N Zeron S Arnold 5 8 Supershelf 7 4 The costs to install the shelving at the various locations are: Zrox Hewes Rockrite Thomas Washburn 3 4 4
Example: Zeron Shelving Network Representation ARNOLD WASH BURN ZROX HEWES Arnold SuperShelf Hewes Zrox ZeronN ZeronS Rock-Rite
Example: Zeron Shelving Linear Programming Formulation –Decision Variables Defined x ij = amount shipped from manufacturer i to supplier j x jk = amount shipped from supplier j to customer k where i = 1 (Arnold), 2 (Supershelf) j = 3 (Zeron N), 4 (Zeron S) k = 5 (Zrox), 6 (Hewes), 7 (Rockrite) –Objective Function Defined Minimize Overall Shipping Costs: Min 5x x x x x x x x x x 47
Example: Zeron Shelving Constraints Defined Amount Out of Arnold: x 13 + x 14 < 75 Amount Out of Supershelf: x 23 + x 24 < 75 Amount Through Zeron N: x 13 + x 23 - x 35 - x 36 - x 37 = 0 Amount Through Zeron S: x 14 + x 24 - x 45 - x 46 - x 47 = 0 Amount Into Zrox: x 35 + x 45 = 50 Amount Into Hewes: x 36 + x 46 = 60 Amount Into Rockrite: x 37 + x 47 = 40 Non-negativity of Variables: x ij > 0, for all i and j.
Example: Zeron Shelving n Optimal Solution (from The Management Scientist ) Objective Function Value = Variable Value Reduced Costs X X X X X X X X X X
Example: Zeron Shelving n Optimal Solution ARNOLD WASH BURN ZROX HEWES Arnold SuperShelf Hewes Zrox ZeronN ZeronS Rock-Rite
Example: Zeron Shelving n Optimal Solution (continued) Constraint Slack/Surplus Dual Prices
Example: Zeron Shelving n Optimal Solution (continued) OBJECTIVE COEFFICIENT RANGES Variable Lower Limit Current Value Upper Limit X X No Limit X No Limit X24 No Limit X35 No Limit X X No Limit X No Limit X X47 No Limit
Example: Zeron Shelving n Optimal Solution (continued) RIGHT HAND SIDE RANGES Constraint Lower Limit Current Value Upper Limit No Limit