Status of Subaru Open Use and Notice for S08B Call for P r oposals Subaru Users Meeting 2008.1.29-31 Subaru Open Use Team = Notice for S08B Applicants.

Slides:



Advertisements
Similar presentations
Accreditation Liaison Officers (ALOs)
Advertisements

Preparation of the Self-Study and Documentation
OPC matters Simon Morris. Topics for possible Discussion Simon Morris is OPC Chair for period 80 and 81 Rapid turnover planned for Panel membership Large.
Information Society Technologies In the 6th Framework Programme Information Society Technologies In the 6th Framework Programme Proposal submission and.
Step by Step Guide for Regulations S HELLY B EZANSON K ELLY O FFICE OF G ENERAL C OUNSEL S EPTEMBER 5, 2012.
1 AAO AusGO : 29 June 2009 Demystifying the Queue at Gemini Observatory AAO Epping - 29 June 2009 Henry Lee Gemini South, Chile.
Guidelines for honors theses for Computer Science, Computer Systems Engineering, and Informatics March 2013.
December 21-22, 2005Subaru Users Meeting, Mitaka Status of Remote Observation / Service Observation Junichi Noumaru Subaru Telescope National Astronomical.
TAC Subaru UM 2008 K. Shimasaku (chair) - TAC Members - Statistics - Review Process - 08B Schedule - Notice.
TAC report Subaru UM 2011 TAC Members (10A~11B) M. Doi (Univ. of Tokyo) Y. Ito (Kobe Univ.) N. Kashikawa (NAOJ) H. Kawakita (Kyoto Sangyo Univ.) T. Murayama.
NRAO Proposal Tool (PST) Gustaaf van Moorsel NRAO Community Day 1/13/2012.
Keck Call for Proposals 2009A (Feb 1st - July 31st 2009) Deadline: 5pm, Mon 1st September 2008.
Moving up to Secondary School in September 2016 Important information, significant dates and useful contacts. Customer Services.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
W. M. Keck Observatory Subaru Users’ Meeting
SYSTEM PLANNING Addendum FALL 2003 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. October 2003 PLEASE.
14-16 January, 2009Subaru User’s Meeting (NAOJ) Possible Collaboration between Seoul National University and Subaru Myungshin Im (CEOU/Astronomy Seoul.
Type and redshift distributions 65 candidates have been observed between June 2003 and May Redshift is measured by using emission and/or absorption.
Roster Verification RV Presentation to School Administrators Spring 2012.
OGCA Proposal process Series Submitting an R01 proposal.
Information Session for Applicants for Promotion to Professor Fall 2011 Faculty of Arts & Science – June 2011.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Subaru Advisory Committee Report すばる小委員長 吉田道利 SAC Chair: Michitoshi Yoshida 2014/1/21Subaru UM
Kenneth Sng – Vice President of Finance Hunter Malasky – Speaker of the Treasury Vikram Biswas – Budget Committee Chair Presidents & Treasurers Training.
SACS and The Accreditation Process Faculty Convocation Southern University Monday, January 12, 2009 Presented By Emma Bradford Perry Dean of Libraries.
March 2006 T. M. Kurihara, Chair, IEEE P1609Slide 1 doc.: IEEE /0457r1 Submission IEEE DSRC Application Services (P1609) Date: NameCompanyAddressPhone .
CTPA CONSTITUTION Revised 2012 Presented at CTPA Conference 04/30/12: CTPA Business Meeting Revised by CTPA Executive Board 1Compiled.
2015 AAUW CALIFORNIA ELECTION One Member, One Vote.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
Office of Sponsored Projects & Industry Partnerships 1 OSPIP Process Meeting February 3, 2011 NIH Regional Seminar in April New Adobe Forms for NIH Recent.
SunSatFriThursWedTuesMon January
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
Thesis Defense and Submission 1 Spring  Register for Spring semester  Deadline to submit thesis to GPS: Friday, April 22 nd at NOON  Deadline.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Exercise on online nomination process & suggestions.
Work Related to Senate Bill 2202 (effective January 1, 2001)
NASA Herschel Science Center - page 1 PACS NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 ESA AO and NASA Funding Call Phil Appleton and.
Retail Market Subcommittee Update to TAC May 6, 2004.
Hiroshi Subaru Telescope Subaru Instruments Status 2008 SUBARU Users’ Meeting : 2009/01/16 NAOJ, Mitaka SUBARU Instruments Status & Prospects.
1 Addendum FALL 2004 RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. November 2004.
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
A Year in the Life Of a State Data Coordinator December, 2013.
ESP Chapter Leadership Advanced Session Updated Annually by Second Vice President for Chapter Relations and National Executive Director Updated October.
GRADS Advisory Committee Meeting 4 May 9, 2016 Lori Cottrill.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Science Operation of Subaru Telescope Tae-Soo Pyo 2014.Feb.25 2/25/ Subaru Winter KASI.
Preparation of the Self-Study and Documentation
Annual Admissions Process
Graduate Assistant Informational Session
Key Factors for Clubs in doing both Club and Global Grants
REACH 2018 Find your co-registrants and prepare to register jointly.
TAC Subaru UM /01/16 K. Shimasaku (chair)
Senate Sabbatical Leave Committee Chair: Subash Jonnalagadda
Moving up to Secondary School in September 2018
Completing Your Technical Paper Submission for SAMPE 2018 – Long Beach
ESO Phase 1 & 2 Procedures Gaitee Hussain
Transplant Administrators Committee (TAC)
Senate Sabbatical Leave Committee Chair: Subash Jonnalagadda
Applying – the UCAS process
TGn LB97 Frame Format Ad Hoc
(Science Operation Division Chief)
TGn LB97 Frame Format Ad Hoc
Science Operation Report FY2017
ENTERGY SERVICES, INC. February 23, 2006
Agenda and minutes TGn PHY ad hoc
WP 1 Management and Coordination
The master thesis process – an overview
Registration and Abstract Upload
AY Senate Sabbatical Leave Committee Subash Jonnalagadda
TAC report Subaru UM 2005 K. Ohta (Kyoto)
Presentation transcript:

Status of Subaru Open Use and Notice for S08B Call for P r oposals Subaru Users Meeting Subaru Open Use Team = Notice for S08B Applicants = 1. Opening of AO 188 The Subaru new AO system(AO188) using natural guide stars is available only in combination with IRCS. The mode of observations, the number of observing nights and the number of executable proposals may be limited, since it is still under commissioning. Those who submit proposals using AO188+IRCS are required to make contact with the AO188 development team, Dr. Yutaka Hayano (hayano @ naoj.org) in advance. The previous AO system (AO36) is going to be decommissioned and thus hereafter not available any more. 2. Change of Scientific Categories The category of "high-z galaxies" has been divided into "high-z galaxy properties" and "galaxy formation". 3. CIAO Available as PI Instrument Only without AO In S08B, CIAO is still available as a PI instrument, but only without AO. Please be sure to make contact with the CIAO team (PI: Dr. M. Tamura: hide @ optik.mtk.nao.ac.jp) in advance. 4. Time Exchange Programs with Gemini and Keck Gemini 5 nights GMOS(N) NIFS(N) NIRI(N) Altair(LGS/NGS-AO for NIFS or NIRI) GMOS(S) T-ReCS(S) Keck 5 nights LRIS DEIMOS ESI NIRSPEC OSIRIS NIRC2, LGS-AO/NGS-AO(for OSIRIS or NIRC2) 5. Necessity of Abstract also for Service Proposals Regarding Service Proposals, we newly require that a brief abstract (ca. several lines) should be presented at the beginning of Scientific Justification. 6. Duplicated Submission Unallowable An identical proposal using the same instrument/telescope should not be submitted twice at the same time by making use of the time-exchange opportunity. For example, if a proposal using Keck (or Gemini) telescope was submitted to Subaru time-exchange program, it should not be applied to the ordinary proposal selection on the Keck (or Gemini) side at the same semester. (And vice versa.) 7. Indication of Moon-Affected Unacceptable Dates When one particular source or several sources whose coordinates are concentrated to a particular range are planned to observe in bright or grey nights, observations may be severely affected by the Moon in some particular nights. In such cases, those inconvenient or unacceptable dates should be explicitly indicated in Entry 10 (Schedule Requirements) of the proposal. 8. Notice for MOIRCS Applicants (i) Due to a technical trouble in the detector on channel-1, we are temporarily using an engineering-grade chip. Though it will be replaced by a new science-grade detector when it becomes available, its exact schedule has not yet been decided (maybe after S08B). For the latest information on the status of the detector, please check the MOIRCS website. (ii) If you are planning to observe in the MOS mode of MOIRCS, the number of required masks must be clearly specified at the beginning of Entry 11 (Instrument Requirements) of your proposal. = Subaru TAC Members = Kazuhiro Shimasaku (Univ.of Tokyo): Chair Mamoru Doi (Univ. of Tokyo) : Structure formation and Cosmology Hideyo Kawakita (Kyoto Sangyo Univ.): Solar system and Extrasolar planets Tadayuki Kodama (NAOJ): Galaxies and Clusters of galaxies Takashi Murayama (Tohoku Univ.) : AGN and galaxies Tetsuya Nagata (Kyoto Univ.) : Star/Planet formation and ISM Takashi Onaka (Univ. of Tokyo): Stars Toshikazu Shigeyama (Univ. of Tokyo) : General Tomonori Totani (Kyoto Univ.) : General = Subaru Open Use Team = Hideki Takami : negotiation with Gemini/Keck Yoichi Takeda : manager of proposal selection procedure Nobunari Kashikawa : service program Masatoshi Imanishi : scheduling and time-exchange program Hiroshi Terada: operation Yasushi Nakajima : electronic submission Yosuke Minowa : electronic submission Chie Yoshida : administrative assistant =How the Proposal Selection Proceeds?= Time Schedule for S08B January 2008 : Discussion/decision about the details for the S08B semester (schedule, instruments to be opened, time exchange program, etc.) February 8 : “Call for Proposals” starts Note: Please avoid submission on February 14 (JST), since our server is expected to be down and a submitted proposal would not be correctly registered on this day. March 7 : Deadline of Normal/Intensive proposals mid- March : Grouping proposals into 7-8 categories (by TAC) Nomination of referee candidates (by TAC) (About 5 referees for each category, usually 3 Japanese and 2 foreigners) mid to late- March: Inquiring each referee candidate whether he/she is willing to accept (When declined, go to another candidate) end of March : Sending review forms and proposals to referees April 11 : Deadline of Service proposals mid-April : Sending Service proposals to TAC members late-April : Receiving referee reports mid-May : Time Allocation Committee (2 days) Hearing of Intensive proposals Selection of Normal/Intensive proposals based on referee scores Tentative time allocation Ranking of Service proposals mid to late-May : Editing the referee comments and adding TAC comments to each proposal Scheduling by early June : Informing the results of Normal/Intensive proposal selection Announcement of schedule and observing procedure Informing the results of Service proposal selection August 1: Start of S08B