Andrei Seryi, 10/10/03, PEP-II MAC mtg. 1 PEP-II IR2 alignment S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf With big help from A.Acosta, F.Brown,

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

Bach ground: The correlation between sunspot proper motion and flares has been investigated for a long time (e.g. Antalova, 1965, Gesztelyi, 1984). The.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Electric Motors. Current in a wire Creates its own magnetic field Interacts with another field Force on the current carrying wire Rotational motion.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Alignment and Beam Stability
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Active Vibration Stabilization for the NLC Final Focus Quads Josef Frisch, Linda Hendrickson, Thomas Himel, Andrei Seryi,
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
NLC - The Next Linear Collider Project SLAC tunnel motion and analysis Andrei Seryi SLAC Originally given at The 22nd Advanced ICFA Beam Dynamics Workshop.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
EXCEL DECISION MAKING TOOLS BASIC FORMULAE - REGRESSION - GOAL SEEK - SOLVER.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Cost Evaluation of Storage Ring Magnets Claudio Sanelli March 19, 2012.
SUPERKEKB MAIN RING TUNNEL MOTION M. Masuzawa, T. Adachi, H. Iinuma, T. Kawamoto and Y. Ohsawa, KEK Tsukuba, Japan
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Alignment and stability session
ALIGNMENT OF THE NEW TRIPLETS
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
TEST MODULE WG Cradles for CLIC module supporting system
M. Sullivan SuperB XIII June 1-4, 2010 Elba, Italy
Status of Vibration Measurement Work at BNL
Recent Results from TOTEM
Final Focus Synchrotron Radiation
S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf
Ron Settles MPI-Munich
A 3D-printed, functionally graded soft robot powered by combustion
Feedforward correction to injection bump error in the SPring-8
IR Lattice with Detector Solenoid
Linac Diagnostics Commissioning Experience
Alignment Diagnostic System Status
Presentation transcript:

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 1 PEP-II IR2 alignment S.Ecklund, C.LeCocq, R.Pushor, R.Ruland, A.Seryi, Z.Wolf With big help from A.Acosta, F.Brown, R.Chestnut, A.Chupyra 1, B.Dix, C.Dudley, T.Himel, D.Jensen, M.Kondaurov 1, T.Lahey, B.Myers, M.Petree, J.Seeman, U.Wienands, M.Zurawel, et al. ( 1 BINP) PEP-II MAC meeting, October 2003

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 2 Event flow Motivations –IR orbit correctors show correlation with current – IR magnets move? –Spring 2003 => tiltmeters installed on IR quads observe motion correlated with current SR heating vacuum chamber => expansion => push magnets August 2003 : decided to install new systems in IR –Hydrostatic level system –Stretched wire system –Laser tracker system This talk: –Data from 3 systems => reconstruction of IR magnet motion Next: –Orbit motion modeling, optimization of orbit correction or feedforward. Possibly, cure the cause of motion Consider only vertical motion. Horizontal data, and data from laser tracker are being analyzed and are not discussed in this talk.

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 3 Hydrostatic sensors Stretched wire. Sensors. Tiltmeters Left A Backward <= e+

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 4 Hydrostatic sensors Tiltmeters Laser tracker Right B Forward <= e+

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 5 Left side. Stretched wire system. Hydro sensors Q5Q4

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 6 Right side. Hydro sensors on the raft. TargetsLaser tracker Tiltmeters Q5 Q4

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 7 IR magnet motion – “hydro” data The left raft motion is correlated with current(s), but not much the right raft. Slope is changing more significantly than the center of Q5 position. IR Motion expressed as a vertical slope (pitch) and position of the raft Slope: positive slope = end of raft closer to IP lifts up. Raft position is recalculated to the center of Q5 quad (positive position means the raft is higher). Horizontal axis => day of 2003.

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 8 Left side moves significantly more than the right one, the motion is correlated with current (mostly LER), is observed by hydro, wire and tiltmeter systems, and correlates with IR orbit feedback signals

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 9 Left side motion is caused primarily by LER– whose SR shines onto the left side Left Right Raw data Correlation with LER current easier to see in the moments of different behavior of LER and HER currents Left Right

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 10 Reconstruction of IR motion Left side moves most Were lucky to install wire on the left side! Hydro system on the raft, wire and titmeters on magnets allow to reconstruct motion of magnets –Is there only common pitch of the raft and no magnet motion relative to the raft? Considered and rejected as unsupported by data –Is there transverse flexibility between Q2 and Q1 that would affect wire data? Considered and rejected. Q2-Q1 is rigid transversely Shown below is a preliminary but consistent model of IR magnet motion

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 11 Left raft IR magnet motion model Example of magnet position for two extremes. The raft pitch change by about 30  rad, the magnet position change by about 120  m. Model: on top of hydro data (motion of raft as a whole) add relative motion to be consistent with wire and tiltmeters. Most of deformation occur near Q2.

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 12 Left raft motion model details of the fit to wire data Model: use common pitch of the left raft, + relative on raft motion, dependent on the common pitch, to predict and make best fit to the stretched wire data. Measured wire dataModeled wire data

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 13 Left raft motion model details of the fit to tiltmeter data Model: use common pitch of the left raft, + relative on raft motion, dependent on the common pitch, to predict and make best fit to the tiltmeters data. Measured tiltmeter dataModeled tiltmeter data

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 14 Left IR magnet motion model AVI GIF

Andrei Seryi, 10/10/03, PEP-II MAC mtg. 15 Summary and next steps Installation of new alignment monitoring systems in IR-2 allowed to determine details of IR magnet motion Most of the fast (current-correlated) motion is on the left raft, due to LER SR, supposedly heating chamber near Q2 Next step is orbit modeling and optimization of orbit correction and location of correctors. Possibly, with use of feedforward from alignment systems. Can this motion be cured? –Re-steer orbit? (but there are many restrictions on orbit position…) –Mechanical design modification? –…