Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Use ofSiesta in VIRGO commissioning Lisa Barsotti University of Pisa – INFN Pisa For the Virgo collaboration Caltech, December 19th 2003.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Status of the Advanced Virgo detector F. Piergiovanni on behalf of The Virgo Collaboration GWPAW, Osaka, 06/17/2015.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
1 ILIAS Birmingham, 10/07/2008 H. Heitmann The Virgo+ shutdown.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Virgo Upgrades Toward Virgo+ Michele Punturo Virgo Collaboration INFN Perugia.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Pre-stabilized laser (PSL) for AdV Scope of the system Main tasks Requirements Reference solution and status of the design Plans towards completion Technical.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Loïc Rolland LSC-Virgo, Orsay- June 11th Virgo ‘timing’ calibration Loïc Rolland Note: Timing calibration during VSR1 in the Virgo codifier (VIR-028A-08,
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
“Detector activities” after the IB upgrade Michele Punturo.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Cascina, Nov. 4 th, 2008 AdV review 1 AdV Injection system E. Genin European Gravitational Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Alessio Rocchi INFN Roma Tor Vergata Thermal Compensation System for Virgo+
1 Frequency Noise in Virgo by Matt Evans. 2 The Actors  Noise Sources  Input Mode Cleaner length noise  Sensing noise on IMC lock  Frequency Servo.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
The VIRGO detection system
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Virgo+ Commissioning Status. Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics:
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Virgo – Injection SYStem
Frequency Noise in Virgo
Improving LIGO’s stability and sensitivity: commissioning examples
Status at the Prague meeting
Presentation transcript:

Virgo+ Commissioning Status

Main upgrades and activities Laser system: from 10  25 watt output power at the IMC TCS: ring + Central Heating Electronics: ADCs and DSP replacement, Global Control Viewports replacement NE mirror replacement CB electrical net and Grounding Infrastructure works to noise reduction (EE room)

Viewports replacement In Virgo the total number of viewports to be finally changed is 91 = 41 He-coated + 48 uncoated + 2 YAG coated Taking into account delivery + installation time complete substitution  15 December Some are “historical viewports” for visual inspection, others will be no needed before some months (photon calibration) Mounting only the really needed viewports for correct ITF working the number is reduced to 55 – these viewports are now all available IB, IMC, PR, BS, WI substituded - WE, NI, NE, DET expected to be ready for 15 October Viewports no more in the critical path NE mirror to be installed in second week of October

Central Building Electrical net (old) In the years the electrical net has grown by “additions” in the scheme red lines are UPS lines – blue lines are ENEL (Italian Electrical distributor) lines

Central Building electrical net (new) Shut down during this week to complete replacement

Grounding The ground net has been reviewed, rationalized, mostly re-cabled Work ends during this week shut down

May 2008 Virgo noise budget (8 watts no TCS) Eddy currents noise? Many environmental noises and control noises below 50 Hz are near Virgo design (magnetic and diffused light not shown here)  could explain a large fraction of the noise at low frequency  to be further worked on at restart Eddy currents noise (if any) will be reduced with smaller magnets

Environmental noises Noise from EIB (May 6th) Good modeling of the coupling of diffused light to DF => Non negligible contribution  40 Hz Improvements planned: - Optics: Continue ‘cleaning’ Better beam dumps NE transmission /4 - Reduce the motion of benches:  Improve benches mechanics  Resonance dampers  Electronics racks removed from Laser Laser in the new EEroom - Improve AC: shutdown work in central building See talk by I. Fiori

Injection: Modifications of LB and EIB for Virgo+ Goal : Increase the laser power up to 50 W (at the output of the laser bench).

Virgo+ new laser and ISYS (part of) installation sequence : done so far. Laser amplifier integration (end of may) Pre Mode-Cleaner cavity integration (june) - Seed power = 19W  Power incident on PMC = 60.3W  T PMC =87.7%  P outPMC = 52.9 W. New IMC end mirror has been installed (beginning of july) TF measurements - Local control re-design and IMC locked The commissioning of ISYS loops has started (BMS, IB AA and MC AA up to maximum power (27 W transmitted by the IMC)). New tie-rods installation under the EIB to rigidify the bench (analysis going on). Input power remote tuning system installation (after EIB faraday isolator). IMC matching fine adjustment (contrast defect 8% with 15W at the IMC input port). MC AA new filters implementation.

Plan for ISYS end of installation and commissioning BMS, IB and MC AA loops commissioning (1W, 8W and full power), IMC cavity characterisation: OLTF (measurements with different powers), Finesse, losses, … IMC and SIB faraday isolator thermal effects checks. Laser, amplifier and Pre Mode-cleaner alignment optimisation (due to laser pumping diodes displacement in EEroom). IMC remotely controlled loop gain adjustment installation (to ensure to keep the IMC locked from low power up to high power). SIB Faraday isolation improvement by adding an halfwave plate between the first polarizer and the Magneto-optic crystal (2 weeks are needed).  ISYS commissioning should be completed by the end of october.

TCS Use of the central heating Install first the TCS with only the ring heating

Electronic upgrades New control electronics: –Functional tests of whole chain (ADC, Gc software, timing) –Put in use and validate ADCs for monitoring channels (October) –Install a DSP in the WI tower and test - Inertial Damping – (October) –The rest of electronics : ADCs for angular and longitudinal controls, new DSP on all towers, will be installed and commissioned progressively Virgo ADC Pr RIO Gc RIO – C36 Sc DSP Virgo DAC DAQ\RIO Pr_Gc - Fb RTPC DAQ Control DOL link DAQ DOL link TOLM link Signals sent via the new Optical link (TOLM) - Test of Frame Builder and Global control on Real Time PC

Definition of T 0 ISYS commissioned All needed viewports installed NE new paylod installed TCS ring heating installed Env. ADCs installed, new DSP under test in WI tower, new GC under test A detailed plan can be found in Mwebpages/ Mwebpages/ T0T0 T0 is expected to be at 31th of October

Main steps toward VSR2 1) Hot ITF reasonable sensitivity 2) Standard configuration (Compensated 8 watt) 3) High power

1 – Reasonable hot ITF sensitivity 1)Retuning of demodulation phases for locking up to step 8. Retuning of locking and alignment phases and gains. (2 weeks) 2)Reaching step 8 (1 week) 3)Output Mode cleaner recovering – step 9 (1/2 week) 4)Low noise locking filter retuning –step 10 (1/2 week) 5)Force reallocation on the marionette and low noise on suspensions – step 11 - (1/2 week) 6)Retuning of noise control suppressions (  ) – step 12 – (1/2 week) 7)Noise hunting towards a reasonable sensitivity – (3 weeks) Total time to reach status 1  8 weeks. Notice: in this scheme it is assumed that the GC used is still the old one, as well as control and sensing ADCs.

2 – Standard configuration TCS commissioning and standard configuration. The goal is to reach a status of the interferometer defined as the working at 8 watt power and with fast lock recovering. This configuration is called standard. Tests up to 25 watts 2.1) Characterization of cold interferometer. The input power is 1 watt. The goal is to define the working point of the ITF, measure the sidebands aberrations in cold state, compare with simulations ) Locking Phases and gains retuning to reach step 8 – 1 week – 2.1.2) Sidebands aberrations measurements. Maps of working point – 1/2 week 2.1.3) Optical characterization and ITF working point definition – 1/2 week 2.1.4) TCS Transfer function measurement and characterization – 1 week 2.2) Power rising to 8 watts maintaining the ITF controlling aberrations. Implementation of central spot for fast lock recovering  standard configuration 2.2.1) Input power rise to 2 watt. Thermal effect measurement and TCS control with annular and central spot – 1 week 2.2.2) Power to 4 watts. Thermal effects and fast recovering - 1/2 week 2.2.3) Power to 8 watt. Thermal effects control. – 1/2 week 2.2.4) Thermal effect control at 8 watts. Tests at 16 watts – 1 week 2.2.5) Power to 8 watt - Fast recovering procedure identification. 25 watts tests – noise hunting - 1 week 2.2.6) Standard configuration definition. 25 watts tests- noise hunting - 1 week - Total time to reach status 2, the standard configuration  8 weeks.

Hardware upgrades Hardware to be upgraded: New coil drivers Installation of ADCs for detection and control New DSPs Photodiodes under vacuum Phase camera AC noise mitigation (see talk of I. Fiori) Total time: 6 weeks of non-parallel works (exclusive ITF use)

3 – High full power Low noise full power. Science Mode definition. The activities will be devoted to obtain a 25 watt input power configuration in ITF working point as defined by standard configuration. 3.1) 25 watt - annular thermal effects control. Noise hunting – 2 weeks 3.2) Fast lock recovering. Noise hunting - 2 weeks 3.3) Noise hunting and SM definition– 6 weeks Total time to reach status 3, ITF in SM  10 weeks.

Conclusion The highest uncertainties concerne the periods of noise hunting. Considering the previous time schedules the VSR2 should start at the end of June.

Actuators noise reduction DAC DSP CoilDriver G DeEmphasisEmphasis 2 nd order New Actuator noise projection (Dec 21 st ) DAC noise Marionette DAC noise Ref mass Eddy currents (upper limit) Hz Marionnetta Reference mass Mirror magnets Actuator noise projection (May 5th) DAC noise Marionette DAC noise RM (End) Eddy currents (upper limit) Expected DAC noise RM with new CD Hz Emphasis DeEmphasis - Actuator noise reduction since Jan 2008: - BS - End mirrors RM - End mirrors Marionetta - New coil drivers: - validated in the lab - improved filtering defined and tested with small magnets on NI  to be used at the restart with the smaller magnets on end mirrors Next: 1/ use new CD on end mirrors 2/ use new CD on all RM (priority:BS) 3/further reduce marionetta actuator noise 1/G

Status expected at T0 The new viewports installed in the basic configuration: this will allow the complete commissioning of Virgo+. Not allowed photon calibration and some visual inspections of mechanical parts of the towers. The NE payload will be mounted, the SA retuned and local control recommissioned. The injection system will be commissioned. Also the Faraday Isolator remote tuning will be commissioned. The ITF is roughly aligned. The TCS will have the installations of the annular compensation in both the input towers. The central spot and power stabilization will not be installed at T0. Sensing Electronic: monitoring ADCs will be installed. Not yet installed the Control ADCs and Detection ADCs. Whole timing system characterized. The cabling and suspension tuning for under vacuum photodiode installation will be performed. A new DSP prototype being tested with Inertial Damping in a tower.