TK3333 Software Management Topic 7: Schedule Control.
Advertisements

Chapter 7 Schedule Control
Chapter 8 Resource Considerations. 22 Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Chapter 8: Scheduling Resources and Costs
Scheduling
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Project Management 6e..
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Chapter 8 Resource Considerations. 22 Learning Objectives Learn how to take resource constraints into account Determine the planned resource utilization.
Chapter 7 Networks and Scheduling Project Management for Business, Engineering, and Technology.
9-1 Resource Allocation Some definitions Resource allocation, loading, leveling Expediting and crashing projects Goldratt’s “Critical Chain”
Importance of Project Schedules
Project Management Techniques.
Project Time Management
6 Resource Utilization Teaching Strategies
OPSM 639, C. Akkan Resource Planning Resources affect the schedule, cost and performance of a project. Resources are –Individual people, departments/teams,
THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Scheduling Resources Chapter 8.
MANAGING PROJECT RESOURCES
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Allocating Resources to the Project
Lecture 5 – Gantt Chart GANTT Charts Constructing GANTT Charts
Software Project Management Task Estimating and Scheduling
Project Management OPER 576 Resource Allocation Greg Magnan, Ph.D. May 6, 2004.
Chapter 8 Resource Considerations
MANAGING PROJECT RESOURCES
Scheduling Resources and Costs CHAPTER EIGHT PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Quick Recap.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Topic 5.8 ( only HL ) IB Business & Management Project Management Mr L Greenbank 1.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Scheduling Resources and Cost
Resource analysis Project management (lecture + seminar)
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Chain Scheduling, PERT, and MS Project 2003.
PROJECT MANAGEMENT Approaches
Pegasus Project Management: Resource Factors November 8, 2001 MBA 253 The Pegasus Group: Mario RossoMario Rosso Phil RandolphPhil Randolph.
MEM 612 Project Management Chapter 6 Allocating Resources to the Project.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Chapter 6 Scheduling. 222 Learning Objectives  Estimate the duration for each activity  Establish the estimated start time and required completion time.
TK3333 Software Management Topic 6: Scheduling. Contents  Estimate the duration for each activity  Establish the estimated start time and required completion.
Resource analysis 1 Project management (seminar).
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Chapter 8 Resource Considerations
ENGINEERING MANAGEMENT (GE 404)
Project management (seminar)
Scheduling Resources and Costs
University of Debrecen Mongolian University of Life Sciences
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Presentation transcript:

TK3333 Software Management Topic 8: Resource Consideration

Contents Learn how to take resource constraints into account Determine the planned resource utilisation for a project Level the use of resources within the required time frame Determine the shortest project schedule with limited resources 2 2 2 2 2 2 2 2 2

Real World Example Vignette: Human Genome Project In the 1980s, the US Department of Energy recommended a study to define the entire human genome. The US government began funding for scientists in the US to join the Human Genome Project. The project began with a $3 billion budget and a completion date of 2005. Because of lack of technology in 1990, they spent the first few years creating tools they might need. Once better technology was available, the scientists could work more efficiently. The Human Genome Project finished 2 years ahead of schedule, and $400 million under budget. Scientists were able to identify 99% of the human genome. 3 3 3 3 3 3 3 3 3

Real World Example Vignette: Indiana Road Construction Project The state of Indiana decided to close a stretch of Interstate 65 and Interstate 70 in Indianapolis for construction. A total shutdown of the road would allow work crews to work through the night to complete the project in 85 days. It would take 250 days without a total shutdown. The state knew that closing the highway would be an inconvenience- approximately 175,000 vehicles travel the highway each day. They decided to devise a communication campaign to inform the public about the highway closing. Construction began in May 2003 with no major problems. The public knew in advance about the project, so they were able to use alternate routes or public transportation.

Resource-Constrained Planning Nearly all projects have limits on available resources. Project delays often occur due to certain resources being unavailable. A network diagram can be drawn to reflect the availability of a limited number of resources. 1st: Arrange based on technically constrained activity sequence. 2nd: Arrange based on resource constraints, if any. 5 5 4 5 4 4 4 4 4

Resource-Constrained Planning Arrange Food Invite Guests Set Venue .... With resource constraints Arrange Food Invite Guests .... Set Venue Without resource constraints 5 5 4 5 4 4 4 4 4

Planned Resource Utilisation It is necessary to indicate the amounts and types of resources needed to perform each activity. E.g. 7 7 5 7 5 5 5 5 5

Planned Resource Utilisation Based on the information in the network diagram, a resource utilisation chart is produced: No. of painters x No. of days Total of painters for the day Source: pg. 244-245 7 7 5 7 5 5 5 5 5

Planned Resource Utilisation 2 alternatives to draw resource utilisation charts: Based on each activity’s earliest start time => as-soon-as-possible (ASAP) schedule. Based on each activity’s latest start time => as-late-as-possible (ALAP) schedule. 7 7 5 7 5 5 5 5 5

Planned Resource Utilisation Based on the resource utilisation chart, a resource profile is produced: Uneven utilisation of painters Source: pg. 244-245 7 5 7 7 5 5 5 5 5

Resource Leveling Resource leveling, or smoothing, is a method for developing a schedule that attempts to minimise the fluctuations in requirements for resources (i.e. uneven distribution). This method levels the resources so that they are applied as uniformly as possible without extending the project schedule beyond the required completion time. 6

Resource Leveling Source: pg. 244 Critical path: Paint 1st Floor + Paint Stairs &Hall = 12 days => cannot be touched (if we don’t want to delay the project). “Basement” can delay 8 days (12-4 days); “Bedroom” can delay 6 days (12-6 days); “Bathroom” can delay 2 days (12-8-2 days) 2 alternatives: Delay the activity with the most +ve slack (i.e. “Basement” +8 days slack) by 6 days (i.e. it starts after “Bedroom” is finished) => can use the same person to do both. Delay “Bedroom” by 4 days (i.e. it starts after “Basement” is finished). 6

Resource Leveling If choose Alternative 1 : More even utilisation of painters Source: pg. 246-247 6

Resource-Limited Scheduling Resource-limited scheduling is a method for developing the shortest schedule when the number or amount of available resources is fixed and cannot be exceeded. This method will extend the project completion time if necessary in order to keep within the resource limits. It is an iterative method where resources are allocated based on the least slack. Least slack has the higher priority. 8 8 6 8 6 7 6 6 6

Resource-Limited Scheduling Presuming only 2 people are available: 1st Priority 1st iteration; 1st Priority 2nd Priority, which one? Shifted to after Day 8 (when 2 painters are free) Source: pg. 248-249 8 8 8 6 7 6 6 6 6

Resource-Limited Scheduling 2nd iteration 1st Priority Cannot touch - critical Has to be sacrificed Shifted to after Day 12 (when 1 painter is free) 3rd iteration Has to be sacrificed Source: pg. 251-252 8 8 8 6 7 6 6 6 6

Project Management Software Provides excellent features for handling resource considerations within a project. Allows you to create and maintain a list of resources. Resources can be assigned to various tasks within a project. The user is informed if any resources have time conflicts or if they are over-allocated. Numerous resource allocation reports can be generated. 10 10 7 10 7 8 7 7 7

Some notes … During scheduling, assume unlimited resources. Or else, it takes forever to work out the schedule. If resources are unavailable, techniques such as resource leveling and resource-limited scheduling can help. Software can only calculate, not decide. We have to set the inputs i.e. duration, dependencies etc. “Garbage-in-Garbage-out” Don’t be too rigid about “must start/end” dates. Let the software calculates based on your inputs. 10 10 7 10 7 8 7 7 7

Some notes … Do not assume people to work more than 50-60% of the time. Knowledge workers (e.g. software engineers) are not like factory workers (who are tied to their workstations). For knowledge work (i.e. engineering and programming), the maximum duration of an increment should be 1-3 weeks. Or else, it will reach 90% completion and stays forever. Why? Time % Complete 100 Due to: Discovering “must-do but forgotten” things. Debugging => It’s common to find the solution after the deadline so that the work is completed in one simple step. DEADLINE 10 7 10 10 7 8 7 7 7

Discovering “must-do but forgotten” things Some notes … If duration of knowledge work is too long. Discovering “must-do but forgotten” things Time % Complete 100 DEADLINE Time % Complete 100 Debugging DEADLINE 10 7 10 10 7 8 7 7 7

Some notes … Major causes of reduced resource availability: Having people work on too many projects at the same time. Every time a person “shifts gears”, it takes time for them to remember where they were, get the momentum etc. No one should work more than 2-3 projects. Ideally, one project is enough. Overallocation of people to their work. Queuing theory – if no “out”, no chance of “in”. No system should be loaded beyond 85% capacity for very long. 15% should be reserved to respond to “turbulence”. Estimating is guessing. All activities are probabilistic, not deterministic. It is best done with past experience. 10 10 7 10 7 8 7 7 7

Some notes … Parkinson’s Law (1955): Goldratt’s Principle (1997): Work will always expand to take as long as has been allowed. Projects never finish early! Goldratt’s Principle (1997): A project will accumulate delays but will never accumulate gains (i.e. always costs more than necessary and takes longer than it should). Accept variations. It is OK to have variations (i.e. allows dates to vary) as long as the project finishes on time (i.e. some early, some late => variations will average out). Takes “typical values” for the estimates. 10 10 7 10 7 8 7 7 7

Some notes … What if, we have no past experience. How to estimate? Use consensual estimating. Ask several individuals who know something about the task for an estimate. Understand the variations among the estimates given by the individuals. Choose a single realistic number that everyone agrees and can support. May take time but it is worthwhile. When ask for estimates, ask both: actual working time & calendar time. Why? We are always juggling tradeoffs between those times. Actual working time => labour costs; calendar time => completion time. 10 10 7 10 7 8 7 7 7

Some notes … In many projects, we don’t own the resources; they are provided by functional managers on a temporary basis. The necessary signatures should be obtained in a project plan sign-off meeting. The functional managers should be clear that their signatures indicate their commitment to provide resources when and in the quantities they say. If we have more than one project, prioritise them. Ensure products are produced over time, rather than all at once. Total Sales Revenue Generated Time Time Total Sales Revenue Generated 10 7 10 10 7 8 7 7 7

Thank You Question? Next (27/4) : Mid Sem (20%) Cost Planning and Performance Mid Sem (20%) Tue 4/5 8.15pm; Topic 1-8