Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim.
1 A DIRC for GlueX Paul Mueller Oak Ridge National Laboratory and Stefan Spanier University of Tennessee, Knoxville BaBar DIRC Collaboration for the GlueX.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
Focal Plane Scanner Jeff Martin University of Winnipeg with: Jie Pan, Peiqing Wang, David Harrison.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
CEDAR Support Structure and PMT Test Peter Sutcliffe 13 th July 2011 CERN via EVO.
The HERMES Dual-Radiator Ring Imaging Cerenkov Detector N.Akopov et al., Nucl. Instrum. Meth. A479 (2002) 511 Shibata Lab 11R50047 Jennifer Newsham YSEP.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
A Reconstruction Algorithm for a RICH detector for CLAS12 Ahmed El Alaoui RICH Workchop, Jefferson Lab, newport News, VA November th 2011.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
PHOBOS TOF Construction Status
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
CLAS12 activity at IPNO D2I: Design, realization and test of the Central Neutron Detector J. Bettane, J.L. Cercus, B. Genolini, G. Hull, M. Imre, A. Maroni,
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Status of Aerogel detector for high pT upgrade at PHENIX Budget from US-J project for next two years : (1) 400 liters of Aerogel (2) 600 photomultiplier.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Cherenkov Counters for SoLID Z.-E. Meziani on behalf of Simona Malace & Haiyan Gao (Duke University) Eric Fuchey (Temple University) SoLID Dry Run Review,
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
SoLID HGC Update Zhiwen Zhao,Weizhi Xiong, Gary Swift Haiyan Gao,Garth Huber 2015/09/12 1.
Update on SBS Simulations Andrew Puckett and Freddy Obrecht University of Connecticut SBS Weekly Meeting 3/3/2015.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Barrel PID upgrade K. Inami (Nagoya) Ljubljana, Hawaii, Cincinnati and PID group - R&D status - Structure design - Prototype study - Beam test - Photon.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
O. Atramentov, American Linear Collider Workshop, Cornell U July 2003 Fast gas Cherenkov Luminosity Monitor Progress Update O. Atramentov, J.Hauptman.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
CLAS12 Drift Chamber Prototyping
Modifying the PMP (remove some GEM’s add a scintillator coordinate detector) -JJL (8/29/2012)
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Downstream Cherenkov Gh. Grégoire University of Louvain MICE collaboration meeting RAL, October 28, 2004 Design study for the Technical Reference Document.
TORCH IOP meeting Manchester March 31, 2015 TORCH Maarten van Dijk On behalf of the TORCH collaboration (CERN, University of Oxford,
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
CDMS II Shielding To Installation To Construction From Design.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
Stereo Collab Meeting | CEA Saclay July-2015 Conclusions.
The Ring Imaging Cherenkov Detectors for LHCb Antonis Papanestis CCLRC – RAL On behalf of the LHCb RICH group.
Jim Fast Pacific Northwest National Laboratory
rich1 magnetic shielding
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
SoLID HGC Update Zhiwen Zhao 2016/01/13.
Presentation transcript:

Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg, VA USA SBS Meeting January 16, 2013 In collaboration with: H. Yao, William and Mary B. Wojtsekhowski, S. Esp, Jefferson Lab A. Ahmidouch, S. Danagoulian, NC A&T K. Anoil, Cal. State LA J. Annand, Glasgow Physics Department at William and Mary Wiki:

Motivation: High Rate Running Expect 4-5x increase in total luminosity over previous BigBite running. Assume 4-5x background rate. 30 degree scattering angle Segmented PMT array (29mm tubes), 9(8) x 60 tubes Search for timing clusters in 5-10 ns window. Magnetic shielding between rows. Locate PMT array on large angle side away from beam line. Shield beamline for EM background. C 4 F 8 O heavy gas at 1 atm

Simulation and Design Design based on GEANT 4 simulation and geometric constraints from BigBite detector package 65 cm path length, 85 cm keep out Single reflection from cylindrical mirrors. Not focusing on specific PMT’s, not sensitive to precise mirror geometry/alignment Clusters with avg 10 PMT’s/event and 1.7 p.e.’s/tube

Electron and π efficiencies

Design First draft of design complete. Iterating on details. Detector vessel made from frame of angled aluminum with sheet aluminum sides Small angle side removable for internal access. Windows glued onto box directly. 9 (8) x 60 array of PMT’s in iron box, with mu metal and iron strips/bars between rows. Attach to vessel, removable. Removable mirror frame.

Mirror Frame

Mirror alignment Mirror

Mirror Tests Received sample of Al coated Lexan, flat pieces, from ECI coatings. H. Yao to measure reflectivity in test stand for flat and then curved mirrors. Assemble prototype mirror mount at W&M to test ability to shape and align mirror. Optimize mirror design. Procure mirrors—W&M. Quote for 6 mirrors ~$7k

PMT Array Shielding Box NC A&T

Magnetic Shielding TOSCA simulations using mu-metal and iron plates between PMT rows.

Light Cones Aluminized plastic cones

NC A&T Status A. Ahmidouch, S. Danagoulian Responsible for PMT shielding box: prototype and full assembly We have all necessary quotations. We submitted POs for some of the items In the process of submitting the remaining POs. We will have a prototype with 34 PMT, fully assembled, including – iron shielding bars between rows – mu-metal shielding bars – light catchers When we receive iron bars and light catchers, then we will send them for mirror deposition.

Electronics, HV, Cables All 1877s FastBus TDC’s and level translators (from MWDC) are ready. Need 64 channels of +HV. Provided by JLab Flat twisted ribbon cables for TDC’s—Jlab, W&M. NINO-based amplifier, discriminator cards— Glasgow. Prototype testing underway. J. Annand visiting Monday. K. Anoil recently purchased cards.

Manpower and Budget

Plans Finish production drawings for vessel, mirror mounting, March 31 st, 2013 – Send drawings for quotes, April – Fabrication, Summer 2013 – Assembly, Fall 2013 – Testing, late 2013 Finalize mirror design studies by March 31 st – Order mirrors April, May