The Evolution of Integration between PI and SAP By: Rich Winslow 1999 PI Users Conference.

Slides:



Advertisements
Similar presentations
Design Validation CSCI 5801: Software Engineering.
Advertisements

Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Manager Product Overview.
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
Main Menu F3 Exit = Press F3 to exit this screen. Commonly Use Keys: F4 Prompt = Position cursor in front of ‘?’ location and press F4 to display a list.
Multi-Mode Survey Management An Approach to Addressing its Challenges
Network Management Basics Network management requirements OSI Management Functional Areas –Network monitoring: performance, fault, accounting –Network.
Integrating The Datacenter OpalisRobot MOM Operator.
Interface Strategies and Methods.
Software Delivery. Software Delivery Management  Managing Requirements and Changes  Managing Resources  Managing Configuration  Managing Defects 
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
The Production Process
SWE Introduction to Software Engineering
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Enhancing Paper Mill Performance through Advanced Diagnostics Services Dr. BS Babji Process Automation Division ABB India Ltd, Bangalore IPPTA Zonal Seminar.
Introduction to SAP R/3.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Solution scenario Validated Pharmaceutical plant
AgVantage IT Services Systems Management Team Partnered with You and IBM® Agenda Disaster Recovery Service Disaster Recovery Service IT Visors IT Visors.
AMG Attendance System Product Description Copyright © 2009 AMG Employee Management, Inc.AMG Employee Management, Inc.
Overview SAP Basis Functions. SAP Technical Overview Learning Objectives What the Basis system is How does SAP handle a transaction request Differentiating.
H-1 Network Management Network management is the process of controlling a complex data network to maximize its efficiency and productivity The overall.
Andrea Sartori Solution Architect EMEA
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.
IT – DBMS Concepts Relational Database Theory.
Computers & Employment By Andrew Attard and Stephen Calleja.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
AL-MAAREFA COLLEGE FOR SCIENCE AND TECHNOLOGY INFO 232: DATABASE SYSTEMS CHAPTER 1 DATABASE SYSTEMS (Cont’d) Instructor Ms. Arwa Binsaleh.
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
August 01, 2008 Performance Modeling John Meisenbacher, MasterCard Worldwide.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Week 5 Lecture Distributed Database Management Systems Samuel ConnSamuel Conn, Asst Professor Suggestions for using the Lecture Slides.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
UpgradeX and CloudSuite What you need to know. WHY?
EASTMAN 1 Direct Materials Sharing ideas for a shared future PI and SAP... The Eastman Experience Eastman Chemical OSI Software Sharing ideas for.
INFO1408 Database Design Concepts Week 15: Introduction to Database Management Systems.
Manag ing Software Change CIS 376 Bruce R. Maxim UM-Dearborn.
OSIsoft High Availability PI Replication
PI Gateway to SAP R/3 Ron Kolz, Gretchen M. Schwenzer, Ph.D OSI Software, Inc.
Database Administration
University of Sunderland COM 220 Lecture Seven Slide 1 Database Users & Administration.
The Million Point PI System – PI Server 3.4 The Million Point PI System PI Server 3.4 Jon Peterson Rulik Perla Denis Vacher.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
CS525: Big Data Analytics MapReduce Computing Paradigm & Apache Hadoop Open Source Fall 2013 Elke A. Rundensteiner 1.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
SOFTWARE ENGINEERING. Objectives Have a basic understanding of the origins of Software development, in particular the problems faced in the Software Crisis.
Microsoft Dynamics ® NAV 2009 Service Management.
Install, configure and test ICT Networks
Enterprise Resource Planning (ERP) The need for integrated information in business.
Biosolid Design Spec Brief April 21, Overview Design Overview Proposed System Architecture User Interface Subsystem Interfaces Package & File Organization.
CS223: Software Engineering Lecture 18: The XP. Recap Introduction to Agile Methodology Customer centric approach Issues of Agile methodology Where to.
University of Nebraska Medical Center FM & P: Made Possible By Our Steering and Core Team Members. Presented by Katharine Susman, Senior Programmer/Analyst,
If you have a transaction processing system, John Meisenbacher
1 Acquisition Automation – Challenges and Pitfalls Breakout Session # E11 Name: Jim Hargrove and Allen Edgar Date: Tuesday, July 31, 2012 Time: 2:30 pm-3:45.
OSIsoft High Availability PI Replication Colin Breck, PI Server Team Dave Oda, PI SDK Team.
The Compelling Solution . .
SAP Overview.
Make-to-Stock Scenario Overview
High Availability 24 hours a day, 7 days a week, 365 days a year…
Enterprise Processes and Systems
Maximum Availability Architecture Enterprise Technology Centre.
Make-to-Stock Scenario Overview
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.
Database Management System (DBMS)
Innovia Consulting Customer Conference 2018
Purge-it! USP's, pre-sales process & helping the customer to decide
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Bridging the Gap Between Technology and Business
UpgradeX and CloudSuite
Presentation transcript:

The Evolution of Integration between PI and SAP By: Rich Winslow 1999 PI Users Conference

Outline Introduction Why Integrate? Requirements/Constraints Upgraded Design Strategies Interface Architecture / Sample data Fault Tolerance Resource Requirements Integration Savings Key Learnings / Summary

Why Talk Again Provide a reality check to last year’s pre- startup presentation Change your perspective on SAP integration, so you ask the right questions and do sufficient prototyping up front

Why Integrate PI and SAP? Handle consumption rate of 1100/day Minimize manual entry and their errors Minimize recipe & BOM maintenance Calculate complex data summaries not available manually or in SAP Get SAP off the shop floor

Integration Requirements/Constraints Use off-the-shelf software solutions Consumptions and productions from PC to SAP Map SAP reservations to PC consumptions Small generic SAP control recipes to PC (Note: PC = Process Control)

Post-Startup Integration Requirements/Constraints Remove backflushing from SAP due to time and complex lot assignments. Prevent sending any over-consumption to SAP Custom front-end, but use SAP for validation with automated contingencies via PI when SAP is down.

Upgraded Design Strategies Distributed PI systems (1 NT server/area) One SAP interface to the process systems Minimize SAP control recipe instructions Eliminate SAP screens on the shop floor (Eliminate the use of PP-PI sheets) SAP is the master of inventories and genealogy, but PI is its backup when SAP is down.

Topology

Off-the-shelf Architecture

Interface Architecture SAPMS SQL DB SAP RFC Custom Layer PI DB Std PI Process Interfaces Multi-Vendor Control Systems What to produce What is pre-allocated SAP Order id BOM id Where and When Materials consumed Material produced By-products created Release parameters

Interface Architecture SAPMS SQL DB SAP RFC Custom Layer PI DB Std PI Process Interfaces Multi-Vendor Control Systems Product 612 Curd 61, Batch 13 Order BOM 612_Line2 Line 2, 3/26/98 8:05 - 8:32 Curd 61, Batch 13, 250 gal, 8:15 NaCl, Batch 924, 10 gal, 8:24 Product 612, 10K sqft, Batch 75 Pellets, 45 lbs, Batch 12A High quality, pH 4.75

Customized Architecture

Fault Tolerance Distributed PI servers; 1 per area (When PI is down, production is down) Time independent interfaces (PI to SAP) with automated contingencies Common Hardware with Raid 5 & 1 full spare server (4 hour reconstruction time) Daily incremental and Weekly full system and Automatic PI database backups Recovery from communications failure *

Resources (# of people) Manufacturing Experts (15) Business Analysts (4) SAP System Analysts Project facilitators (0) Process Info Experts (4) (30)

Resources Manufacturing Experts (10) Business Analysts (4) SAP System Analysts Project facilitators (2) Process Info Experts (4) (15) Integrators (2)

Integrator System analyst Knowledge of: –Manufacturing processes –Workflow Application Independent –Not application biased –Efficient use of multiple platforms Someone within the company

Integration Savings (Based on 1000 SAP Orders/day) Support Labor savings: –3 SAP super users (100%) & 6 data clerks (100%) vs –1 programmer (5%) & 1 SAP super user (10%) Based on manual entry via PI-PI sheets Job functions: develop, test, support, maintain

PP-PI Sheet Maintenance VBDB Units Product Independent Prod 1Prod 2Prod 3Prod 3a Unit A Unit B PI Sheet A1 PI Sheet A2 PI Sheet A3 PI Sheet B3a ISQL

Error Propagation Error correction: –Rolling back the error –Adding the correct messages 20 mins1 instruction repair 1 hr1 instruction on multiple rolls 12 hrCross shift coordination 24 hrs>50 rolls 48 hrs>100 rolls

Support/Problem Resolution Check for incomplete orders (daily) Review error log (daily/on-demand) Load BOMs into SAP and PI-SAP (on-demand) Correct problems and retry failed orders (on- demand) –BOM correction –Operator entry correction

Key Learnings Just “Had” to integrate evolved to wanting to Integration is far more than a simple data pipe Evolved away from a labor-intensive off-the-shelf design Integration: systems and people… requiring a higher commitment to teamwork SAP control recipe is not a DCS control recipe Learn to archive SAP before startup 1999 PI Users Conference

In Summary SAP and control systems have awesome capabilities, but integration is individual Design across platforms, not simply within a platform or at their interface points Include automated contingencies for planned and unplanned SAP outages (4 hrs) Potential: Genealogy, PI Futures

By the Way Unexplained problems are by default the integration programmer’s fault… Even if there is no integration in that area!