Telescope Mount Assembly (TMA) Status and Schedule Design Contractor: Empresarios Agrupados (Madrid Spain) Fabricator: Asturfeito (Asturias, Spain) LSST.

Slides:



Advertisements
Similar presentations
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Advertisements

PDR Process Level B and C. UC PERFORMANCE & DEVELOPMENT REVIEW 2009 – Academic Staff Staff member preparation (Academic staff) Supervisor preparation.
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
Lab 09: Performance Test 1 Advanced Energy Vehicle.
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
HEGRA HESS I HESS II 10m 2 108m 2 600m 2 Personal view Stimulate a discussion.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
First-Year Engineering Program Performance Test 1: Design Concept Comparisons Objective and Goals Lab Procedure Analysis Test Readiness Review.
Template For Building Project Schedule Jazz Presentation.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
Section 2 Capital Project Life Cycle. PROJECT PHASES Project development تطوير المشروع Turn Over التسليم والضمان Detailed design التصميم التفصيلي Preliminary.
Monday Morning J. Sebag T&S Systems Engineer. Close Past… 2 M1M3 acceptance and transportation to storage Reviews and RFPs (Dome, Software, Coating Plant,
Sandrine Thomas (T&S Project Scientist) & Telescope and Site Team.
( ELR) - 1 STEREO - Solar Terrestrial Relations Observatory Mission STEREO SWG STEREO OBSERVATORY Status Edward Reynolds APL STEREO Project Manager.
Telescope Integration and Tests Tuesday Afternoon.
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master Safety in the Procurement Process Bill.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Critical Design Review (CDR)
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
US Project Plan for MICE Mark Palmer Peter Garbincius, Alan Bross, Rich Krull Fermilab November 24, 2014.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
Middle Fork Project Relicensing Process Plan April 25, 2006.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
College of Engineering, EEIC Ethical Dilemmas Ethical dilemmas arise when there are multiple Stakeholders with conflicting interests. Good ethical practice.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Refine Preliminary Design. Schedule Week 9 - Refine Preliminary Design Week 10 – Test/Evaluate Design Week 11 – Continue Final Design, Fabrication Updates.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
4.5 K Cold Box Schedule Recovery Directors’ Review
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Nevada Next Generation 511 System 9 months to design, test and deploy
LSST Commissioning: FY18 Planning
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Chuck F Claver LSST System Scientist & Commissioning Lead
All Wales Safeguarding Procedures Review Project
Ocean Observatories Initiative
GLAST Large Area Telescope: Cost/Schedule Review September 1, 2005
X-ray Pump-Probe Instrument
Multi Subsystem Software Pathfinders
STAFF SCHOOL IMPROVEMENT IN-SERVICE
Potential Milestones A timeline to finish in one year
Tracking new discoveries using file history
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Advanced Energy Vehicle
Vendor Interactions Paul J. Lotz.
STEEL PLATES.
Tropical cyclones movement
February 2007 Note: Source:.
Review plan of the nature reporting – update 6
East Hall under construction
2015 January February March April May June July August September
Presentation transcript:

Telescope Mount Assembly (TMA) Status and Schedule Design Contractor: Empresarios Agrupados (Madrid Spain) Fabricator: Asturfeito (Asturias, Spain) LSST Telescope and Site Manager: Shawn Callahan (Tucson, Az)

TMA: Circa 8/5/2015 Dynamic performance meets TMA structural requirements as specified in LTS-103 sections 3.3

TMA Major Milestones: updated 8/4/2015 YearMilestoneDate 2015Preliminary Design Review 80% completion September 28-October Final Design review by subsystemsOctober 30 – December Azimuth track and concrete pier complete April All TMA components ready for installation December Factory testing reviewMarch All hardware delivered to portJuly TMA assembled at siteMay TMA testing complete on siteJuly 15

80% Preliminary Design Review Schedule FEA modal resultsJuly 31Comments Cad model frozen and available for review August 4Available in LSST vault All review materials available from EA September 4Post to Docushare (LSST reviews all materials) LSST Team Comments dueSeptember 21All comments collected using Jira Preliminary Design Review (Madrid) September 28-October 2Focus on design as developed, critical risk areas, and those requiring decisions. PDR report dueOctober 9Prepared by review team Approve PDR to advance to FDROctober 28 (Goal)

Final Design approval milestones Azimuth Track assembly closedOctober 30, 2015 Steel Plates BOM ApprovedNovember 1 Telescope structural design approvedNovember 15 Main drive design approvedNovember 15 Hydrostatic bearing system approvedNovember 30 Mount Control System approvedDecember 28 Steel Plates Material at shop (75%)December 15