STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Daniel Schoerling TE-MSC-MNC 1 Review of AD-ELENA TL dipole Daniel Schoerling on behalf of WP 2.2 ELENA IIC meeting 27 th February 2014.
Cryogenic Experts Meeting (19 ~ ) Heat transfer in SIS 300 dipole MT/FAIR – Cryogenics Y. Xiang, M. Kauschke.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
CERN 4 th /5 th December 2012 Todays speaker Paul Allen 1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Powered Magnets, DB Formation and Decelerator Alexey Vorozhtsov (JINR) International Workshop on Linear Colliders October 2010.
Magnet designs for Super-FRS and CR
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
The construction of the model of the curved fast ramped superconducting dipole for FAIR SIS300 synchrotron P.Fabbricatore INFN-Genova The construction.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
CLIC QD0 R&D Status 1 Michele Modena, CERN TE-MSC IWLC10, WG5, 21October 2010.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
11 T Dipole Status at FNAL Fred Nobrega January 21, 2014.
1 COMPTON POLARIMETER PRELIMINARY MAGNET DESIGN 06/03/08 Christopher Vidal, Senior Mechanical Designer Ernie Ihloff, P.E., Engineering Group Leader EE.
CTF3 Coll meeting 22 Jan 08 Purushottam Shrivastava 1 Summary Status of Indian Contributions to CTF 3 Project * *Presented by Purushottam Shrivastava On.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
Bending Magnets for the Metrology Light Source
A Presentation On Construction Of Turbo Generator
HIGH RAMP RATE SUPERCONDUCTING MAGNETS AT BNL Peter Wanderer BNL Archamps Workshop, March 2003.
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
SBS Magnet and Support Status Robin Wines June 2013.
LARP Collaboration Meeting Racetrack Coil Fabrication
PIP-II Solenoid Focusing lens for SSR2 Cryomodule Kumud Singh, Affiliation: Bhabha Atomic Research Centre PIP-II Technical Meeting 19 Jan 2016.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Baby MIND magnet design or “how to best magnetise a steel plate” Alexey, Etam, Gabriella, Helder, Herman Baby Mind Magnet CERN June 10, 2015.
STATUS REPORT ON VACUUM CHAMBERS (Dipole & Straight) & DIPOLE MAGNETS FOR TL-2 OF CTF3 A.K. JAIN, S.S. PRABHU, S. KOTAIAH RRCAT, INDORE (INDIA)
Magnets Attilio Milanese Doing Business with CERN
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
PRESENTED BY:- HATHALIYA CHIRAG DESAI NIKHIL SHAIKH PARVEZ PATEL VISHAL.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
Panda Forward Dipole Magnet design status International Workshop on Antiproton Physics and Technology at FAIR November 2015 Budker Institute of Nuclear.
WP15.4 Status March 2017.
A new QF1 magnet for ATF3 Alexey Vorozhtsov
Iranian Light Source Facility, IPM, P.O. Box , Tehran, Iran
One plane dipole corrector for the CLIC MBQ TYPE 1
Full-scale trial results to qualify optimized manufacturing plan for ITER Toroidal Field coil winding pack in Japan Dummy double-pancake (DP) winding was.
Some Design Considerations and R &D of CEPCB Dipole Magnet
6th BINP-FAIR-GSI Workshop,
The design schemes of the low field dipole magnets
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
CTF3 – TL 2 VACUUM CHAMBER FABRICATION STATUS REPORT Jan 22, 2008
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
FRESCA2 Update on the dipole design and new calculations
CHEN, Fusan KANG, Wen November 5, 2017
Magnets for the ESRF upgrade phase II
Main magnets for PERLE Test Facility
Brief Status Report on Fabrication of ATF2 Quads
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Fusan Chen, Wen Kang, Mei Yang*
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
CEPC Booster Ring Magnets
SAME 15 existing quadrupoles (QFS, QDS, QFL)
Electric Machine Design Course
Presentation transcript:

STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)

Specifications  Sr. No. Parameters Values (Type-1) 35 0 Values (Type-2) Nominal Field1.3 Tesla 2Nominal current340 A 3Pole Gap45 mm ± 50 micron 4Pole width240 mm 5Coil Pocket size176 mm (width) X mm (height) 6Yoke Length0.465 m(0.235 m) 7Magnetic Length0.518 m0.268 m 8Bending Angle35°17.5° 9Construction Length0.92 m0.69 m 10Core weight1273 kg640 Kg 11Coil weight860 Kg.445 Kg 12No of Pan Cakes44 13No of turns48/pancake 14Total no of turns192 15Resistance60 milli-Ohm32.5 milli-ohm 16Voltage20.4 Volts11.3 volts 17Power dissipated6.8 Kilo-watt(3.8 KW) 18Cooling water flow9.5 LPM 19Pressure drop2.4 ata1.24 ata 20No of cooling circuits44 21Water temperature rise 11  C5.8  C 22Quantity Required2 Nos.3 Nos. DIPOLE MAGNET

DIPOLE MAGNET ASSEMBLY Overall Size of Assembled Dipole Magnet (35  bending angle) Magnet height – 640 mm Magnet Width – 1000 mm ( ) Magnet Length – 910 mm Magnet total weight kg

Fabrication Stages : Laser Cutting of Stampings. Stacking of stampings & pressing to form a block. Welding of stampings to get block. Machining of pole surface & other reference surfaces. Assembly of two blocks along with water cooled coil pancakes.

Stacking Fixture

Stacking Fixture with laminations

First short magnet core assembly at RRCAT

Coil winding

Coil potting

Finished coil and magnet assembly

Magnet measurement of first dipole magnet at RRCAT Details of coil interconnections

Assembled short magnet

Packing of short magnet

Arrangement for safe transportation

Final packing ready for shipment

Painting of remaining cores

Magnet Core Fabrication Inspection Details – Before welding Sr noMagnet no Magnet type Block noPacking Block dimensions before weldingDate of factor Left top Left bottomRt top Rt bottomcentrecompletion 1 CLIC-TL2-DP-S-01 First Shortfirst /8/2007 second /8/ CLIC-TL2-DP-S-02 Second Shortfirst /10/2007 second /10/ CLIC-TL2-DP-S-03 3rd Shortfirst /10/2007 second CLIC-TL2-DP-L-01 First Longfirst /9/2007 second /9/ CLIC-TL2-DP-L-02 Second Longfirst second /10/2007

Magnet Core Fabrication Inspection Details – After welding Sr noMagnet no Magnet type Block no Block dimensions after weldingTotalDate of Left top Left bottomRt top Rt bottomcentreweightcompletion 1 CLIC-TL2-DP-S-01 First Shortfirst /8/2007 second /8/ CLIC-TL2-DP-S-02 Second Shortfirst /10/2007 second /10/ CLIC-TL2-DP-S-03 3rd Shortfirst /10/2007 second CLIC-TL2-DP-L-01 First Longfirst /9/2007 second /9/ CLIC-TL2-DP-L-02 Second Longfirst second /10/2007

Short dipole magnets Long dipole magnets

Dipole Magnet Fabrication Status as on 15 th Jan 2008 Stages of FabricationS-1S-2S-3L-1L-2 Machining work 2 blocksCompleteCompletedComplete Assembly of CoreCompleteCompletedComplete Coil winding 8 pan cakesComplete Winding Started Coil Potting 4 double pan cakes Complete Magnet Assembly workCompleted dt Completed on 4 th Jan 2008 Completed on 11 th Jan 2008 Magnet Magnetic Testing workComplete Painting workCompleteComplete except finish coat Packing in BoxComplete 18 th Dec 07

S-1 - Short Dipole Magnet Magnetic Field Measurement Results Current Amp B 0 in Tesla dB/B 0 for 120 mm radial dist B 0 L in Tesla-mm dBL/B 0 L for 120 mm radial dist 166 A A A A

Further Work Optimization of first short dipole magnet entry-exit taper angle at CERN. Providing same taper on entry-exit block of all balance 4 dipole magnets at RRCAT, India Magnetic measurement of remaining 4 dipole magnets at RRCAT, India