PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.

Slides:



Advertisements
Similar presentations
Project Proposal: Multifamily Weatherization UES Scoping Study Regional Technical Forum June 1 st, 2011.
Advertisements

Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Residential New Construction (NC): Slab Insulation UES Measure Update Regional Technical Forum March 18, 2014.
Residential Single Family Clothes Washer UES Measure Update Christian Douglass Regional Technical Forum February 18, 2015.
Commercial Clothes Washer UES Measure Update Regional Technical Forum February 19, 2014.
D EEMED M EASURE R EVIEW P ROJECT Final Report December 7, 2010 Regional Technical Forum Presented by: Michael Baker.
Transformer De-Energizing & Dairy Plate Heat Exchanger Standard Protocol Proposal Presentation to the RTF February 20, 2013.
The Saga Continues: Measure Interactions for Residential HVAC and Wx measures Regional Technical Forum April 23, 2014.
Ductless Heat Pumps in Manufactured Homes with Zonal Electric Resistance Heat Adam Hadley Regional Technical Forum February 18, 2015.
UES Measure Sunsets Regional Technical Forum December 17, 2013.
Variable Frequency Drives (VFDs) for Potato/Onion Shed Fans UES Measure Update Regional Technical Forum April 23, 2014.
Commercial Tank Water Heaters Out-of-Compliance (OOC) UES Measure Recommendation Regional Technical Forum November 19, 2013.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Prescriptive Duct Sealing UES Measure Proposal Regional Technical Forum Subcommittee July 8, 2013.
1 Proposed Changes to the RTF’s Heat Pump Specifications Impact on Estimated Deemed Savings and C&R Discount Program Credits.
Residential New Construction Montana House: UES Measure Update Adam Hadley Regional Technical Forum April 14, 2015.
Advanced Power Strips (APS) Planning UES Measure Proposal Regional Technical Forum August 20, 2013.
Guidelines for RTF Measure Economics Estimation Methods (formerly Cost and Non-Energy Benefits Guidelines) Progress Update to the Regional Technical Forum.
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Pre-Rinse Spray Valve Small Saver UES Measures Regional Technical Forum September 17, 2013.
Residential Single Family HVAC UES Measures Proven and Planning UES Measure Proposals Adam Hadley Regional Technical Forum December 16, 2014.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Oregon ENERGY STAR Homes Measure Update Adam Hadley Regional Technical Forum March 17, 2015.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
RTF Staff, Subcommittee and Work Updates November 1, 2011.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
Air Source Heat Pump Specifications Proposed Revisions Regional Technical Forum Subcommittee July 2, 2013.
N ETWORK PC P OWER M ANAGEMENT June 28, 2011 Regional Technical Forum Presented by: Bob Tingleff SBW Consulting, Inc.
RTF Delivery Verification Guidance Batch 1 Jennifer Anziano Regional Technical Forum May 12, 2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Single Family Weatherization and HVAC UES Measures Follow-up from August RTF.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
Out-Of-Compliance UES Measure Recommendations Part 1 – November Measures Regional Technical Forum November 19, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
RTF Staff, Subcommittee and Work Updates October 4, 2011.
Variable Speed Heat Pumps Provisional UES Proposal Presentation to the Regional Technical Forum September 18, 2012 Presentation by Kacie Bedney, Bonneville.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
Residential New SF Energy Star Homes Idaho and Montana UES Measure Updates: Energy Star Homes, DHP TCO Homes, and BOP2 Homes March 18 th, 2014.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
Implementer’s Group May 2015 Meeting Debrief and Upcoming Meeting Prep May 19, 2015.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum March 18, 2014.
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat Proven UES Measure Proposal Regional Technical Forum October 16, 2013.
Commercial Clothes Washers UES Ryan Firestone Regional Technical Forum April 14, 2015.
Applying SEEM Updates, Calibration, and Measure Interaction Decisions to: Manufactured Homes Weatherization UES Measures Regional Technical Forum December.
Commercial Clothes Washer UES Measure Update Regional Technical Forum April 16, 2013.
Residential Showerheads UES Update Ryan Firestone Regional Technical Forum October 20, 2015.
Residential Refrigerator UES Measure Update Regional Technical Forum April 16, 2013.
Idaho and Montana Residential Single Family New Construction Measures Mohit Singh-Chhabra Regional Technical Forum October 20 th, 2015.
PTCS Subcommittee Recommendations ARHI Certification for Standalone Heat Pump Commissioning and Controls Measures AND Simplified Heat Pump Sizing Method.
Planning UES Measures: SF New Construction Heat Pump Upgrades (9.0 HSPF and VCHP) Heat Pump Commissioning Controls and Sizing Adam Hadley Regional Technical.
Planning UES Measures: Prescriptive Duct Sealing SF Performance-based Duct Sealing SF Performance-based Duct Sealing MH Adam Hadley & Josh Rushton Regional.
RTF Management Update Jennifer Anziano Regional Technical Forum July 21, 2015.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Non-Residential Network Computer Power Management Christian Douglass Regional Technical Forum January 21, 2016.
Agriculture Irrigation Hardware UES Measure Update Regional Technical Forum April 16, 2013.
Residential Single Family Clothes Washer UES Measure Update Regional Technical Forum September 16, 2014.
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
Commercial Efficient Tank Water Heater UES Measure Update Regional Technical Forum December 17, 2013.
Research planning at the RTF and Research check-ins & sunset extensions: Commissioning, Controls, and Sizing of Ducted Heat Pumps Ductless Heat pumps for.
RTF’s Engagement with Research Jennifer Light RTF Policy Advisory Committee February 19, 2016.
Heat Pump Water Heaters: Interior, Ducted Installations Presentation to the Regional Technical Forum December 13, 2011 Ben Larson, Ecotope
Ductless Heat Pumps (DHP) in Single Family Homes with Zonal Electric Heat UES Measure Update Regional Technical Forum June 17, 2014.
Proven UES: Residential Dishwasher Proposal to Deactivate Jennifer Anziano Regional Technical Forum November 10, 2015.
Presentation transcript:

PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014

Measure Overview Measure Specification (summarized)Specification – When installing a new heat pump, ensure it’s installed to the PTCS specifications (sizing, controls, airflow, etc.). Measure History – April 2012: Approved as proven (category) active (status), staff to clean up documentation. – Nov 2012: Change status to under review (staff had trouble linking the key savings parameters to the study results) – Dec 2013: Extend sunset date to May 2014 to a) incorporate last-in analysis, b) revise the measure specifications, and c) develop a research plan to re-establish an understanding of baseline and efficient-case installation practices. Current Standing: Expired, Proven, Under Review 2

Progress since December A) Last-in Analysis – Plan to present all SF Wx and HVAC measures at July meeting. B) Measure Specification Update – No progress made since July 2013 subcommittee meeting.subcommittee C) Research Plan – Staff is working on research plan (with Bob Davis). 3

Outline of Proposed Research plan Data Collection Baseline: – For 160 houses that recently received a (non-PTCS) heat pump, collect the following data: Heat Pump Sizing – House Audit, including ducts, to get heat load, then balance point Heat Pump Controls – Control of resistance heat – Compressor operation at low ambient Real-world capacity of the heat pump – Airflow across indoor coil – Indoor coil temperature split Efficient-case – For 160 houses that recently received a PTCS heat pump, collect the same data as above. Rough, Ball-park, Estimated Cost $500 per house for field data collection = $160,000 Recruiting, data analysis, reporting = $160,000 Total$320,000 4

Staff Recommendation Either: (A) – Revise Sunset Date, move to Planning, Under Review Change category to Planning – Don’t know baseline energy use; Don’t know efficient-case energy use Leave status as Under Review – Need to develop a research plan – Need to revisit savings assumptions 100% compliance with the specification in the efficient-case is not reasonable considering results of many of the previous QA visits – Need to come to a conclusion on the measure specification Set Sunset Date to December 2014 – Provide time to develop research plan, revise savings assumptions, and finalize measure specification Plan to Modify Savings – Not today, but as part of moving from Under Review to Active (B) – Deactivate Bring this measure back when it has its act together. 5

Decision “I _________ move that the RTF approves the UES measure PTCS Commissioning, Controls, & Sizing as: ________________.” 6