G.Trubnikov on behalf of JINR Directorate, Dubna NICA MAC, 19 Oct 2015 status and plans.

Slides:



Advertisements
Similar presentations
1 Nuclotron-based Ion Collider fAcility I.N.Meshkov for NICA Working Group Scientific Workshop Dedicated to The Centenary of V. I. Veksler's Birth and.
Advertisements

“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
Application of cooling methods at NICA project G.Trubnikov JINR, Dubna.
PLANS JINR PARTICIPATION for JINR PARTICIPATION FAIR PROJECT: in the FAIR PROJECT: - ACCELERATOR TECHNOLOGY A.Kovalenko 103 session of the JINR Scientific.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
1 Round Table Discussion III Searching for the mixed phase of strongly interacting matter JINR, Dubna 5-6 November 2008 Project of The Nuclotron-based.
State supporting science and technology challenge. Measures for modern scientific landscape. By Lyudmila Ogorodova Deputy Minister, Ministry of Education.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
Possibilities for further intensification of the JINR Educational Programme S.Pakuliak 110 th session of JINR Scientific Council September 15-16, 2011.
The Project NICA/MPD at JINR (Dubna) Search for the Mixed Phase of Strongly Interacting Matter at Nuclotron-based Ion Collider FAcility (1  1.5)·10 27.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
P. Spiller, SIS18upgrade, Peter Spiller GSI, Darmstadt Kick off Meeting - EU Construction DIRAC Phase SIS18 upgrade.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
Report from the Program Advisory Committee for Particle Physics to the JINR Scientific Council T. Hallman for J. Nassalski JINR Scientific Council Meeting.
1 Machine Advisory Committee Video-Conference JINR, Dubna May 20, 2009 Concept and Status of The NICA Project Nuclotron-based Ion Collider fAcility I.Meshkov.
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
Joint Institute for Nuclear Research in N.Russakovich NEC’2009 Varna Bulgaria.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Heavy ion collider facility NICA at JINR (Dubna):
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Polarized deuterons and protons at NICA А.Коваленко NICA-SPIN_PRAGUE 2013 Charles University, Prague, July 7-12, 2013.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
A.N.Sissakian, A.S.Sorin Very High Multiplicity Physics Seventh International Workshop JINR, Dubna, September 18, 2007 Status of the project NICA/MPD at.
Status of the Source of Polarized Ions project for the JINR accelerator complex (June 2013) V.V. Fimushkin, A.D. Kovalenko, L.V. Kutuzova, Yu.V. Prokofichev.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
Status of RF stations for NICA project MAC meeting october 2015.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
SC Magnets TF International Collaborations JINR Accelerators Detectors TF SPD Infrastructure InnovationEducation IT НИЦ КИ BSU GSI NECSA ISMA NANU.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
1 Alexey Sissakian Director, Academician of RAS JINR: Results and Prospects R–ECFA meeting 8 – 10 October, 2009.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 5-6, 2003 Dubna, Russia.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
1 1/15 Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Development of the Nuclotron Accelerator Complex for generation heavy ion beams with an energy of 5 GeV/u (project “Nuclotron-M” – 1 st stage of the NICA/MPD.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
New approach to the Topical Plan of Research of the JINR N. Russakovich 23/11/2006.
Conference of Young Scientists and Specialists "Alushta 2016" Morozov V.
1 PAC for Particle Physics JINR, Dubna January 14, 2010 Status of the TDR for NICA project Nuclotron-based Ion Collider fAcility G. Trubnikov for NICA.
1 NICA Project at JINR Nuclotron-based Ion Collider fAcility I.Meshkov for NICA team September , 2011, Alushta, Ukraine hosted by JINR, Dubna IX.
Itzhak Tserruya Weizmann Institute of Science
Three stages of the NICA project: status and tasks
NICA injection complex status
Heavy ion physics perspectives, Bad Liebenzell, September 2007
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Perspectives for Heavy-Ion Collisions at Future Facilities
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A. Martynov on behalf of accelerator division.
Status of the Nuclotron-M project
HIAF Electron Cooling System &
“Electron cooling device in the project NESR (FAIR)"
EU-Russia Cooperation in the Areas of Science, Research and Innovation
Status of the NICA project at JINR
Veksler and Baldin Laboratory
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
ADS Accelerator Program in China
Other issues and concepts under study Conclusions References
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
Project "Nuclotron M" / NICA
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

G.Trubnikov on behalf of JINR Directorate, Dubna NICA MAC, 19 Oct 2015 status and plans.

The NICA accelerator facility: - cryogenic heavy ion source KRION of ESIS type + source of polarized protons and deuterons, - modernized linac LU-20 (existing) + a new heavy ion linear accelerator (HILac) - a new superconducting Booster synchrotron + existing SC HI ring of Nuclotron - collider: two new superconducting storage rings with two interaction points NICA basic parameters:  s NN = GeV; beams from p to L ~ cm -2 c -1 (Au),  s NN = GeV; p  and d  L ~ cm -2 c -1

NICA/MPD STAR F.T. NA-61/SHINE HADES CBM SIS-100 SIS-300 STAR BES II Interaction rate [Hz] Collision energy √S [GeV] I II energy region of max. baryonic density energy region of max. baryonic density Present and future HI experiments/machines NICA/MPD will provide most precise results exploring the whole phase space region in the most interesting energy range

Fixed Target Area Nuclotron (45 Tm) injection of one bunch of  2×10 9 ions, acceleration up to GeV/u max. Linac LU-20 Ion sources Booster (25 Tm) 1(2-3) single-turn injection, storage of (2  4)×10 9 ions, acceleration up to 100 MeV/u, electron cooling, acceleration up to 600 MeV/u Linac HILac KRION HIS NICA: Structure and Operation Regimes (Heavy Ion Mode) Stripping (80%) 197 Au 31+ => 197 Au 79+ Two SC collider rings ~ 22 bunches per ring

NICA injection complex (ion sources + HILac) B= 5.4T reached. Test Au beams produced: - Au 30+ ÷ Au32 32+, 610 8, T ioniz = 20 ms for - Au 32+ -> repetition rate 50 Hz. - ion beams Au 51+ ÷ Au 54+ are produced. Source assembled in 2013 now is commissioned to achieve ppp. First beam run in beg Heavy ion source: Krion-6T ESIS Source for polarized particles (SPP) Heavy Ion Linac delivered to JINR. Commissioning scheduled for Oct’15 NICA light ion injector (LU-20): RFQ linac, 150 keV A.Butenko, A.Tuzikov

Booster systems: progress is going Booster RF system and RF test bench BINP: Electron cooling system for Booster Serial production of cryostats and thermal shields – is in final stage at Poland. Serial production of dipole and quadrupole magnets started in Dec’2014 – two years 2.5 m 4.0 m Booster A.Smirnov, A.Eliseev, A.Tuzikov, V.Andreev

NICA: configuration of the Collider for Heavy Ion mode [ ] - element length ( ) - distance between elements E-Cooler Kickers of Stoch. Cooler Pick-Ups of Stoch. Cooler MPD SPD O.Kozlov, A.Sidorin, N.Shurkhno, A.Kobets, I.Meshkov

Stage 1: Cooling and stacking with RF1 barrier voltage (5kV). Accumulation efficiency ~ 95%, about injection pulses (55-60 to each ring) every 5 sec. Total accumulation time ~ 10 min. dP/p is limited by microwave instability. Stages 2-3. Formation of the short ion bunches in presence of cooling, RF-2 (100 kV, 4 resonators) + RF-3 (1MV, 8 resonators). From coasting beam => to 22 nd harmonics = > 66 th harmonics NICA Structure and Operation Regimes (Heavy Ion Mode) V RF & N ion, arb. units Phase, arb. units A.Sidorin, A.Eliseev

Magnetic measurements Curved UHV chambers Vacuum cryostats and SC twin quadrupole Ultra-high vacuum High-temp Superconductivity Collider pre-serial dipoles R&D for Collider and Booster A.Smirnov, V.Andreev

FZ Juelich Budker Institute of Nuclear Physics RAS, Novosibirsk: electron cooling systems, RF systems, warm magnets, control and diagnostics RAS INR, Troitsk: beam control and diagnostics, linacs IHEP, Protvino: beam feed-back, SC magnets, etc ITEP, Moscow: linacs, diagnostics, beam dynamics FNAL Darmstadt, Germany

LHe Liquefier OG-1000 (installation & commissioning): 96% completed ( ) LHe Liquefier OG-1000 (installation & commissioning): 96% completed ( ) Reconstruction of bld. 32: 14% completed ( ) Reconstruction of bld. 32: 14% completed ( ) Helium satellite refrigerator of Booster and Collider: 5% completed ( ) Helium satellite refrigerator of Booster and Collider: 5% completed ( ) Two He screw compressors (delivered): 94% completed ( ) Two He screw compressors (delivered): 94% completed ( ) LN2 Re-condensation (liquefier + 2 compressors) 12% completed ( ) LN2 Re-condensation (liquefier + 2 compressors) 12% completed ( ) LHe 40m3 reservoir: 0% completed (will start in 2016) LHe 40m3 reservoir: 0% completed (will start in 2016) Gaseous He purification system: 0% completed (will start in 2016) Gaseous He purification system: 0% completed (will start in 2016) He satellite refrigerator for Booster & Collider: 5% completed ( ) He satellite refrigerator for Booster & Collider: 5% completed ( ) Development of the NICA Cryogenics The cooling power should be doubled from 4 kW to 8 4.5K N.Emel’yanov, N.Agapov

12 NICA Civil Construction Contract for Working Documentation signed in Aug’14. Ready WDR – mid’ 15 Signed! 43 months A.Dudarev

13 NICA schedule The decommissioning is foreseen after 2040

NICA: Required resources from the JINR budget for Dedicated RF funding for NICA

What NEXT? … Prospects for NICA at 20 years Horizon - Experiments on the observation of spontaneous electron–positron pair creation in supercritical Coulomb fields (new 2 compact SC rings with merging bare Uranium beams). - Mass-spectroscopy of radioactive heavy ion beams in isochronous mode (using booster or collider ring) + measurement of nuclei PDF with colliding/merging electron beam (up to 1 GeV). - Accelerator physics R&D in: - SC linear injector for protons (MW beam as a goal) - high-field magnets - up to 5T - high brightness beams (Extrahigh luminosity mode) - Detector R&D in: - silicon trackers - large SC magnets and solenoids using HTSC

since the NICA will be the only facility providing heavy ion collisions at the collider mode in the energy range of maximum baryonic density; collisions of protons & deuterons with all combinations of transversal and longitudinal polarizations; variety of extracted heavy ion beams for applied researches. In its final stage NICA will represent high scientific excellence, pan-European relevance and a socio-economic impact NICA construction already involves Russian and European companies in active works for several years

Good visibility creates interest of new potential users of the facility. We anticipate increasing of the user base from ~ users now to more than 1500, when all facilities are constructed and fully operational. The main incentive for engaging of new users will be a unique nomenclature of ion and neutron beams and a scientific infrastructure created at the JINR, Dubna, RF. The requirements and procedure how to use the facility - regulated by JINR rules of project consideration and approval: Proposal for some megascience rules:

 The wide cooperation has been established for the development of the NICA accelerator and detector complexes, and for the theoretical support. This cooperation will be expanded taking into account the growing experimental collaborations; International cooperation  The inclusion of the NICA complex and other Russian megascience projects to the ESFRI and BRICS RI Road Maps will give a boost in attracting scientists all over the world for participation in the our project;  The development of the legislative base for international collaborations around Russian megaprojects has been started. NICA – is ideal example of existing RI;  The development of proper social infrastructure is required to give new attraction to Russian megaprojects. State programs could be a good support.

European commission on Russian mega-science projects (May-Dec 2013) The fact that NICA/JINR are part of the EU research infrastructures landscape has already been recognized by ESFRI. The Expert Group (EG) recommends that the NICA project be fully taken into account in the forthcoming discussions on the next update of the ESFRI Roadmap. The EG encourages JINR to continue actively develop new and extended cooperation with potential European partner institutions. The exceptional opportunities available in Dubna to young scientists and engineers should be more widely promoted. 08 Aug’13: Representatives of 13 countries 08 Aug’13: Representatives of 13 countries, 6 signed (Belarus, Bulgaria, Germany, Kazakhstan, RF, Ukraine). China and South Africa – are ready to join. Germany (BMBF, GSI) – to the Test Facility for SC magnets and STS, MoU China (ASIPP) – to the HTSC current leads, SC magnets, vacuum systems, MoU USA (FNAL) – to the NICA collider stochastic and electron cooling systems, MoU CERN – to the and MPD elements (drift chambers, MM systems…,, MoU Rep. of South Africa – cryostats, diagnostics for SC ion source, cryogenics, MoU HORIZON – 2020 ESFRI RoadMap Update 2016 BRICS global RI

EU-Russia Joint Cooperation Committee S&T (JCCST) 19 June 2015, Brussels, European Commission, Directorate-General for Research & Innovation. NICA – is in the Priority List for EU  Experience with H2020 and Targeted Programmes  Collaboration in thematic priority areas  Russian National Contact Points for Horizon 2020  ERA-NET.RUS Plus and thematic ERA-Nets  Large-scale facilities / Research infrastructures  Multilateral initiatives The Nuclear Physics Division Board of the EPS at its 70th Meeting (Leuven, Belgium, Oct 15-16, 2015) has accepted the JINR suggestion to host the 72nd Board Meeting (Sept.28-30, 2016) at JINR, Dubna. This EPS NPD Board decision is mainly motivated by its interest in visiting the old and new JINR flagship facilities (IBR-2M, DRIBs and NICA) to see their status and current development as well as to discuss their prospect collaboration with other EU scientific research infrastructures.

JINR-Brazil Forum, June Ambassador of Brazil to Russia. 16 Sept visit of 26 researchers and science officers JINR-South Africa Forum, September 2015

Meeting of the BRICS Funding Agencies in science and technology Moscow, Ministry of Education and Science, July’15 Decision to organize a coordination between BRIKS countries on Large Research Infrastructure (megascience projects): several in China (HIAF, ASIPP, JUNO, etc.), South Africa (SKA), India (supercomputer center, SR sources), Brazil (SR source, space center), Russia (NICA, PIK, Ignitor, SR4, SuperC-tau, XCELS). JINR – chair in the WG, NICA – submitted to BRICS development Bank

China-NICA- JINR Cooperation Scientific program of the NICA had been recognized as highly perspective for participation of China centers. Sides agreed to perform required agreement procedures to prepare signature of the Memorandum on the Governmental level providing China participation in the NICA megaproject

NICA International collaboration Megaprojects: Workshop in Dubna (Italy, Germany, France, China, Egypt, SAR, RF) JINR-France (IN2P3) MoU

Thank you for your attention! 25