00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
● Main goals for week 33: – Luminosity production; – First 150 ns bunch train attempts; – Roman Pots: check movement at 3.5 TeV, with 1b; – Off momentum.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
● 08h00: Adjust mode for end-of-fill study. Scraping test for determining transverse beam profile (beam 2, vertical). As expected, beam dumped with BLM.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
08:30 Machines in stand-by 12:30 Access in LHC for QPS and PC:  QPS quench heater power supply RB.A12  EPC for RSF2.A67B2 and RQ9.R8B1.  RCBH27.L1B2.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Monday 24 October hours of 25ns MD
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Daniel, Gianluca and Belen (for the Collimator team)
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the last 5 bunches are kicked.  Kicklength for beam 1 shorter than for beam 2: beam 1: 7.85 us beam 2: 8.1 us.  Injection kicker pulse length increased by 200 ns on B1. Operational limits in injection kicker app updated accordingly. IQC limits also adjusted.  Updated the operational limits for the MKIs...these were still rather relaxed. 18:15: fill #1883 dumped by SIS interlock (OFSU down)  47.5 pb-1 in around 18 hours. Refill delayed due to RF problems (noise) in the SPS. Tuesday June 21 st LHC morning report

Long fill #1883 after 15h in stable beams LHC morning report

47.7/46.3 pb-1 collected LHC morning report

18:44 Summary of BLM intervention:  Configuration for Mobile monitors have been deployed in LSA. We need to restart the concetrator in order to pickup the new configuration.  Restarted the COLSA  Restarted the COLSA3  Result: The 6 new monitors appear in the display. the 2 of them which have been already connected show a signal.  Note: the remaining 4 channels need still configuration in the processing electronics and (probably) access. to be done at a later time. QHPS is discharging in S12 (cell 23.L2).  Masked the SW interlock "RB_A12_QPS_OK" because one of the quench heaters on MB.A23L2 is discharged. Tuesday June 21 st LHC morning report

01h30: Pilot bunches from SPS  stopped due to a number of things: bad beam quality in the SPS, Persistent BPM LSS4(new) interlock, crash of BIC cfv-ba4-cibtt40 When injecting beam:  the injection oscillations on the horizontal plane for both B1 and B2 were very large (~4mm) and not realistically correctable.  The horizontal emittances were bimodal and very large... something was kicking the beam in the horizontal plane.  Suspect that there is still a problem with the RF synchronisation & rephasing between SPS and LHC. (Note that CNGS worked well over night, so for us this rules out beam position at extraction.) Beam dump at 07:45 (if at 3.5 TeV). Machine on standby at 08:30 at the latest - until 12:30. No access. Wednesday June 22 nd LHC morning report

Injection Oscillations LHC morning report

Distribution LHC morning report

Screen LHC morning report

12:30: Restart the accelerators. Check injection kicker pulse. Collimation loss maps (450 GeV, 3.5 TeV): ran out of 4 week qualification interval. Next intensity step: 1092b  1236b Ahead LHC morning report