1 | INALA TECHNOLOGIES TEST PROCEDURE: ECS2, SAM2, SAM1.5 & ACCESS VERSION 1.0.

Slides:



Advertisements
Similar presentations
iServ Technical Firmware Manual
Advertisements

Samsung PC Studio Manual PC Connectivity Via USB
Drupal Basics Part 5 Understanding Blocks Using the theme Agricultural Communications Services Integrated Media Training Sessions
Advance4.0 SP5b Installation Guide Local installation for user workstation.
X-Call Version V3.0 User Guide
Department of Environmental Conservation 1 DATAMAX PRINTER SETUP MODULE 1.
Reprogram the DAGR and Maps Installation
Niobrara R&D Corp Compact PLC Upgrades With the CERI.
DAP-1520 FAQ’s Wireless AC750 Dual Band Range Extender.
Unit Test Calibration Training
DSL-2870B How to Change ADSL Username and Password in your modem router How to Change Wireless Channel in your modem router How to Open Ports in your modem.
Riso Digital Education Center Appendix for SRC Training Basic Course 1.
CASH DRAWER CONFIGURATION GUIDE. 1.PRINTER PORT connect the drawer at the back of the printer using RJ11 connector 2.SERIAL PORT connect the drawer at.
NFN Configuration Tool
hotEx RADIUS Manager Installation
Remote Accessing Your Home Computer Using VNC and a Dynamic DNS Name.
HCare access on an iPad hCare access is the remote access to PGH. The steps for installing vary from the Mac somewhat. This will guide you. Installation.
Field Proven Performance – Industrial Grade Support DATA-LINC GROUP Training: LincView OPC Released: 2012/02/04.
HUAWEI TECHNOLOGIES CO., LTD. Page 1 Firmware Upgrade & Dashboard Update of Huawei E220 USB Modem HUAWEI TECHNOLOGIES CO., LTD.
Copyright© 2003 Avaya Inc. All rights reserved Upgrade to Communication Manager 2.0 with Migration to Linux 8.0 Purpose: This presentation was prepared.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
U81X0 Downloading Tool Manual 1 ( Version 1.2 ) FlashRW For U81X0 Version 4.0.0(Build #95V) February 2004 LG Electronics Inc.
Otasuke GP-EX! Chapter 11 GP-Viewer EX
1. Go to Assign Assist Assess Teacher View in Conference School 2. Log in. 3. User Login:
How to Correctly Format an Essay using Microsoft Word.
Test Procedure: ECS (E1/Eth), SAM2, SAM1.5 & Access
1 | INALA TECHNOLOGIES ECS-L TESTING : VERSION 1.0.
Click to edit Master subtitle style Mobile Test Suite Installation and configuration Paul Shepherd Senior Repair Technician Zebra Technologies Europe Limited.
Hardware Training Product: ITMS2.
1 | INALA TECHNOLOGIES INSTALLATION TRAINING: ECS (EQUIPMENT COMMUNICATIONS SYSTEM) ECS (ETH/GPRS) COMMISSIONING VERSION 1.0.
INAlA TECHNOLOGIEs Installation Training:
INAlA TECHNOLOGIEs Installation Training:
INAlA TECHNOLOGIEs Installation Training:
7200 Samsung Confidential & Proprietary Information Copyright 2006, All Rights Reserved. 1/16 OfficeServ 7200 Enterprise IP Solutions Data Server S/W Upgrade.
Overview of MSWS Control of 212-LC July 15, 2006.
U81X0 Downloading Tool Manual 1 ( Version 2.0) FlashRW For U81X0 Version 4.0.0(Build #100V) April 2004 LG Electronics Inc.
How to Setup Scan to on most Sharp Models.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
Quick guide to ASIMON configuration For version 3.0 or greater SAFETY AT WORK Date: 3/18/2009.
Updating firmware on the STM32F4 Discovery Board.
[Presentation Title] – Edit this footer by clicking on “View” tab,  “Slide Master” button  this slide’s layout [Date] Changing... Leading... Learning...
Biosimilar (Insulin) – Competitive Landscape and Market & Pipeline Analysis, 2016 DelveInsight’s, “Biosimilar (Insulin) – Competitive Landscape and Market. Request for sample of this research report:
4000 Imaje 4020 – Software Imaje 4020 – Content ■ Content of Chapter Software: 1. Flash Up 2. Netcenter 3. FTP 4. Active X 5. XCL commands 6. Exercise.
* pls connect PC via Lan cable to DVR * click Intranet icon, then click the “content”
 Charging and Syncing the iPod Touch Cart Lesson 2.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Performing Troubleshooting Tasks with Response Point Response Point Troubleshooting Scenarios Joe Schurman Founder, Executive Director Evangelyze Communications,
1 AIG_AW880W Write IMEI guide Date : LONGCHEER CONFIDENTIAL.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Version of the document: 1.01 Software Version CBox: v3.7.1 Hardware Version CBox: C5 Remote Access Configuration Client Language: English.
Frequently Asked Questions (FAQ)
Supervisor Training (Fee Computer)
XT Camera Firmware Update Process
XT Camera Firmware Update Process
FlashBack-4 Training June 2014
Do-more Technical Training
Data Server S/W Upgrade Samsung Electronics Co., Ltd.
CMS Central Version 1.0 Made by Eden Sun Jan 2010.
Em4 Ethernet tutorial Remote connection.
A Software for Weighing Systems
Crouzet touch Quick start.
HDV130/100 Upgrade Firmware March
iSERIES PROGRAMMING/LOGGING TRAINING
Call to Fix HP Printer Error Code Oxc4eb827f
How to Update or Upgrade to macOS Mojave on Mac?.
Software for Eligible Beneficiaries Accession
ADC32RF45 Testing.
ZXP3 Printer Driver Installation and settings for EPIC Cards
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
How To Use The FD92 Digital Camera
Presentation transcript:

1 | INALA TECHNOLOGIES TEST PROCEDURE: ECS2, SAM2, SAM1.5 & ACCESS VERSION 1.0

2 | TESTING SUMMARY SAM Training 1.Set up SAM2. 2.Set up ECS2 communication controller. 3.Test communication to SAM1.5 or SAM2 unit via ECS2 coms Controller 4.Test communication to Access Control unit via ECS2 coms Controller

3 | SAM2 SET UP – VIA RS232

4 | SAM2 – RS232 SAM Training RS232 Communication Test; Connect a straight RS232 cable between the Lap Top and the SAM2 RS232 port(DB9 Connector on front panel Open SAM2 ECT Select “Com Port” and double click on “Password”

5 | SAM2 – SET UP VIA RS232 CONTINUED SAM Training RS232 Communication Test; Cont; Active communication will be shown on the bottom left as indicated with the RED circle until it says “received” 1.Click on “Load Config” and select the applicable config file. 2.Click on “Update SAM” and wait until SAM has been updated – This can be seen on the bottom left as indicated with the RED circle until it says “received” 3.Click on “Sync Time” 4.Click on “Get Config” and ensure that SAM2 shows you the current date and time. 5.Capture SAM2 Serial number. 6.Click on “Update” 7.Click on “Set Config”

6 | SAM2 – SET UP VIA RS232 CONTINUED SAM Training RS232 Communication Test; Cont; 1.Click on “Alarm Configuration” tab 2.Select “RS485” under “Coms Config” 3.Click on “Set” 4.Click on “Get Config” 5.Click on “Set Config” Check that “Intruder” alarm is number “9” Check that “Movement” alarm is number “11” Close SAM2 ECT

7 | ECS2 COMMUNICATION CONTROLLER SET-UP

8 | ECS2 COMS CONTROLLER – SET UP SAM Training ECS2 Coms Controller Set up; Connect a USB printer cable between the Lap Top and the ECS2 Coms Controller USB port. Open ECS2 ECT Select “USB” and click on “Login”

9 | ECS2 COMS CONTROLLER – SET UP SAM Training ECS2 Set Up: Check that the units has the latest Firmware version being “Build 1.6” If Not on latest version, upgrade to latest version 1.Click on “Upgrade to V1.6” 2.Click on “File” then “Load Config” 3.Click on “Update uniit” 4.Click on “Site Inventory”

10 | ECS2 COMS CONTROLLER – SET UP SAM Training ECS2 Set Up: 1.Capture ECS2 Coms Controller Serial number. 2.Click on “Update unit” 3.Click on “Configuration” Tab 4.Click on “Update unit” 5.Close ECS2 ECT

11 | TESTING COMMUNICATION TO THE SAM OR ACCESS CONTROL UNIT VIA THE ECS2 COMMUNICATION CONTROLLER

12 | SAM2 COMMUNICATION TEST VIA THE ECS2 COMMUNICATION CONTROLLER

13 | SAM2 – COMMUNICATION TEST VIA ECS2 COMMUNICATION CONTROLLER – “RS485” SAM Training RS485 Communication Test; Connect a USB printer cable between the Lap Top and the ECS2 communication Controller USB port Open SAM2 ECT Select “TCP” and insert (USB IP Address) and Port 301 and double click on “Password”

14 | SAM2 – COMMUNICATION TEST VIA ECS2 COMMUNICATION CONTROLLER – “RS485” SAM Training RS485 Communication Test; Cont; Active communication will be shown on the bottom left as indicated with the RED circle until it says “received”

15 | SAM1.5 COMMUNICATION TEST VIA THE ECS2 COMMUNICATION CONTROLLER

16 | SAM1.5 – COMMUNICATION TEST VIA ECS2 COMMUNICATION CONTROLLER – “RS485” SAM Training RS485 Communication Test; Connect a USB printer cable between the Lap Top and the ECS2 communication Controller USB port Open SAM1.5 ECT Select “TCP” and insert (USB IP Address) and Port 310 and double click on “Password”

17 | SAM1.5 – COMMUNICATION TEST VIA ECS2 COMMUNICATION CONTROLLER – “RS485” SAM Training RS485 Communication Test; Cont; Active communication will be shown on the bottom left as indicated with the RED circle until it says “received”

18 | ACCESS CONTROL COMMUNICATION TEST VIA THE ECS2 COMMUNICATION CONTROLLER

19 | ACCESS CONTROL – COMMUNICATION TEST VIA ECS2 COMMUNICATION CONTROLLER – “RS485” SAM Training RS485 Communication Test; Cont; 1.Click on “TCP” and insert IP address Click on “Connect” 3.Click on “Logon” 4.Click on “Open Door” 5.Click on “Get Version” 6.Click on “Get Time” 7.Click on “Log off” 8.Click on “Exit” Responses should be received as indicated in the Red circle

20 | CLICK TO EDIT MASTER TITLE STYLE THANK YOU