DEMAND FLOW TECHNOLOGY

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
JIT, TPS, and Lean Operations
Just-in-Time and Lean Systems
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Class 12: Chapter 8: Lean Systems Class 12 Agenda –Review Exam question challenges –Review Grade Sheet –Discuss Classroom Performance Process –Comments.
© 2007 Pearson Education Lean Systems Chapter 9. © 2007 Pearson Education How Lean Systems fits the Operations Management Philosophy Operations As a Competitive.
Just-In-Time “Eliminate Waste”.
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
1 JUST IN TIME SYSTEMS Figen KAS Dokuz Eylul University Industrial Engineering Department.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Operations Management
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
Just-In-Time & Lean Systems
LEAN system.
JIT and Lean Operations
Just in Time Neil Towers. Definition of Just in Time Wherever possible no activity should take place in a system until there is a need for it. The system.
Chapter 7 – Just-in-Time and Lean Systems
UNIT 4. All facilities, functions, activities, associated with flow and transformation of goods and services from raw materials to customer, as well as.
JUST IN TIME Operational Systems for Manufacturing… JIT and Lean Production.
Value-Based Systems: ABM and Lean 22. Value-Based Systems and Management OBJECTIVE 1: Explain why managers use value-based systems and discuss their relationship.
Lean Thinking and Just- in-Time Systems JMP 5023 OPERATIONS & TECHNOLOGY MANAGEMENT.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 LEAN SYSTEMS TOOLS AND PROCEDURES.
“Without the Cost of Waste …”
Synchronous Manufacturing and Theory of Constraints
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Just-in-Time (JIT) and Lean Systems Chapter 7. Management 326 Operations and Operations Strategy Designing an Operations System Managing an Operations.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
BUAD306 Lean Operations. A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Teamwork Presentation on JUST IN TIME” METHOD World Wide Science, Online MBA Program 25 June 2011 Head of Group: Head of Group: Ahmad Shikeb Farazi Ahmad.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Operations Management JIT & Lean Systems
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Lean Manufacturing Series
Lean operations and JIT
PROCESS APPROACH Nancy.
Inputs and Outputs to Aggregate Production Planning
Operations Management
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Just-In-Time and Lean Production
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

DEMAND FLOW TECHNOLOGY Tom R. North IEM 5303 Advanced Manufacturing Systems Design

Overview Toyota Production System Demand-Based Flow Manufacturing Kanbans Cellular Manufacturing Potential Drawbacks Future Areas of Research Concluding Remarks

Toyota Production System (1) President of Toyota challenged employees. Taiichi Ohno - vice president of engineering. TPS differentiated Toyota from their competitors: Reduced lot sizes which increased production flexibility. Parts were provided at the desired time and place for a specific task. Equipment layout was optimized based on the order that the product was built to minimize the travel between cells.

Toyota Production System (2) Fundamental basis: elimination of non-value-added work. Three Principles of the TPS. Operational flow of parts Just-In-Time (JIT) Autonomation Group technology Method for determining profit margins “Five Whys”

Toyota Production System (3) JIT - later process refers back to an earlier process. Autonomation - quality control checkpoints. Group technology - grouping of machines based on flow of production to minimize travel of the parts. Profit margin Americans - selling price = sum of actual cost to build the car and the profit. TPS - profit = difference between the selling price and actual cost. “five whys”.

Toyota Production System (4) Kanbans Control the JIT processing method Number of parts to transfer from point A to point B. Number of parts to pick up. Which parts to assemble. Kanbans prevent overproduction Which results in excessive inventories. In periods of low growth, can lead to layoffs.

Toyota Production System (5) Advantages Higher quality, lower inventory levels, minimized non- value-added activities, and lower prices for the customers. Goals Acceptable for machines to be idle because they only need to produce enough parts based on customer demand. Unacceptable for people to be idle. Disrupt flow of parts. Reduce the timeline from initial customer order to collecting the money.

Demand-Based Flow Manufacturing (1) TPS a.k.a. theory of constraints, synchronous manufacturing, demand flow technology, and supply chain management. Output is still the same, “mass customization”. TPS recognized as demand based flow manufacturing or demand flow technology (DFT). Focusing on the customer is the main purpose.

Demand-Based Flow Manufacturing (2) Pull System of Manufacturing Products are built and then companies look for buyers. Large lot runs to minimize on tooling set-up times. Results in long lead times to the customers. Push System of Manufacturing Products are built as needed. Materials flow in the same direction. Info opposite. Major difference: short-term scheduling and production control. Both long-term and midterm planning are essentially the same for both systems.

Demand-Based Flow Manufacturing (3) Advantages Focuses on flexibility and throughput to reduce total cycle time from initial customer order to delivery time. Reduces costs as a result of unbalanced production schedules (MPS). Tool set-up times are reduced, which yields a better flow and balance of material through the entire assembly process. Advanced ERP systems or any software for that matter are not required to implement/execute DFT.

Demand-Based Flow Manufacturing (4) Goals Improve revenue, growth of company, competition, and eventually increase the market share. Information and material must be high quality and flowing at a high velocity. Ultimate goal for DFT will be mixed-modeling.

Kanbans (1) DFT is the actual production method. Kanbans are used to manage the flow processes in DFT. Kanbans are pieces of paper that contain the required information to control the production, quantities to produce, and the sequencing that the products must go through to be built. There are different kinds of Kanbans.

Kanbans (2) Withdrawal Kanban. Production Kanban. Authorize movement of parts. Remain at work center until all parts are gone. Information on Kanban. Production Kanban. Authorize the release to a preceding process to build the specified number of parts listed on the Kanban.

Kanbans (3) Features & Advantages One feature is that they can be used repeatedly. The number of Kanbans used is restricted. By reducing the number of Kanbans, the flow of production is limited, which minimizes waste and inventory. Kanbans are simple, provide precise information, minimal cost for transferring information, minimizes waste, and prevents overproduction. Thus, all of this improves the quality of the product, which in turn improves the relationship between the customer and the company.

Cellular Manufacturing (1) Facilitates the flow of materials. Travel between work centers is reduced. Biggest area of non-value-adding costs = travel. Objective - group machines according to parts with similar features.

Cellular Manufacturing (2) Advantages By grouping machines based on similar part features, setup times are reduced due to similar tools and part sequencing. Reduced in-process inventories. Reduction in flow times as well as WIP. Improved product quality and reduced tool requirements. Common goal, shorter customer response time. Creates more of a conducive environment that results in teamwork. Teamwork is one of the fundamental goals of the original Toyota Production System.

Cellular Manufacturing (3) Cell design is a function that involves both system structure and operation. Structural issues are based on: Part families and the grouping of part families. Identifying the proper machines and group them accordingly. Identifying the right combination of tools, fixtures, and pallets. Identify the material handling equipment and layout of the equipment.

Cellular Manufacturing (4) Goals Final piece of the puzzle to insure success in implementing DFT. Number of factors to insure success: Reduced batch sizes, organized work stations, Kanbans and inventory control, group technology, preventative maintenance, and employees willing to take initiative. This whole method of DFT focuses on employee interaction and their involvement in the processes. Their input is extremely important for DFT to succeed.

Potential Drawbacks Negative aspects of DFT Geographical locations of the parts suppliers w.r.t. major corporation to minimize transportation costs and lead-times. Limited applications with smaller firms due to limited products. Not economical for suppliers on a daily basis. Cultural differences may affect the implementation of DFT. People for the most part are uncomfortable with change. Imitating DFT. The organization must have upper. management’s complete support to implement DFT in order for it to be a success.

Future Areas of Research Optimize between flexibility, quality, and cost. Compromises must be made to satisfy the customer requirements to their fullest. Look at the reliability of machine and cutting tools. This has implications in minimizing the number of setups due to tooling breakdowns. Artificial intelligence. The impact of this is to minimize the number of routine human errors that might be a result tedious tasks.

Concluding Remarks 100% centered on the elimination of wastes. Overproduction, delays, transporting, processing, inventory, and wasted motion. Build only what is needed, excess manpower can be utilized in other areas. This prevents excessive hiring during high demands and massive layoffs during low growth periods. Not the absolute cure-all for continuous flow. It took Toyota over 10 years to really justify switching to DFT. Even after that they are still trying to improve upon the system.