Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Amitava Mitra, Solution Architect, Oracle Primavera, TCS
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Optimize tomorrow today. TM Cost and Affordability approach at Development Planning stage 1.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
06/06/07 – 07/11/07 BIM Building Information Modeling.
BIM Management – A Strategic Approach
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100% How long did it take you.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Facilities and Construction: Did you know your GPO can help?
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
ESTIMATING By Laith Jacob.
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Project Management March 9, 2001 Dr. Richard Chung Dept. Chemical & Materials Engineering San Jose State University.
Development plan and quality plan for your Project
Integrated Design and Delivery Systems By Dr Zeeshan Aziz – licensed under the Creative Commons Attribution – Non-Commercial – Share Alike License
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
Introduction to BIM BIM Curriculum 01.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100% How long did it take you.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
ACTION PLAN LIN ASSISTANT ENGINEER KUNMING-CHINA.
Job Order Contracting A Washington State Procurement Option
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
Construction Project Management: Technology driven answers for schedule and budget savings.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Construction Contracts and Project Delivery Methods
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Identify steps for understanding and solving the
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
CR3683-L Integrating Autodesk® Quantity Takeoff and Timberline Estimating Kevin R. Miller Associate Professor, Brigham Young University Jason Dodds, Autodesk.
Kevin R. Miller BYU Construction Management. Estimating today When was the last time you estimate a set of plans that were 100%? How do you perform quantity.
Construction Eng 221 Project Management and Administration.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Model-based Estimating Olli Seppänen Professor of Practice Operations Management in Construction Department of Civil and Structural Engineering.
COA 8903 Strategies for IT Adoption in the Building Industry Amol Kane Construction Engg & Management Georgia Institute of Technology ELEVATORS.
Collaboration in Contracting Teresa Magnus Vulcan Insulation Co.
Transit Facility Development: Lessons Learned. Overview Vision Project Size & Scope Funding Approach Concept Design Project Delivery Validation Efforts.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Confidential Using Building Information Model Development of the role of the contractor Oslo September 16, 2010 Petter Eiken President Skanska Norway.
Copyright © The Conestoga Group PY 674 – Session 2 Review of week 1 material... Chapter 1: PM Overview – Main Text Book / H. Kerzner Ph. D. Focus.
IRC Research and Technology Forum B uilding I nformation M odeling by Bill Wiseman, P.E. Sr. V.P. Hixson Inc. Director of Operations.
BIM EXECUTION PLANNING PROCESS
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
EXTRA SLIDES.
ERP = Enterprise Resource Planning
Copyright Scott Bloss, All rights reserved.
Overview of Project Management
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
Quantities and Price.
Quantities and Price.
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Construction Contracts
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Overview of Project Management
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Construction Coordination BIM Curriculum 06

Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits

Problem Definition  Design  Sub Contractor Cost  Construction  Facility Management No direct cost feedback on design decisions Coordination of trades Missing / Incorrect Design Information Inability to reuse data for shop drawings Field rework required for prefabricated components Padding to compensate for risks Poor subcontractor work flow – “Starts and Stops” Inadequate quantity information for planning Lack of owner trust – difficulties in communicating cost and schedule issues Production control is based on subjective information Frequent starts and stops Estimating is time-consuming and occasionally inaccurate Insufficient as-built project documentation Renovation, addition and demolition planning is time- consuming

MoneyManpower MaterialsMachinery Objectives  Winning the bid  Fast design feedback loop  Fast & accurate estimates  Value engineering  Constructability analysis  Managing the 4 Ms  Money  Manpower  Machinery  Materials

Model Estimating Procurement Sequencing Site Management  Constructability Analysis  Drives Estimating  Provides Locations  Zone Planning  Design to Build /Build to Design  Schedule Analysis  Line of Balance  Integrated Monte Carlo  4D Simulation  Drives Procurement  Data Mining for Supplier Negotiations  Tracking of High Risk, Long Lead Items  Integrated with the Project Schedule  Drives Site Management Process  Short Lead Procurement  Site Planning for Materials & Equipment Locations  Fast & Accurate  Easy Updates - Linked  Drives Sequencing Construction Planning

rework Traditional Design Process

support for iterative design process New Design Process

Time (4D)Cost (5D) Linked Schedules Linked Estimating Recipes The Virtual Construction Model (5D) BIM Model (3D)

5D Work Flow

Level of Detail & Complexity Design Intent Model Construction Model Construction Modeling

Completed Column Recipe Recipes

Concrete Reinforcing Bars Formwork Cladding / Surface finish Recipe Methods Stages Required to Finish Column Methods

Recipe Methods Resources

RecipeMethods Resources Zones/Floors + = // The 5D Model

Benefits: Clash Detection  Conventional methods of coordination are extremely time consuming and error- prone.  Using internal or external clash detection software helps to identify the construction errors in the BIM model  Construction risks and costs can be reduced significantly

Benefits: Cost Variances  Early Design phases:  Which materials?  Price of materials?  Solution:  Calculate cost ranges instead of fixed prices Exterior Wall type? Cost of a double swing door?

Variance Estimating © Expected price range: $20 – $25

Benefits: Design to Build  Design follows construction methodology  Acceptable Tolerance  Coordination of Trades  Quality Check

Benefits: Build to Design  Measure points  Check Onsite  Guarantee Fit X, Y, Z

Virtual Construction™ Products Construction Modelers / Project Engineers Estimators Schedulers / PM’s / Supers