Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.

Slides:



Advertisements
Similar presentations
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Advertisements

Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
Harding Elementary School Exterior Repairs & Select Roofing Replacement 08/12/2014.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
January 6. January 7 January 8 January 9 January 10.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Futureview Solar Solutions Elysburg, Pa. Call
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
After the foundations have been completed the walls are set out and construction commences. wall structures.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
ELECTRIC KILNS – JANUARY 2015 SundayMondayTuesdayWednesdayThursdayFridaySaturday Small 123 Large Small Large Small Large Small.
The West London Free School Palingswick House Update.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
How to build a two storey house
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
Curtain Walling System Cladding System Insulation Panels.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
MSU/MCTC Law Enforcement and Criminal Justice Center March 10, 2010.
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Building for Learning Project Photo Progress Report Month of May 2010 Project commencement 21 st September 2009.
1 July 13, 2011 Some morning photos Tank Valve Box.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Work Progress Photos From 1 ST To 15 TH NOV 2015.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Chapter 7 : Construction 1. Adobe – a mixture of clay and straw used as a structural material in the Southwestern United States.
His Story Board Monthly Theme-Focused Activities Choose Truth
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Scheduled completion March.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
St Chad’s Catholic Primary School. January 2004 St Chad’s Catholic Primary School Phase Two new junior classrooms added.
Building for Learning Project Photo Progress Report September 2010 Project commencement 21 st September 2009.
Objective 6.02 part 2: Recognize components of construction
Construction Documents
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
Joint Classroom Steering Committee Report
Pine cove pit time lapse drone photos
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
Minuteman Vocational Technical Regional High School Progress
14 High Leys Drive, Ravenshead, NG15 9HQ
Carleton College Summer 2018 Science and Campus Construction Plan
A 6 mm cable with a length of 15 m has been installed
FINISHES (FLOOR, WALL & CEILING)
Name____________________________ Tutor Group _____
New White Lake Township Library
Minuteman Vocational Technical Regional High School Progress
Teacher name August phone: Enter text here.
PKL INVESTMENTS LTD Value of contract: Length of contract:
Rotary International Minute
2015 January February March April May June July August September
Presentation transcript:

Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009

Mid January – more minor demolition and framing

Fire services installed and stairway brickwork

Hooray - Admin completed!!!!!!

Former student work (maths and French) dating back to 1922 found in building cavities from demolition

1 st Storey wall frames going up

Ground floor ceiling struts and power box installed

1 st Storey Wall Framing – well underway

While the photos don’t show it – several days of +40c

Final part of old roof replaced with addition of new 1 st Storey roof – February 2010 Finally the last of the timber singles!!!

With the final part of the roof replaced, the last big cleanup of all the 100+ years of accumulated dust, possum poo, birds nests, etc from the classroom below

More scaffolding as the stairway and lift get built.

Sisalation being added, under black plastic is plaster boards ready for March construction.

Roof, spouts, drainage and sisalation February 2010

1 st Floor data, electrical, phone installation Solar panels on roof - February 2010

Plumbing, air conditioning February 2010 Kos installing ducting.