© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#77 Meeting Arrangement 16 - 20 Nov, 2015 Anaheim, CA, US Tuomo Säynäjäkangas.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1196r1 Submission Data Rate and Spectrum Requirements for IEEE aj (45 GHz) Date: Authors: Haiming Wang (SEU)Slide.
Advertisements

Way forward for LTE DL 4Rx AP SI on RF
Resource Allocation and Reuse in LTE. Mobile Communication 2 Markus Laner Seminar, SS Contents Introduction History of Resource Reuse Proposals.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#73 UE RF AH Meeting Arrangement Jan, 2015 Oulu, Finland Tuomo.
All you always wanted to know about 3GPP … but were too afraid to ask.
Submission doc.: IEEE /0019r0 March 2015 Steve Shellhammer, QualcommSlide 1 March 2015 Opening Report Date: Authors: Notice: This document.
Doc.: IEEE /0272r0 Submission February 2011 Ron Porat, Broadcom Outdoor Path Loss Models for ah Date: Authors: Slide 1.
3GPP TSG RAN WG 4 Meeting #1 Howard Benn Convenor Tdoc TSG R4#1(99)018.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#75 Meeting Arrangement May, 2015 Fukuoka, Japan Tuomo Säynäjäkangas.
Doc.: IEEE r1 Submission May Vertical Application TAG May 2015 Meeting Tim Godfrey, EPRISlide 1.
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#76 Meeting Arrangement Aug, 2015 Beijing, China Tuomo Säynäjäkangas.
Doc.: IEEE 802.RR-01/017-r1 Submission November 2001 Vic Hayes, Agere SystemsSlide 1 Opening report Radio Regulations to Radio Working Groups November.
WF on BS MMSE-IRC receiver
Doc.: IEEE /0251r0 Submission February 2011 Ron Porat, Broadcom Outdoor Channel Models for ah Date: Authors: Slide 1.
1 LTE standards Status for this work in 3GPP and what next for the Future Francois COURAU 3GPP TSG RAN Chairman.
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
[Qualcomm, Ericsson, Nokia Networks, Huawei,…]
Doc.: IEEE /0398r0 Submission March 2012 Slide 1 Date: Authors: CWPAN Response to IEEE China MM-Wave (CMMW) Study Group.
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
Questions about LAA deployment scenarios DocumentIEEE Submitted Source Roger B. Marks BaiCells capable.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 © 3GPP 2015 RP-15xxxx What Tuomo and his team achieved 1 3GPP TSG RAN Meeting #70 Sitges,
3GPP2 LTE Workshop SEOUL, Korea, 27 th– 28 th June GPP LTE Status Status Source Source 3GPP TSG RAN Chairman 3GPP TSG RAN Chairman ETSI TC MSG Chairman.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel NSN (ECSG Chair)
Doc.: IEEE /0024r0 Submission Feedback on 3GPP CRs: LAA Multi-Channel Access and Energy Detect (ED) Coexistence Slide 1 Date: Authors:
Doc.: IEEE /129r0 Submission May 2000 Vic Hayes, Lucent TechnologiesSlide 1 Report from the Regulatory ad-hoc meeting doc 00/124 Vic Hayes.
September 13, 2004Chair, IEEE Joint Opening September 2004 Interim Session #10 Jerry Upton- Chair Gang Wu – Procedural.
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Omniran ecsg 1 OmniRAN EC SG Agenda and Meeting Slides January 2014, Los Angeles, CA Max Riegel (ECSG Chair)
Submission doc.: IEEE /0156r0 January 2016 Joseph LEVY (InterDigital)Slide 1 IMT-2020 Discussion Review and Straw Polls Date: Authors:
Doc.: IEEE r0 Submission January Vertical Applications TAG January 2016 Meeting Atlanta, Texas, USA Tim Godfrey, EPRISlide 1.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#79 Meeting Arrangement May, 2016 Nanjing, China Xutao Zhou.
Meeting arrangement Two parallel sessions from Tuesday to Thursday
1210 MHz of harmonised spectrum (ECC framework)
WF on UL Transmission for Difficult Band Combinations in LTE-NR DC
Draft WF on single Tx switched UL
Single Tx switched UL DRAFT 3GPP RAN #77 September , 2017
WF on single switched TX UL
CWPAN Response to IEEE China MM-Wave (CMMW) Study Group
Initial workplan on NR spectrum
WF on single switched TX UL
September 2015 Opening Report
Single Tx switched UL Qualcomm, Intel DRAFT RP GPP RAN #77
WF on measurement capability and measurement gap for NR
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
RAN5#57 RF Group Timetable – v1
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
3GPP TSG RAN Meeting #67 Shanghai, China, 9 – 12 March, 2015
Nakamura, Takaharu / Fujitsu Issam Toufik/ MCC technical support
Nakamura, Takaharu / Fujitsu
Views for The LTE-Advanced Requirements
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
WF on UE mandatory channel bandwidth for NR bands
WF on scenarios and evaluation assumptions for flexible duplex
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
WF on LTE-NR DC with UL coexistence
3GPP RAN4#79AH Meeting Arrangement
EXECUTIVE SUMMARY CA combinations are divided into intra-band (contiguous and non-contiguous) and inter-band. Aggregated carriers can be adjacent or non-adjacent.
Scoping Out CA CA(Carrier Aggregation) is a technique used to combine multiple Long ‐ Term Evolution (LTE) component carriers (CCs) across the available.
Antennas Topologies Directly connecting two duplexers together can affect each other’s filter characteristic, thereby losing the isolation that is needed.
LTE-Advanced New UE Categories[4] LTE-Advanced New UE Categories[4]
Mobile Synchronization Trends 4G to 4.5G to 5G
Erik Guttman, Chairman of 3GPP TSG SA Samsung Electronics
5G Micro Cell Deployment in Coexistence with Fixed Service
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
WF on LTE-NR Coexistence
3GPP RAN1 and RAN4 status on NR-Unlicensed and LAA
Performance Evaluation of Channel Access Mechanisms in 6 GHz Spectrum
Presentation transcript:

© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009 SLIDE 0 3GPP RAN4#77 Meeting Arrangement Nov, 2015 Anaheim, CA, US Tuomo Säynäjäkangas RAN4 Chairman

SLIDE 1 Meeting arrangement Common session (Chairman) Mon morning and Fri afternoon (Pacific D) RF and frequency bands (Chairman) Mon - Fri (Pacific D) RRM and demodulation (VC Xizeng Dai) Mon – Fri (Avila) Narrow Band IoT (VC Hiromasa Umeda) Tue / Wed mornings (Catalina 7) Thu afternoon (Catalina 7) Voting for Chair election, Mon-Wed morning coffee breaks (Executive boardroom, 4th floor) Slide 1

SLIDE 2 Tdoc request guideline 3GU tool will be used for both Tdoc number request and submission Note the separate deadlines for Tdoc request and submission! Deadline for Tdoc number request is 10:59 pm UTC on Thu 5 Nov 2015 In case of problems secretary will allocate CR numbers and provide Tdoc list by 10:59 pm UTC on Fri 6 Nov 2015 Deadline for Tdoc submission is 10:59 pm UTC on Mon 9 Nov 2015 NOTE: The deadlines are hard deadlines Tdoc requests received after deadline will be considered as late Documents missing the submission limit will be considered as late Slide 2

SLIDE 3 Document handling guideline Documents missing Tdoc submission deadline 10:59 pm UTC on Mon, 9 Nov will be marked as late and won’t be treated Please pay attention to presentation time => brief summaries Chairmen will distribute meeting minutes daily Revisions / new tdoc numbers allocated only by the judgment of the chairmen During meeting the deadline for tdoc request is Thu, 19 Nov, end of the meeting session During meeting the deadline for tdoc submission is Fri, 20 Nov, 2:00 pm Note: Inbox will be closed at 2:00 pm Please pay attention when you use the reflector to circulate draft documents. If the attachment name matches the pattern ‘R4-14xxxx.zip’, it will be automatically uploaded to the 3gpp ftp server as an official document Only official Tdocs (with proper number) from the inbox/documents folder are formally discussed in the meeting Slide 3

SLIDE 4 Monday, 16 Nov, 2015 Slide 4 Venue Time Pacific DAvila 9:00-10:301. Opening of the meeting 2. Approval of the agenda (1) 3. Letters / reports from other groups / meetings (6) 7.14 LTE CAE beyond 5 carriers / general (9) Elevation BF, FD MIMO / general (9) 7.8 LTE 4DL RX / BS impact (4) 13. Any other business / new CA approach (1) 2.1 Elections / 1st round (Executive boardroom) 11:00-13:004. BS spec improvements (1) UTRA BS RF (core/conformance/EMC) (30) E-UTRA BS RF (core/conformance/EMC) (40) MSR BS RF (core/conformance/EMC) (26) E-UTRA UE RF CA (7) 5.1 UR RF (4) LTE D2D Proximity services / RRM (2) 7.4 IM for DL control channels for LTE (20) 7.5 CRS IM for LTE / UE demod&CSI (28) 14:00-16: UE CA requirements (13) Other requirements (8) Pcell mandatory support (3) 5.6 Other specs / Rel ind (1) 7.53 TEI-13 RF (4) 7.5 CRS IM for LTE / UE demod&CSI (continue) 7.6 MMSE-IRC for LTE BS (18) 16:30-18:3010. Liaison and output to other groups (13) LTE UE TRP &TRS General (2) LTE UE TRP &TRS Hand phantom (4) LTE UE TRP &TRS LEE (2) 7.3 LTE MIMO OTA intro (29) 7.6 MMSE-IRC for LTE BS (continue) 18:30-21:00 (ad-hoc) AAS (Chair: Richard Kybett) MMSE-IRC for LTE BS (Chair: Xizeng Dai) IM for DL control channels (Chair: Andrey Chervyakov)

SLIDE 5 Tuesday, 17 Nov, 2015 Slide 5 Venue Time Pacific DAvila 8:30-10:309.1 FS LTE 1980_2170 Korea (6) 8.1 / 2GHz LTE band for Region1 (9) 8.2 AWS Ext band for LTE (20) 8.3 LTE 700 MHz for Arab region (6) 8.4 TD-LTE 1400 MHz band for China (20) 2.1 Elections / possible 2nd round (Executive boardroom) LTE 4DL RX general (6) LTE DL 4RX / RRM (4) LTE DL 4RX / Demod (4) LTE DL 4RX / Demod of PDSCH (26) 11:00-13: LTE Intra Band C CA in Band 5 (5) 7.16 LTE Intra Band C CA in Band 8 (2) 7.17 LTE Intra Band C CA in Band 42, 4DL (2) 7.19 LTE Intra Band NC CA in Band 5 (5) 7.20 LTE Intra Band NC CA in Band 7 (4) 7.21 LTE Intra Band NC CA in Band 41, 4DL (4) 7.22 LTE Intra Band NC CA in Band 42, 4DL (1) 7.23 Inter Band Carrier Aggregation / Big CRs (8) 7.26 Inter Band CA: Class A3 (2) 7.29 LTE CA 700EU+B20 (2) 9.2 FS on LTE CA B20+B28 (2) LTE DL 4RX / Demod of control channels (16) LTE DL 4RX / CSI (10) 14:00-16: LAA to unlicensed spectrum / general (14) LAA to unlicensed spectrum / UE RF (8) LAA to unlicensed spectrum / BS RF (14) LAA to unlicensed spectrum / other (2) 7.10 LTE-WLAN interworking (7) LTE D2D enhancements / RRM (20) 16:30-18: LAA to unlicensed spectrum / co-ex testing (6) 7.30 LTE 2UL inter-band CA / Big CRs (3) 7.36 LTE 3DL/2UL inter-band CA (8) 7.37 LTE 3DL/2UL mixed intra/inter-band CA (7) LAA to unlicensed spectrum / RRM (37) 18:30-20:30 (ad-hoc) LTE MIMO OTA (Chair: Anatoliy Ioffe, Pacific D) BS spec improvement (Chair: Aurelian Bria, Catalina 7) LAA RRM (Chair: Steven Chen) * A separate parallel session for NB-IOT will be held at Room Catalina 7 (Chair: Hiromasa Umeda) 8:30 – 13:00, see slide 9

SLIDE 6 Wednesday, 18 Nov, 2015 Slide 6 Venue Time Pacific DAvila 8:30-10:307.2 Active Antenna Array System (4) TS text (15) OTA requirements OTA sensitivity (8) EIRP accuracy (6) 7.12 MC load distribution for LTE / RRM (16) Dual connectivity Enh for LTE / RRM (20) 11:00-13: Conducted requirements (16) AAS performance requirements / demod (5) Manufacturer’s declarations (7) Conformance requirements (24) 2.1 Elections / possible 3rd round (Executive boardroom) Dual connectivity Enh for LTE / RRM (continue) LTE CAE beyond 5 carriers / demod (1) LTE CAE beyond 5 carriers / RRM (2) FE LTE MTC UE RRM (28) 14:00-16: LTE 3DL/3UL CA of B (4) 7.39 LTE 3DL/3UL CA of B (1) HSPA 2UL / UE RF (1) LTE 3-Band CA General / Big CRs (9) Inter-band 2DL combinations (3) Inter-band 3DL combinations (11) LTE 4-Band CA general / Big CR (8) LTE 4-Band CA 4DL combinations (10) FE LTE MTC UE RRM (continue) 9.5 High speed scenario (49) 16:30-18: LTE TDD-FDD CA 2DL inter (10) LTE TDD-FDD CA 3DL combinations (10) LTE TDD-FDD CA 4DL combinations (4) 7.44 LTE 5-Band CA combinations (12) 7.45 WF on MSD calculation for CA (15) 9.5 High speed scenario (continue) 18:30-20:30 (ad-hoc) LAA RF (Chair: Chris Callender) UE ant isolation (Chair: Gene Fong) High speed scenario (Chair: Xizeng Dai) A separate parallel session for NB-IOT will be held at Room Catalina 7 (Chair: Hiromasa Umeda) 8:30 – 13:00, see slide 9 LTE MIMO OTA at Room Catalina 7 (Chair: Anatoliy Ioffe, room available 1 pm onwards)

SLIDE 7 Thursday, 19 Nov, 2015 Slide 7 Venue Time Pacific DAvila 8:30-10: Band 41 UE power class supporting +26 dBm (5) B41 HPUE impacts on other bands (2) B41 HPUE impacts on RF reqs (3) FS on LTE AWS-3/4 band plan (3) FE LTE MTC UE RF (15) 9.6 Measurement gap enhancement (9) RAN enh for ext DRX in LTE / RRM (10) Power saving enh for UMTS / RRM (3) Indoor Positioning for UTRA&LTE / general (1) Indoor Positioning for UTRA&LTE / RRM (15) Indoor Positioning for UTRA&LTE / (3) DL TPC enh for UMTS / UE demod (3) HSPA 2UL / RRM, demod (1) 11:00-13: FE LTE MTC UE RF (continue) FE LTE MTC BS RF (1) 7.8 LTE 4DL RX / BS impact (4) LTE 4DL RX UE RF (12) LTE 3DL/3UL CA of B / RRM (2) LTE 3DL/3UL CA of B / RRM (2) LTE 4-Band CA general / RRM (9) LTE 5-Band CA general / RRM (2) / 2GHz LTE band for Region1 / RRM (3) AWS Ext band for LTE / RRM (3) TD-LTE 1400 MHz band for China / RRM (1) 14:00-16: LTE D2D enhancements / General (1) LTE D2D enhancements / UE RF (10) Indoor Positioning for UTRA&LTE (1) DC-HSUPA for UTRAN CS (3) 7.3 LTE MIMO OTA agreements (after AH) Elevation BF, FD MIMO / demod (5) 7.54 TEI-13 RRM / demod (1) E-UTRA Essential Correction / RRM (16) E-UTRA / UE demod (5) 16:30-18: LAA to unlicensed spectrum (after AH) 11. Revision of the work plan (14) RF, 2nd Round 5.3 Rel-12 corrections and TEI / RRM (38) 5.4 Rel-12 corrections and TEI / UE demod (22) 18:30-20:30 (ad-hoc) 4RX RF (Chair: Christian Bergljung) 4RX RRM / demod (Chair: Chris Callender) * A separate parallel session for NB-IOT will be held at Iris Room Catalina 7 (Chair: Hiromasa Umeda) 14:00 – 18:30, see slide 9

SLIDE 8 Friday, 20 Nov, 2015 Slide 8 Venue Time Pacific DAvila 8:30- 10:30 RF, 2nd Round RRM / demod, 2 nd round 11:00- 13:00 RF, 2nd Round RRM / demod, 2 nd round 14:00- 15:30 RF, 3rd Round RRM / demod, 3 rd round 15:30- 17: Liaison and output to other groups (13) 11. Revision of the work plan (37) 12. Future meetings (0) 13. Any other business (1) 14. Close of the meeting

SLIDE 9 NB-IOT parallel session Room Catalina 7 (17-19 Nov, 2015) Slide 9 Venue Time Tuesday, 17 Nov Wednesday, 18 Nov Thursday, 19 Nov 8:30- 10: General (1) Documentation (1) Power boosting IB&GB operation (7) Co-existence studies (15) NB-IOT, 2 nd round 14:00-16:00 NB-IOT, 3 rd round 11:00- 13: Co-existence studies (continue) UE RF (4) BS RF (3) RRM (6) NB-IOT, 2 nd round 16:30-18:30 NB-IOT, 3 rd round