Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

BeginningNext SlideBack End Program AVADAL 1 of 18 SK-16 Main Pumps 4 Pumps Per Strand – Normally 2 running and 2 on standby as back-up. Motor is 60 HP.
Star kW NEW. Star kW Star kW Instantaneous wall-hung gas boilers Conventional flue Sealed room fan assisted NIKE Star 23 kW EOLO Star 23 kW.
Customer Service – International dept. STAR 24 3 E.
Setup/Installation/Operation of an Environmental Control Unit (ECU)
HYDRAULICS & PNEUMATICS
INDUSTRIAL TRAINING BHEL –EDN BANGLORE SARATH T.S M110278EE.
HYDROPROCESSING PROJECT ARU / SWS – CONTROL SYSTEM and ESD
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Control Diagrams.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Mechanical AST5300 is a wet / wet differential pressure transmitter Compatible with liquids or gases on both the high pressure and low pressure process.
Sunday, May 17, 2015 Pressure Booster Service. Sunday, May 17, 2015 Booster Service Basics Control Panel Components Setting a pressure switch Setting.
AccuMax Single Point Injection Operation (See Installation and Operation Manual for detailed instructions)
EUT 1040 Lecture 10: Programmable Logic Controllers.
Turbine Protection and Control System
Introduction To Programmable Logic Controllers
2001, 2002 & 3012 Series Operation 2001, 2002 & 3012 Series Operation (See Installation and Operation Manual for detailed instructions)
One solution, many application Integrated Electronic Solution PowerSupply Flex.
AccuMax Multi-Point Injection Mechanics
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
Pump Application Interface. 30 October 2006 Overview Increases the functionality of the soft starter for pumping applications - four additional trip inputs.
COMPRESSOR BASICS.
PLC: Programmable Logical Controller
-P&ID- Piping & Instrument Diagram
Overview of the 1.
The MICE vacuum system Presented by Mark Tucker at CM-39, 26 June 2014.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
PLC: Programmable Logical Controller
To prevent cavitation:
Programmable Logic Controller (PLC)
Electrical Distribution Training
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
TECHNICAL TRAINING INVERTER-Y
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
PLC PROGRAMMING.
Prepared by: Engr. Qurban Ali Memon 11ES (SEC- 1 & 2)
CUE – Make Any Pump an E-Pump
Hydro Multi-B – (2) or (3) CME Pumps in Parallel
Service Section Technical Training December 2005.
World Leaders in Combustion Management Solutions End User Guide Lockout Codes Pressure Sensors Error Codes Flame Safeguard UV.
LCD Wiring Diagram Presentation B / B.
PROGRAMMABLE LOGIC CONTROLLER
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Employment of scada system in water purification and transmission system.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Proportional and Servo Valves
Presentation On Project Work Automatic bottle filling system using PLC
Seminar on "PLC” (Programmable Logic Controller)
Fluid Power Control.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
18 MW TURBINE CONTROL PANEL
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
INTRODUCTION TO PLC.
HIGH PERFORMANCE PRESSURE SYSTEMS.
Introduction to process control
Session III Architecture of PLC
ME444 ENGINEERING PIPING SYSTEM DESIGN
ENG421 (3c) – Pipes, Valves, Pumps
Introduction to process control
Charge 2. Equipment Protection 3. Definition and Documentation
RF Local Protection System
Ola Ingemansson Electrical & Instrumentation Engineer
Presentation transcript:

Why HIPPS ?? We have 600# (high pressure bearing) pipeline from well pads till production header. After that, we have 150# (low pressure bearing) pipeline due to economy & usage purpose. Due to some abnormality, if high pressure reaches 150# pipeline, then it may cause explosion to pipeline & hence vessels in trains area.

High pressure Bearing PipelineLow pressure Bearing Pipeline FLOW 107 psi Onsite Normal Operation (Without HIPPS):

High pressure Bearing PipelineLow pressure Bearing Pipeline FLOW 136 psi If Pressure Increases High Pressure

WHAT IS HIPPS??? HIGH INTEGRITY PRESSURE PROTECTION SYSTEM

HIGH INTEGRITY  Using 3 transmitters in downstream (works on 2oo3 logic).

PRESSURE PROTECTION  Safety Integrity Level – 3  High pressure from formation  Back pressure from trains  Pipe rating ( 600# to 150# )

Functional Safety of Electrical/Electronic/Programmable Electronic Safety-related Systems IEC 61508IEC and IEC standards for design, implementation and management of safety systems.IEC SIL (Safety Integrity Level ) - is a measurement of performance required. SIL 3 In accordance with IEC61508 and IEC61511 Low demand PFD-Frequency of demand of operation is < 1 per year STANDARD- International Electro Technical Commission (IEC)

1 LOGIC SOLVER 107 PSI Onsite Normal Operation (With HIPPS):

LOGIC SOLVER PSI If pressure increases:

1 LOGIC SOLVER 136 PSI

LIST OF INSTRUMENTS

TRANSMITTERS  PSIT-2011 & 2021 for Upstream  PSIT-2010 A/B/C & 2020 A/B/C for Downstream  PSIT-201 & 202 for Lube Oil (All PSIT’s are of ROSEMOUNT and Model of series 3051S)

PSIT-201 & 202  Set Point – 1800 to 2700 psi  Purpose  To start/stop the pump

PSIT SPEIFICATIONS TypeDiaphragm Seal type Maximum Temperature80ºC Minimum Temperature-40ºC Diaphragm MaterialHasteloy C 276 Fill Fluid MaterialSilicon Output Signal Type4-20mA Digital Communication stdHART Trip SP135psi

Specifications TypeBall Valve (Make- Valve Technologies) Size30” Opening time Upto 30 minutes Closing timeUpto 5 seconds Design Pressure91.7 bar Design Temperature130ºC Failure ActionFail to close Hydraulic Oil usedISOVG46 XSV

TRIPS FOR HIPPS VALVES: 1. Downstream pressure of HIPPS: 2oo3 logic. 2. When the pressure of air purge to HIPPS panel falls below 0.15 mm of water column (gauge available in field). 3. Position feedback of the HIPPS valve (any one) not available when valves are in OPEN condition: After a time delay of 40 min, both the HIPPS valves will close.

START-UP CONDITIONS 1.Pressure difference between upstream & downstream PSIT must not exceed 2.5 bar. 2.Upstream pressure should not exceed 100psi.

LOGIC OF 2oo3

BASIC LADDER LOGIC OF 2oo3

HYDRAULIC DIAGRAM

MOTOR DETAILS MakeCrompton Greaves Voltage415v +/- 6% Type3ɸ AC Squirrel Cage Induction Motor Full Load Current3.25 A Full Load Speed1415 RPM

1300 PSI PRESSURE IS SUFFICIENT FOR KEEPING THE VALVE IN OPEN POSITION. Pump stops at 2700 PSI. If the circuit hydraulic pressure is < 1800 PSI - ONE AMONG THE TWO PUMPS WILL START. < 1400 PSI THEN BOTH THE RUNS WILL START AUTOMATICALLY. CONTINUE:

PLC AIDIDO PSIT-2011/2021Limit switch of XSVXSY 2010 A1-1/2, XSY 2010 B1-1/2, XSY 2010 A1-1/ 2, XSY B2- 1/2 PSIT-2010 A/B/C(ZSO/ZSC- 2010A/2010B)XSY 2020 A1-1/2, XSY 2020 B1-1/2, XSY 2020 A1-1/ 2, XSY B2- 1/2 PSIT-2020 A/B/C(ZSO/ZSC-2020A/2020B)Trip lamp, Fault lamp PSIT-201/202Trip RESET, Fault RESET We have S7 400 PLC for HIPPS package & S7 200 PLC for hydraulic circuit. We are using two PLC’s. One for each stream for production redundancy. PLC I/O’s

Specifications of S7 400 PLC: 1. Modular PLC. 2. Handle large module. 3. Used where high processing speed & deterministic response time is required. 4. Used for data intensive tasks (data parallelism). 5. Have additional line monitoring diagnostic feature- generates alarm when wire breaks or short circuit.

Specifications of S7 200 PLC: 1. Shoebox PLC 2. Less Memory. 3. Handle small module 4. Cost effective.

ARCHITECTURE

PLC PURGING SYSTEM DETAILS MakePepperl + Fuchs Model3003-LPS-C1-YZ-VM SupplyInstrument Air Overpressure ProtectionBreather Range bar Temp. Range-29 to 50°C PurposeTo remove & prevent flammable gas or vapor accumulation. Note: Before opening the HIPPS panel, the purge pressure low trip logic should be BYPASSED by making the trip BYPASS switch “ON”. (switch available near HIPPS panel).

Cause & Effect

THANK YOU