Pipeline Profile 36 Inch Natural Gas Pipeline Line 401 Installed in 1993 Wall thickness.372 inch API 5LX-70 DSAW Coating-Fusion Bonded Epoxy Hydro tested.

Slides:



Advertisements
Similar presentations
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Advertisements

Avenida La Pata/Avenida Vista Hermosa Community Park PRESENTATION TO CITY COUNCIL and PARKS AND RECREATION COMMISSION December 15, 2004.
Avenida La Pata/Avenida Vista Hermosa Park and Development Study Land Use Charette MAY 15, 2004.
PRESENTATION January 8, 2004 ORANGE BOWL STADIUM.
Recreation Task Force Harlingen 100 September, 2009.
City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
Alpha Borough Project Presented by Beta Solutions Dave Woodruff Crystalann Harbold Todd Baldwin Katie O’Connor Adam Brown.
Community Soccer Fields Parks and Recreation Division December 3, 2013.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PHMSA Perspectives Construction Process & Standards
Benefits of Precast Concrete Sound Walls over Alternative Products Case Study June 4, 2010.
1 Land use planning and policies in the Netherlands March 8 th 2006, Carla Speel.
Presented by Doug Gapp Pipeline Safety Planning Dept Southwest Gas Corporation August 19, 2014 Western Region Gas Conference.
Alpha Borough Community Recreation Project Preliminary Design Presented by Group 3 February 28, 2002 From left to right: Pamela Vislocky, Erin O’Brien,
Board of County Commissioners 9/27/2011.  Minor Amendment to Existing Special Use Permit for Oak Hall Private School to modify conditions relating to.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
West Palm Beach, Florida CONFIDENTIAL MATERIALS NOT FOR DISTRIBUTION.
1 PG&E Pipeline Safety Enhancement Program San Mateo County Jim Cogan Government Relations.
The Draft London Safety Plan Finance & Support Services Overview and Scrutiny Committee 10 January 2005.
Recreation Task Force Harlingen 100 July Goal Harlingen will provide first class recreational facilities for its youth and will attract regional,
Making Connections School District Joint Use Cathie Olsky, Ed.D. Deputy Superintendent Deputy Superintendent May 26, 2011.
Western Carolina University Town Hall Meeting May 6, 2003 Chuck Wooten Vice Chancellor for Administration and Finance.
Lincoln Park Community Listening Session Number 2 Monday December 2 nd, 2013.
Neighbourhood Plan Upper Beeding Parish is 7.25 square miles (4637 acres) in size. The main settlements are Upper Beeding, Small Dole and Edburton. Only.
The Forbidden City Off-limits to the general public for more than 500 years, the Forbidden City, called Gu Gong in Chinese, is a collection of ancient.
Existing Joint Use Agreements Agenda Item: 6A. Existing Agreements Currently three (3) Agreements between City and TCUSD: Agreement for Use of Facilities.
Updates to Title 8. Anticipated Timeline… July - December 2013 Ideas Compiled Research and Drafting January 2014 Planning Commission Worksession Review.
Shady Acres Dallas Township Zoning. The Concept The following project will be displayed as a proposed development in the Dallas Township. It will be composed.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Overview of Integrity Verification Process (IVP) Workshop Held.
SLC Parks & Public Lands Athletic Field Reservations and Fee Changes January 9 th, 2013.
The Johnstown Flood of 1889 Zach Hummer History 100 Tuesday & Thursday, 11 am December 10, 2009.
Guelph Soccer Centennial Community Athletics Centre Excitement is Building.
Construction Report August 18, Projects Site Improvements Track replacement and turf Generators.
Open Space within WRAPS Study Area Existing conditions compared to County staff proposal Open SpaceExistingPotentialChange County Park30,500 SF Source:
SITE. ZOM CPA ZOM R-1B R-1A PD A A.
SPRING ARBOR TOWNSHIP. 36 SQUARE MILES BOUNDARIES – SOUTH PARMA ROAD TO THE WEST – SEARS ROAD TO THE SOUTH – ARBOR HILLS ROAD TO THE EAST – WESTERN SCHOOLS.
Who is INGAA? INGAA represents the majority of the interstate natural gas transmission pipeline companies operating in the U.S., as well as comparable.
NNSA Service Center Albuquerque, NM Field Office Status Report June 2008.
Ufa State Petroleum Technological University. Ufa State Petroleum Technological University - is a technological university in the city of Ufa. In October.
Need Information or Assistance? Where to go, what’s available and what’s not.
SCC Management 16” Camas to Eugene 26” Sumas to Washougal.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Washington Monroe Investing in our future; delivering on our promises Objective Purchase property for future park, sports field and community center Benefits.
Hopkinton Community Preservation Commission & “The EMC House Project” John H Coolidge, Chairman Hopkinton CPC.
By: Mike Capasso. Recreation Center We have decided that the construction of a recreation center, based on the meeting’s results, would be a good idea.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
CITY OF STOCKTON PLANNING COMMISSION AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: AGENDA ITEM: DATE: PROJECT: APPLICANT: PRESENTOR: E-2IS22-06, DA2-06,
Neighborhood Action Team Quarterly Update August 10, 2004.
CHAPEL HILL PARKS & RECREATION Comprehensive Parks Plan Chapel Hill Greenways Master Plan.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
Park Planning for the City of San Diego Robin Shifflet April 22, 2016 City of San Diego Planning Department.
1958  Construction began on a new fire hall, adjacent to property known as Fireman’s Park.  The City entered into a contract to construct a firehouse.
Preparing for the future. With Infrastructure.
High School Capacity Committee
Lane Center for Academic Health Sciences – Now Open
Robinson Park Recreation Center Renovation
PG&E “Waiver” at proposed Tracy Sports Park Bob Howard 11/16/07
Large scale development groundwater balance
Salk Neighborhood Park & Joint Use Development
Why this project should NOT be built in Golden Gate Park And
Concept Plan for Proposed Park Near Hopewell School
CIP Amendment – Property Acquisition
Butte County Board of Supervisors November 8, 2016
CIP Amendment – Property Acquisition
Request by Councilmember Madison to reagendize the Desiderio Park Design for reconsideration September 17, 2018 Item 17.
Budget Overview: Parks and Community Services
Community Park Proposal
Presentation transcript:

Pipeline Profile 36 Inch Natural Gas Pipeline Line 401 Installed in 1993 Wall thickness.372 inch API 5LX-70 DSAW Coating-Fusion Bonded Epoxy Hydro tested to 1302 PSIG in 1993 MAOP 1040 psig, 71.89% SYMS Pigged in miles Two of the 15 largest anomalies on Sports Park Unconfirmed Wall loss from 20 to 24%

Pipeline Profile 24 Inch Natural Gas Line Pipeline constructed in 1972 Pipeline Thickness.322 inch API 5LX-60 DSAW Coating- Double Wrapped Tape Hydro Tested to 1486 psig in 1972 MAOP 890 psig SMYS Qualified by Hydro for class 3

Pipeline Profile Chevron 18 Inch Petroleum Pipe No Information available

Proposed Uses of Property 1997 Northern California Processing Center House illegal immigrants 500 Beds and associated Support Services Project died when influential Congressman who owned 800 acres near site opposed the project. Congressman initiated transfer of the property to the City for educational or recreational purposes.

Proposed Use July 2000 Tracy Leaning Center 350,000 Square Feet of Building Space 5,232 Students at Build out Project killed by Tracy Planning Commission in 2001 because pipelines posed to great a Danger. Planning commission chairman is the fire chief for LLNL and he spearheaded effort to dump Project

Tracy Youth Sport Complex Project to Include Soccer Fields 15 Baseball Fields 23 Football Stadium 1 Football Fields 4 Restrooms Snack Bars

2004 Class Location Waiver First Waiver Considered by CPUC Approved on December 16, 2004 Public Comment Period Waived Appealed by Local Residents Waiver revoked by Settlement Agreement Utility will replace pipeline within 2 years 24 inch Line qualified by Hydro Test 1972