1 Postal Operations John Rapp Senior Vice President, Operations.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Continuous Value Enhancement Process
© 2011 Chevron Copyright People, Process and Technology Making IT a strategic capability Randy Krotowski CIO, Global Upstream Chevron Corporation.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
What made Yahoo Successful? What was their strategy?
Improving Your Business Results Six Sigma Qualtec Six Sigma Qualtec Six Sigma Qualtec – All Rights Reserved June 26, 2002 BEYOND SIX SIGMA: A HOLISTIC.
Transportation and Warehouse Planning Systems Byron Flores Bus M. 462 April 12, 2010.
Virtualizing Enterprises: Challenges Harrick M. Vin Vice President and Chief Scientist Tata Research Development and Design Centre, Tata Consultancy Services.
1 CISR-consultancy Challenges “Customer ask us what to do next” Keywords: “Customer ask us what to do next” From Policy to Practise The world is going.
Mailer’s Technical Advisory Committee (MTAC) Task Team 2 General Session Presentation November 16, 2010.
Progress with the Postal Act of 2006 November 18, 2009.
Business Driven Enterprise Architecture Assessment Methodology Josh Arceneaux August 16, 2011.
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Business Plug-In B2 Business Process.
Visibility Strategy September, Visibility Today CONFIRM provides piece level mail processing data that can be used for tracking for letters and.
Charting a course PROCESS.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Competency Models Impact on Talent Management
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Complete and Integrated Lifecycle Management. Challenges 1.
Network and Operational Planning
Delivering Business Value WebDirector. Personal Productivity Disconnected Business Processes Disconnected Information Disconnected People Forms LOB.
QAD's Customer Engagement Dan Blake Consultancy Development Director, QAD QAD Explore 2012.
IT Process Organization (Provided by Booz-Allen & Hamilton)
Product Update – Returns eVS User Group November 10, 2011 Dan Barrett Manager, New Business & Returns.
Status of NDC Activations MTAC Briefing August 12, 2009.
November 01, 2005 MTAC 93 Design & Concept Testing Workgroup Status.
Linda A. Kingsley Senior Vice President, Strategy and Transition United States Postal Service EMA Foundation November 2007 How the 21 st Century United.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
© 2013 Cisco and/or its affiliates. All rights reserved. This document is Cisco Confidential. For Channel Partners only. Do not distribute. C
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER 13: Operation Analysis.
Corporate Automation Plan PHASE 2 February 4, 2004Washington D.C.
Project 2003 Presentation Ben Howard 15 th July 2003.
ITIL Overview 1 Configuration Management Working Group February 8, 2011.
® Customer Supplier Agreements Presented by Pritha Mehra Vice President, Business Mail Entry Friday, October 17, 2008.
Chapter 14 Global Production, Outsourcing and Logistics 1.
Optimizing a Nation-Wide Donor Center Network BackgroundBackground The client is a global provider of biological products and enabling technologies, which.
Project Portfolio Management Business Priorities Presentation.
Chapter 3 Strategic Information Systems Planning.
FHWA Office of Freight Management Freight Technology Assessment Tool.
® Flats Symposium 2008 Bill Galligan Senior Vice President, Operations USPS National Postal Forum ® National Postal Forum 2008.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
1 Intelligent Mail – Importance and Vision February 5, 2003 MTAC Briefing Charles Bravo, Sr. V.P. Intelligent Mail and Address Quality (IMAQ) Gary Reblin,
® Service Standards and Performance Measurement MTAC Workgroup 114 Status Report.
MTAC Workgroup 102 Update Advance Notification, Streamlined Acceptance & Visibility for First-Class Mail January 2008.
® Flats Symposium 2008 National Postal Forum ® National Postal Forum 2008.
Intelligent Supply Chain Management Strategic Supply Chain Management
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
1 Product Redesign MTAC Update November 5, Steering Committee Will Continue To Meet –Regular Updates And Feedback Regarding USPS Activity on Key.
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
1 MTAC May 26, 2011 Washington D.C. Kelly Sigmon Vice-President, Engineering USPS Operations Plan for Flats & Technology Update.
Information Technology Assessment Findings Presented to the colleges of the State Center Community College District.
Connecting executives to meet America’s challenges January 2012 INFORMATIONAL BRIEFING Leading EDGE Program Overview.
Talent Acquisition, Staffing, Recruitment, Executive Search.
Shared Services Initiative Summary of Findings and Next Steps.
Sample Fit-Gap Kick-off
Contents Playbook Objectives Playbook Value Details Playbook Design
John Deere Supply Chain Risk Management
Organizing and Analyzing Logistics Systems
CIM Modeling for E&U - (Short Version)
Identify the Risk of Not Doing BA
LOGISTICS NETWORK.
Lifecycle Services for Advanced Wireless LAN (LCSAWLAN) practice-questions.html.
Microsoft SAM Managed Service Program
ENTERPRISE BUSINESS SYSTEMS
Enterprise Program Management Office
Microsoft SAM Managed Service Program
Presentation transcript:

1 Postal Operations John Rapp Senior Vice President, Operations

2 Fall Mailing Season

3 Excellent

4 Area Mail Processing (AMP) Studies Ongoing No Decisions Made Included in Network Redesign

Network Integration and Alignment February 2002

6 Vision: Create a flexible logistics network that reduces total costs, increases overall operational effectiveness, and enhances differentiation through superior customer services Objectives: Reduce combined (USPS & customers’) costs Eliminate service failures and inefficiencies Maximize surface transportation cube utilization Three Tiers: Node Optimization (NIA) Event Management Route Plans & Schedules Routing Decision Rules Dispatch & Routing Execution (SAMS) Track & Trace Visibility (SASS) Strategic Tactical Operational In Conjunction with NIA Tier 1 Tier 2 Tier 3 Network Integration and Alignment (NIA)

7 Node Optimization (NIA) Event Management Route Plans & Schedules Routing Decision Rules Dispatch & Routing Execution (SAMS) Track & Trace Visibility (SASS) Strategic Tactical Operational In Conjunction with NIA Tier 1 Tier 2 Tier 3 Network Integration and Alignment (NIA)

8 NIA Addresses Several Challenges Fixed infrastructure inhibits Our Ability to Adapt to Changing Business Requirements Disproportionate Increase in Transportation Costs over Last Decade Evolution of the Distribution Network Resulted in Non-Standard Operating Procedures Differing & Inconsistent Preparation and Entry Exist Between Classes & Subclasses of Mail Differing & Inconsistent Service Standards Exist Lack of an Integrated IT Solution

9 Existing Service Standards Cannot be Compromised Network Designed to Lower Total System Cost (USPS and Customers) Cost Savings Are Trackable, Measurable, and Capturable Labor Impacts Addressed Proactively An Integrated IT Solution is Critical to Our Success Logistics Network Capable of Rapid Response to Changes in Customers’ Requirements Assumptions

10 Overall Approach for NIA 1. Establish Baseline 2. Define/Analyze Alternatives 3. Develop Implementation Plan Change Management: Develop new long-term processes, establish skills and requirements. Select Modeling Tool/Model Baseline Logistics Network Develop and Select Scenarios/ Alternatives Identify Resource Requirements for Projects STEP 1 STEP 7 STEP 6 Analyze Network & Deployment Alternatives / Scenarios STEP 9 Refine Logistics Network Strategy STEP 12 Develop Phase II Implementation Plan STEP 13 Gain Mgmt Approval for NIA Opportunity Assessment STEP 0 Data Collection & Document As-Is STEP 5 Develop Business Case STEP 11 Validate Network Concept STEP 10 Mobilize Team and Project Start-Up STEP 2 Design Conceptual Model STEP 4 Confirm Business Strategy STEP 3 Develop Model STEP 8    Mailers’ input

11 Centralization CentralizationDecentralization One facility Hundreds of facilities (today) Fewer plants Transportation Hubs Consolidation Centers Outsourcing (Considered after the model produces results) OutsourcingNo Outsourcing Everything is outsourced No outsourcing Shared Transportation Outsource labor in a USPS plant Outsource functions to customer’s plants Business Requirements ChangeDon’t Change Completely redefine mail classes and other services No changes Alter service standards to improve service performance Additional Dropship Sell processing or transportation services Differentiation Differentiate by Shape Don’t Differentiate by Shape Separate Facility for each shape All shapes in same facility Letters and Flats in one type of plant Parcels & Outsides in another Differentiate by Mail Class Don’t Differentiate by Mail Class Separate Facility for each mail class All mail classes in the same facility Separate facilities for Preferred and Standard mail Separate facilities for Expedited, FCM, and Standard Examples of Scenarios to Be Analyzed

12 Centralization CentralizationDecentralization One facility Hundreds of facilities (today) Fewer plants Transportation Hubs Consolidation Centers Outsourcing (Considered after the model produces results) OutsourcingNo Outsourcing Everything is outsourced No outsourcing Shared Transportation Outsource labor in a USPS plant Outsource functions to customer’s plants Business Requirements ChangeDon’t Change Completely redefine mail classes and other services No changes Alter service standards to improve service performance Additional Dropship Sell processing or transportation services Differentiation Differentiate by Shape Don’t Differentiate by Shape Separate Facility for each shape All shapes in same facility Letters and Flats in one type of plant Parcels & Outsides in another Differentiate by Mail Class Don’t Differentiate by Mail Class Separate Facility for each mail class All mail classes in the same facility Separate facilities for Preferred and Standard mail Separate facilities for Expedited, FCM, and Standard Examples of Scenarios to Be Analyzed

13 Centralization CentralizationDecentralization One facility Hundreds of facilities (today) Fewer plants Transportation Hubs Consolidation Centers Outsourcing (Considered after the model produces results) OutsourcingNo Outsourcing Everything is outsourced No outsourcing Shared Transportation Outsource labor in a USPS plant Outsource functions to customer’s plants Business Requirements ChangeDon’t Change Completely redefine mail classes and other services No changes Alter service standards to improve service performance Additional Dropship Sell processing or transportation services Differentiation Differentiate by Shape Don’t Differentiate by Shape Separate Facility for each shape All shapes in same facility Letters and Flats in one type of plant Parcels & Outsides in another Differentiate by Mail Class Don’t Differentiate by Mail Class Separate Facility for each mail class All mail classes in the same facility Separate facilities for Preferred and Standard mail Separate facilities for Expedited, FCM, and Standard Examples of Scenarios to Be Analyzed

14 Integration Information Platform Industry Task Force Recommendations Product Redesign Equipment Deployment Facility Consolidation (AMP)

15 A More Cost Effective and Service Responsive Network Lower Costs System-Wide (USPS & Private Sector) Additional Opportunities to Partner With Customers and Consolidators Will integrate Various IT Solutions with NIA’s Logistics Optimization and Simulation Tools – Postal One! & SASS Increased Network Flexibility to Manage in an Uncertain Future What Does NIA Mean to You?