1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson.

Slides:



Advertisements
Similar presentations
1 Introducing the Specifications of the Metro Ethernet Forum.
Advertisements

RFID IN UNIVERSITY OF JAMMU RFID is used in libraries primarily to automate the book handling process including checkout, inventory maintenance, and check-in.
Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1 Information Technologies Page 1Information Technologies.
WECC VGS PWG P-3 Transmission Capacity and Adequacy Matt Muldoon Mar 31,
1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
Regulatory Proposal December We provide distribution services to 1.4 million residential and business customers We deliver electricity to.
Chapter 19: Network Management Business Data Communications, 5e.
Smart Urban Low Voltage Network Low Carbon Network Fund Tier 1 Project UK Power Networks & TE Connectivity.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
Parallel Programming Laboratory1 Fault Tolerance in Charm++ Sayantan Chakravorty.
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
1 The Pain and Gain of Test Automation – the early days Andy Redwood Portman Building Society
Chapter 19: Network Management Business Data Communications, 4e.
© ABB Group June 10, 2015 | Slide 1 1MRS A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012.
Software Testing. Overview Definition of Software Testing Problems with Testing Benefits of Testing Effective Methods for Testing.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Distribution Management System Implementation at Florida Power & Light
Chapter 3: The Project Management Process Groups
1 Fault Assistance Centre David Talbot & Chris Armstrong September 2014.
Principles of Information Systems, Sixth Edition 1 Systems Investigation and Analysis Chapter 12.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Investigation and Analysis Chapter 12.
Xtreme Programming. Software Life Cycle The activities that take place between the time software program is first conceived and the time it is finally.
Southern Cluster Improving Healthcare through IT John Willshere Regional Implementation Director Southern Cluster.
Problem Management Launch Michael Hall Real-World IT
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
GridWise ® Architecture Council Cyber-Physical System Requirements for Transactive Energy Systems Shawn A. Chandler Maseeh College of Electrical and Computer.
An Overview of Our Regulatory Proposal
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
4/21/2017 MicroSCADA Pro DMS 600 Matti Kärenlampi FISUB/Österbacka.
SOFTWARE ENGINEERING1 Introduction. Software Software (IEEE): collection of programs, procedures, rules, and associated documentation and data SOFTWARE.
Frankfurt (Germany), 6-9 June 2011 ROSA – PT – S3 – 0249 EDP DISTRIBUTION AUTOMATION (r)EVOLUTION.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
Endesa Colombia Our Distribution System In Front Of The Development Of Colombia.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
© ABB PTMV - 1, ABB Overhead Distribution Systems.
Continuous Deployment JEFFREY KNAPP 8/6/14. Introduction Why is it valuable How to achieve What to consider.
The Implementation of BPR Pertemuan 10 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 / Name / Date IDA Interface for Distributed Automation The journey toward Distributed Intelligence.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Introduction to the Continual Service Improvement Toolkit Welcome.
MV Network Operation and Control Barcelona May 2003 Eugenio Di Marino Italy Session 3 Alpha 1 Block 1.
Life cycle services for automation products
Case Study: How Web Technology Facilitated Implementation of a Business Plan NAPEO 2004 Presented by: Dan Danzig, VP Marketing SpectrumHR, LLC.
Software Testing Process By: M. Muzaffar Hameed.
Principles of Information Systems, Sixth Edition Systems Investigation and Analysis Chapter 12.
Closing Plenary Dr. Les Lenert Wednesday, January 14, 2009.
NERC Lessons Learned Summary LLs Published in September 2015.
Agile Methods Presentation By: Jason Abbett. Definition A process to rapidly develop software Many kinds of agile methods but few are practiced.
Chapter 8 Process Implementation Reference: Tan, A. (2007). Business Process Reengineering in Asia: A Practical Approach, Pearson Education, Singapore.
Software Testing Process
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
CSI - Introduction ITIL v3.
Minimising IT costs, maximising operational efficiency IO and NIMM: Now is the time Glyn Knaresborough Director of Strategic Consulting.
Impact Research 1 Optimizing Your Help Desk: Summary Document.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
Distribution Automation The utilization of IEDs (Intelligent Electronic Devices) and advanced communications to unlock the benefits of operational efficiency.
ERP OVERVIEW PRESENTED BY JAYA AGRAWAL. TABLE OF CONTENTS WHAT IS ERP HOW DO ERP SYSTEMS WORK ERP COMPONENTS AN ERP EXAMPLE: BEFORE ERP AN ERP EXMAPLE:
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
Microsoft Azure Makes It Simple to Integrate Data between Dynamics CRM and Web Portal MINI-CASE STUDY “We needed to deliver our customer a robust and.
Summary.
Workstream X – Project Description Scope.
Managed Content Services
Presentation transcript:

1 A Case Study of Extensive Automation in London Cliff Walton & Bob Jackson

2 Key issues Improving network performance –Regulatory targets and incentives –Customer satisfaction (2.2m) Maximising impact of investment Time, Cost and Difficulty of asset replacement work in London

3 Remote Control Major scheme commissioned in substations Cired Case Study 2001

4 Remote Control Performance 28% improvement in CML CI Improvement Required!

5 Reducing CI by Simple Automation Requirements: –Simple scheme –Fast to implement on large scale –Low cost - software changes only –Building on existing Remote Control scheme –860 MV feeders –1.8 million of 2.2m customers

0-200 MVA per km 2 400,000 Customers not covered by Simple Automation

SEQUENCE CONTROL TYPICALLY 2/3 RESTORED IN <3 Minutes 3-4 S/S AWAIT MANUAL RESTORATION

8 Feeder Program Wizard 3 generic models Truth tables Applied to 860 feeders 2 Phase implementation No source CB control Source CB control

9 System Performance 1.8 million customers covered Typically –30% of customers restored in <3 minutes –70% restored in <30 minutes Over 250 faults handled to date

10 CI Progress 28% Remote Control

11 CML Progress 50% Remote Control

12 Lessons Benefits of Simplicity & Standardisation Critical importance of reliable communications 15% of system running abnormal at any time Abnormal running networks have higher than average fault rates?

13 Next Steps Extended to 1200 feeders in EPN More restoration stages? Dynamic reconfiguration? Integration with Incipient fault detection & location systems to isolate faults BEFORE they occur?

14 Summary Focus on fast deliverable CI results Simple, standardised approach Major benefits delivered to date - 28% in MV CI Next phase of an ongoing programme to deliver deliver cost and performance improvements though Real Time Risk Management for MV Networks

15