Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.

Slides:



Advertisements
Similar presentations
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Advertisements

5 MeV Mott Measurement for CEBAF Operations group Joe Grames, Marcy Stutzman February 14 th, 2007 Sir Nevill F. Mott at the ceremony with his Nobel Prize.
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Dept. of Energy M. Poelker,
Polarized Electron Source R&D at CEBAF/JLab P. Adderley, J. Brittian, J.Clark, J. Grames, J. Hansknecht, M.Poelker, M. Stutzman, R. Suleiman Students:
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
Commissioning of a Nebraska-type Retarding Potential Mott Polarimeter J. McCarter, M. L. Stutzman, T. J. Gay, K. Trantham, P. Adderley, J. Brittian, J.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
The present CEBAF Wien Spin Manipulator: Designed for 100kV beam and max rotation +/- 110 degrees Adaptation of SLAC design (how different?) X turn coil.
CEBAF Polarized Electron Source: Outlook & Horizon Operations Group Meeting May 13 th & 20 th, 2009 Joe Grames M. Poelker, P. Adderley, J. Clark, J. Grames,
AESOP: Accurate Electron Spin Optical Polarimeter Marcy L. Stutzman, Matt Poelker; Jefferson Lab Timothy J. Gay; University of Nebraska.
Ops Review, Jan , 2002, 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
/SC-PAC Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Joe Grames CEBAF Operations
Low Emittance RF Gun Developments for PAL-XFEL
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Strained Superlattice.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
Polarized Injector Status QWeak Collaboration Meeting February 1, 2010 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman, R. Suleiman,
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beam.
ExperimentEnergy (GeV) Pol (%) I (µA) TargetA pv (ppb) Maximum Charge Asym (ppb) Maximum Position Diff (nm) Maximum Angle Diff (nrad) Maximum Size Diff.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Recent Polarized Cathodes R&D at SLAC and Future Plans Feng Zhou Axel Brachmann, Jym Clendenin (ret.), Takashi Maruyama, and John Sheppard SLAC Workshop.
DC photogun vacuum characterization through photocathode lifetime studies Marcy L. Stutzman, Philip Adderley, Joseph Grames, Matthew Poelker, Ken Surles-Law.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lifetime Measurements.
Workshop on Precision Electron Beam Polarimetry for the Electron Ion Collider, University of Michigan, Aug 23-24, 2007 An EIC-like Polarized Electron Injector:
4 th Electron-Ion Collider Workshop, Hampton University, Monday May 19 th, 2008 CEBAF Load-Lock Polarized Electron Photogun Joe Grames & Matt Poelker (Jefferson.
Injector Status & Commissioning QWeak Collaboration Meeting May 24, 2010 P. Adderley, J. Clark, S. Covert, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
1/26 WSHQE–October 4-6, 2006 L. Monaco INFN Milano – LASA Photocathode FLASH: Quantum Efficiency (QE) L. Monaco Work supported by the European.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
CEBAF Source and Injector Status PREx-II Collaboration Mtg Feb. 26, 2016 Matt Poelker and Joe Grames Center for Injectors and Sources.
Status of GaAs Photoemission Guns at JLab M. Poelker, P. Adderley, M. Baylac, J. Brittian, D. Charles, J. Clark, J. Grames, J. Hansknecht, M. Stutzman,
G 0 Project Coordinator Report Joe Grames “Big Picture” Schedule Preparations Polarized Source Injector Accelerator Hall C Accelerator Plans for 687 MeV.
Operated by Jefferson Science Associates, LLC for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Polarized Electron Beams.
Thomas Jefferson National Accelerator Facility Precision Electron Beam Polarimetry Workshop - June , Jefferson Laboratory Accelerator Tools.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Polarized Injector & Upgrade Schedule QWeak Collaboration Meeting November 06, 2009 P. Adderley, J. Clark, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman,
A bit of CEBAF polarized source history…
Polarized Injector Update
Joe Grames Center for Injectors and Sources
with help from Riad Sulieman, Arne Freyberger, and Joe Grames
CEBAF Injector Update PREX/CREX March 3-4, 2017
Why are we removing our very good gun?
DC Injector and Space Charge Simulation Status
G0 Backward Angle Accelerator Preparations
CEBAF Injector Overview
5 MeV Mott Measurement for CEBAF Operations group
Upgraded Injector Test Facility
QWeak Collaboration Meeting
Electron Source Configuration
ELIC Injector Working Group High-P, high-I source issues (DC)
Polarized Positrons at Jefferson Lab
Bleedthrough (sometimes we call it “leakage”) Ops Staytreat June 28 – 30, 2016 Matt Poelker with help from John Hansknecht, Reza Kazimi, Todd Satogata,
Center for Injectors and Sources
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Riad Suleiman February 2, 2017
Advanced Research Electron Accelerator Laboratory
A. Freyberg Aug 2016 ECT’16 =>
Test of Booster at UITF Reza Kazimi (12/12/18)
Polarized Source: Recent Activities
LLGUN2 Biased Anode Commissioning
Drive Laser Commissioning Status
Presentation transcript:

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter Injector Test Stand G0 Beamline Gun & Laser Status Joe Grames

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Upgrades to G0 Tiger Laser Tiger laser was returned to Time-Bandwidth, Inc. for upgrades to help improve functionality in the tunnel. Replace Melles-Griot 3 W pump with a Jenoptic 5 W pump: improved reliability increased output power (although not needed) begin 2 nd run with a fresh pump laser Adding remotely controlled pico-motors: pump laser steering mirrors for power optimization birefringent filter to tune wavelength for peak polarization Serial communication to read laser parameters and measured phase noise. The return date is mid-July.

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Summer Plans for the Tiger laser When the Tiger returns to Jlab it will be moved to the ITS laser room in the Test Lab for July and August testing: Parity laser studies for G0 & HAPPEx2 (Pockels cell, IA, PZT) Testing new remote controls and communications The laser will be installed during the September shutdown (and not removed). A second Tiger laser has been ordered from Time-Bandwidth and is expected to arrive in late September. This will be our “hot spare”.

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Tunnel Operations Issues Remote control and readback should improve performance tracking and optimization. Although effort has been taken to minimize dust and particulates an access may be required every 2-3 weeks to clean the cavity optics. The G0 laser runs CW. We also use a pockels cell to create machine safe low duty factor beam. During the summer we will test a new fast HV switch and fast switching RTP Pockels cell to create equal peak current in both pulsed and CW modes. This will benefit Ops.

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 High Polarization Photocathodes Both guns have high polarization strained GaAs photocathodes from Bandwidth Semiconductor: Beam polarization is 75-80% QE starts at ~0.15% (1 uA/mW) Laser power >200 mW In September we will re-activate cathodes as needed and plan to have both guns ready for G0 (gun2 photocathode same as before). Depending upon gun current, gun vacuum and available laser power, a “spot move” may be required. Avoiding the electrostatic cathode center provides 4-5 spots over the unanodized 5mm active area. During last G0 run we ran from about one spot per month. The analyzing power of this cathode was about 5% (Aug. ‘02).

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 New High Polarization Photocathode SVT Associates is working with SLAC to grow high polarization superlattice photocathodes. The cathodes are promising, offering polarization ~85% with a QE of ~1% ! But, note that choosing a “designer cathode” also requires matching the laser wavelength. There is a cost (time and dollars) for engineering and modifying the G0 laser to do this. We would need to purchase this option from Time-Bandwidth (~$15k). We need to order this now. From talk M. Woods (SLAC)

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 From talk M. Woods (SLAC)

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Injector Mott Polarimeter Status Brief history of the 5 MeV Mott polarimeter: Mott polarimeter was constructed and commissioned in the mid-90’s. Used by HAPPEx with 4-5% absolute uncertainty. Late 90’s improved elastic signal detection and foil extrapolation model Uncertainty: experimental (0.5%) + theoretical Sherman function (1%) => 1.1% 500 Å Gold

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Injector Mott Polarimeter Status The polarimeter has been little used the last 3 years. We are trying to turn this around: 1. Re-establish operability: Detector checkout & repair - Bogdan Wojtsekhowski Full time accelerator support - Sandy Roman 2. Consider upgrades to make the tool ready for the Physics program: Be compatible with delayed/random helicity modes. Augment Ops support/documentation (less of an expert’s tool). Be “Spin Dance ready”, particularly for machine energy measurements.

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 High Voltage Activation Load lock Source laser Beam line JLab’s First Load-Locked Polarized Electron Gun Injector Test Stand, March 2003

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 JLab’s 100 kV Load Locked Polarized Electron Gun Commissioning Underway at Test Cave: Lifetime studies at high current - Summer. Upgrades & tests for the load-lock gun - early Fall. Characterize beam properties at high bunch charge (i.e., g0 beam development) – late Fall. Gun Features: Photocathodes can be swapped within 12 hours. No more bakeouts and related 3 day downtime. No cesium in high voltage chamber. This eliminates field emission and subsequent photocathode death. No reason to vent the gun. As a result, better vacuum and gun lifetime.

Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 G0 Beamline Testbed Goal #1: improve transmission (chopper) while operating w/ lower prebuncher gradient. Goal #2: develop solution without CEBAF downtime. Reduce length of 100 keV section of beamline (artifact of T-Gun). Cannot sacrifice vacuum quality of gun ! Apertures A1 & A2 straddle Wien filter Wien Filter Load-lock gun replaces one horizontal tunnel gun. NEG beamtube, Y-chamber, & laser can remain unchanged. Prebuncher located much closer to gun. Chopper RF Cavity #1