CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.

Slides:



Advertisements
Similar presentations
Ron Bass, J.D., AICP, Senior Regulatory Specialist Jones & Stokes Common NEPA Mistakes and How to Avoid Them January 17, 2008 Oregon Department of Transportation.
Advertisements

Identify Problems, Planning Objectives and Constraints.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
[Organisation’s Title] Environmental Management System
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Improvements to Project Development and Program Management of New Starts Projects FY 2008 Proposed Effective April 30, 2006.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Alternatives Categorical Exclusion Training Class.
Environmental Management System (EMS)
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Identify Problems, Planning Objectives and Constraints
Systems Engineering Management
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Technical Writing Function. The purpose of having guidelines is to make the document more readable. Standard guidelines govern – Format – page layout,
Purpose of the Standards
The National Environmental Policy Act (NEPA)
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Protection Against Occupational Exposure
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
8/23/2015 ASI Convention 2014 Puebla, Mexico Writing a project proposal (a brief overview) Theodore Jaria (Communication/ASI Caribbean Union)
CHAPTER 2 ENVIRONMENTAL DOCUMENTS AND PROCESSING.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Environmental Impact Assessment (EIA): Overview
Approaches for forest certification System versus performance ? Presentation prepared by Pierre Hauselmann for the WWF / WB Alliance Capacity building.
What does an Environmental Professional Do?
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
WRITING A BETTER PURPOSE AND NEED A COMMON SENSE APPROACH Kevin E. Davis Environmental Supervisor ODOT-OES.
M4 - 1 BU ILDING STRONG SM Multi-Purpose Projects Module M4: Telling the Plan Formulation Story.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
1 CDBG and Environmental Review For Local Officials.
SEA in the Czech Republic Prague, 24 September 2008.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
ISO Registration Common Areas of Nonconformances.
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
CHAPTER 16 Preparing Effective Proposals. PRELIMINARY CONSIDERATIONS  Conducting a Preliminary Assessment  Prior to Writing the Proposal  How Fundable.
PURPOSE & NEED Categorical Exclusion Training Class.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
National Environmental Policy Act and Endangered Species Act Compliance in the Bureau of Land Management.
EIA approval process, Management plan and Monitoring
Introduction to the California Environmental Quality Act (CEQA)
National Environmental Policy Act of 1969 (NEPA)
National Environmental Policy Act (NEPA)
22 CFR 216 A Brief Walk Through
Unit 6 NEPA.
5. IMPACT ASSESSMENT WORLD CAFÉ: ALTERNATIVES ANALYSIS
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
Strategic Environmental Assessment (SEA)
Presentation transcript:

CHAPTER 4 ALTERNATIVES

--- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives which, in turn, leads to better decision making.” (p. 51) … and shall serve as the means of assessing the environmental impact of proposed agency actions, rather than justifying actions already taken (Jain et al.)

- Agencies will focus on significant environmental issues and alternatives and should reduce paperwork and the accumulation of extraneous background data (C.F.R Implementation) --- to achieve these purposes agencies shall prepare an EIS in the manner (C.F.R ).

(d) state how alternatives considered in it and decisions based on it will / will not achieve requirements of Section 101 [ Congressional Declaration of National Policy] and Section 102 [EIS] of NEPA and other relevant environmental law (e) range of alternatives discussed in EIS shall encompass those to be considered by the ultimate agency decision maker

(f) agencies shall not commit resources prejudicing selection of alternatives before making a final decision [reiterated in C.F.R Limitations on Actions During NEPA Process] … what text (p. 53) means by “… initial range of alternatives should not be limited by preconceived solutions.”.

- Because of the importance in impact analysis, study of alternatives should be thorough and systematic and include input from all interested / potentially impacted governmental / population elements

4.1 Purpose and Need - The foundation for developing alternatives is to establish in depth and conciseness: (1) deficiencies of the current situation (2) the need for specific action (3) establish explicit goals / objectives that will satisfy existing need - Written purpose-and-need will become the first section of the EA or the EIS --- it should lead clearly and methodologically to the adopted list of goals and objectives --- scope of its participation should mirror the project

4.1 Purpose and Need, cont - This sections should be treated as the “heart” of the EIS --- based on sections Affected Environment and Environmental Consequences it should present environmental impacts or proposal and alternatives in a comparative form [thus giving a clear basis for option choices by sponsoring agency and interested parties]

4.1 Purpose and Need, cont - In this section the agencies shall: 1. explore and objectively evaluate all reasonable alternatives [where alternatives have been eliminated, briefly discuss why] 2. devote substantial treatment to each alternative considered in detail [so evaluators can assess comparative merits of each] 3. include reasonable alternatives not in the jurisdiction of lead / sponsoring agency

4.1 Purpose and Need, cont (4) identity lead / sponsoring agency preferred alternative(s) (5) include alternative of no-action (6) include appropriate mitigation not already included in proposed action or alternatives 4.2 Developing a Preliminary Range of Alternatives - If Purpose and Need has been carried out, developing an initial range of alternatives follows logically

--- range should include the consideration of all possible ways to respond to identified need and established goals and objectives, including those that may be outside the jurisdiction of the sponsoring agency - These alternatives might be grouped / categorized: … No-Action… Technology … Location / Siting… Configuration … Policy

4.3 The Screening Process - The next step in the screening of initial alternatives towards a preliminary list of reasonable alternatives for scoping --- this is based on a set of preliminary evaluation criteria… including, but not limited to:

Efficiency in responding to state needs and objectives Maximum cost bases on funding Political acceptance. Engineering constraints Significant, obvious environmental effects

- The environmental study will be environmental overview of Chapter Sometimes called a constraint assessment or fatal-fault analysis, this overview investigates the proposed project / activity characteristics and location for possible severe environmental effects. For example:

Existence of an endangered species-critical habitat Wetlands destruction. Required destruction of, or alternation of, a significant visual amenity Location within a Native American religious site. Alteration of a designated floodway

- Results of initial screening will be the preliminary list of possible alternatives for the scoping process - Alternatives will continue to be screened and refined during environmental analysis to avoid or minimize potential impacts

4.4 The No-Action Alternative -In all studies, the option exists to “do nothing” … this alternative normally consists of maintaining the existing or proposed future condition, with no significant capital outlay - Although the No-Action Alternative, by definition, will not respond to stated needs or meet goals/objectives,

It cannot be dropped from the list of alternatives considered in environmental studies or from the environmental document … if for no other reason, this option becomes a baseline for comparison with future alternative actions/scenarios [i.e.: this is how things are/will be – how will each alternative affect this situation?] … the No-Action Alternative cannot just be a “now”, it must also project future characteristics without any action being taken and be aware that no-action by itself can foster adverse impacts

4.5 Contents of Draft Environmental Impact Statement and 4.6 Reassessment and Selection of Preferred Alternative [Really nothing new in these sections. Discussed extensively in NEPA Section 102 material in Introduction and Chapter 1 and additional introduction in Chapter 3]

4.7 Contents of Final Environmental Impact Statement - Alternatives section of FONSI of FEIS focuses in the preferred alternative --- procedures of, and reasons for, selection or elimination should be given detailed coverage --- alternatives introduced in the DEIS but not selected should be summarized and a clear statement for reason of dismissal provided - Afterwards, FEIS is circulated to all agencies and individuals commenting on DEIS - Public announcement of completion and 30 days review period for additional comment

4.8 Record of Decision - Prepared after the EIS review period - Usually ends the NEPA EIS procedure - Written to be a concise record of: (1) the decision made (2) identification of all considered alternatives, specifying the alternative that was environmentally advisable (3) discussion of preferences among alternatives and the basis for each preference (4) a statement on practical means to avoid/minimize environmental harm from the selected