TEAM Presentation January 21, 2003. Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.

Slides:



Advertisements
Similar presentations
Syracuse City Council March 8, EIS Process & Schedule.
Advertisements

Fern Valley Interchange Public Hearing November 3, 2010.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Harlan to Hazard Study Public Workshop #2 Harlan to Hazard Study Public Workshop #2 Harlan, Leslie, & Perry Counties, KY December 2003 Harlan, Leslie,
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Hanley Road Corridor Study - St. Louis County, Missouri Hanley Road Corridor Study A Corridor Approach to Traffic Impact Studies September 20, 2005 Presentation.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
1 AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment cards PRESENTATION 6:30 PM.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
U.S. 150 / S.R. 56 Road Reconstruction Project in Paoli, Orange County Thursday, August 25, :00pm Presentation Orange County Community Center 1075.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
System Management and Operations System Development and Design Growth and Development Plan Components E AST -W EST G ATEWAY.
Fern Valley Interchange Project Development Team Meeting February 3, :00 – 11:00 p.m.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Planning and Environmental Linkages MPO/COG Conference February 24, 2016.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Willow Meadows Civic Club Meeting September 13, 2011
Wilmington Collector Street Plan
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 261 Intersection Improvement at Fruitwood Lane in Newburgh
U.S. 20 at State Road 2 New Interchange
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

TEAM Presentation January 21, 2003

Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately needed EIS is Critical Milestone EIS is Critical Milestone

What’s the Problem? Aging, crumbling infrastructure Aging, crumbling infrastructure Overpasses not tall enough Overpasses not tall enough Interchanges too close Interchanges too close On/Off ramps too short On/Off ramps too short

Goals for Reconstruction Better traffic flow Better traffic flow Enhance surrounding communities Enhance surrounding communities Last another 40 years Last another 40 years

Purpose for The New I-64 Freeway Condition & Interchange Features Freeway Condition & Interchange Features Capacity Capacity Traffic Safety Traffic Safety Operation and Congestion Operation and Congestion Community Redevelopment Community Redevelopment

Starting The Process Started with Single-Points at every interchange Started with Single-Points at every interchange Driver familiarity Driver familiarity Dense urban area Dense urban area High volume of traffic High volume of traffic

Single Point Urban Interchange cloverleafsingle point

Over or Under? highway over arterial street highway under arterial street

Single-Point – Traffic Simulation

3D Animation of Traffic Flow

Comparison of Interchanges diamondsingle point

Traffic Analysis Traffic Counts on Existing Traffic Counts on Existing Project Future Traffic Project Future Traffic

Regional Traffic Model Spans from I-70 to I-44 and I-270 to downtown Spans from I-70 to I-44 and I-270 to downtown Includes non-state roadways Includes non-state roadways

Construction Staging Depends on Funding Depends on Funding Best Case = 6 years Best Case = 6 years Worst Case = 16 years Worst Case = 16 years

Construction Traffic Diversion I-70 and I-44 I-70 and I-44 MetroLink Cross-County line open MetroLink Cross-County line open Signal timing on parallel roads Signal timing on parallel roads Encourage flex time, telecommuting and carpooling to reduce rushes Encourage flex time, telecommuting and carpooling to reduce rushes

Screening Options No Build and Build Options No Build and Build Options Two levels of screening – initial & refined EIS alternatives. Two levels of screening – initial & refined EIS alternatives. Most of the options subcommittees discussed were evaluated early Most of the options subcommittees discussed were evaluated early Those decisions are documented in the EIS in Chapter 2: Alternatives Those decisions are documented in the EIS in Chapter 2: Alternatives

Selecting the Preferred Alternative Interchange at I-170 Stacked or flat from Brentwood to Hanley?Stacked or flat from Brentwood to Hanley? Shifted north or south from McCutcheon to Brentwood?Shifted north or south from McCutcheon to Brentwood? Oakland Avenue Oakland Avenue Eastbound Off Ramp or Not?Eastbound Off Ramp or Not?

I-170 Flat Option Selected

I-170 Selected = South Alignment west of Brentwood

I-170 Ramps

Oakland Ramp Selected = No off ramp to Oakland

Draft EIS Schedule Notice of Availability Published in Federal Register January 3 Notice of Availability Published in Federal Register January 3 Start of eight-week comment periodStart of eight-week comment period Open House Public Hearing January 29 Open House Public Hearing January 29 Noon to 8 p.m.Noon to 8 p.m. St. Louis Science Center, Lower LevelSt. Louis Science Center, Lower Level Comment Period Closes February 28 Comment Period Closes February 28

Reviewing the DEIS Summary Summary Ch 1: Purpose & Need for Action Ch 1: Purpose & Need for Action Ch 2: Alternatives Ch 2: Alternatives Ch 3: Affected Environment Ch 3: Affected Environment Ch 4: Environmental Consequences Ch 4: Environmental Consequences Ch 5: Urban Design Ch 5: Urban Design Ch 6: List of Preparers Ch 6: List of Preparers Ch 7: Circulation List Ch 7: Circulation List Ch 8: Comments & Coordination Ch 8: Comments & Coordination Section 4(f) (parkland, historic sites) Section 4(f) (parkland, historic sites)

Reviewing the DEIS Maps Found in Volume 2: Appendix Found in Volume 2: Appendix Shown West to East Shown West to East Preferred Alternative First Preferred Alternative First As entire 12 milesAs entire 12 miles Other Alternatives Shown at End Other Alternatives Shown at End

Forest Park Property Needs Property Needs Trees Trees Aviation Field Aviation Field Turtle Park Turtle Park Zoo Zoo Pedestrian Access Pedestrian Access

What Happens After Draft EIS? Final EIS Final EIS Record of Decision Record of Decision Detailed Design work begins Detailed Design work begins Property Acquisition = earliest 2007 Property Acquisition = earliest 2007 Construction = earliest 2008 Construction = earliest 2008

Where to View the EIS? MoDOT MoDOT District Office in ChesterfieldDistrict Office in Chesterfield Libraries Libraries Downtown BranchDowntown Branch Forest Park Community CollegeForest Park Community College Richmond HeightsRichmond Heights St. Louis County Branch on LindberghSt. Louis County Branch on Lindbergh City Halls City Halls Kinko’s on S. Brentwood Kinko’s on S. Brentwood

Available online at

How to Comment? On website On website At Public Hearing At Public Hearing Mail or fax to MoDOT St. Louis Office Mail or fax to MoDOT St. Louis Office

Thank you! Questions?