Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK 2006.3.25.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
CLIC related CERN-KEK collaboration J.P.Delahaye for the CLIC study team.
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
Agenda for 1st TB and SGC Joint meeting on Dec. 13 (from 15:00 to 19:00) 15:00 to 17:00 Open Session 15:00-15:30 Review of Hardware and Instrumentation.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
ATF2 project in the ATF international collaboration, including coordination issues Junji Urakawa, KEK ATF2-IN2P3-KEK kick-off meeting Annecy, LAPP, for.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
26 Apr. 07 ILCSC-MAC, FNAL Global Design Effort 1 Asian R&D Activity and Resources K. Yokoya KEK ATF/ATF2, STF KEK budget Korea, China, India.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
1 You have to Check URL of Change of ICB and TB member or member’s institute comparing last meeting.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
==================================
ILC-Americas Regional Team Review
Plans for Laser-wire System Grahame Blair 30th May 2005
Oversea collaborators
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
Pol. positron generation scheme for ILC
Progress towards nanometre level beam stabilisation
Junji Urakawa ( for collaborators ) March KEK at LNF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK

1 ATF Collaboration History ATF Construction and R&D’s have been started with SLAC from From 1997 International collaboration started for the R&D’s with Damping Ring. ATF MoU was established on 1 st Aug New organized ATF international collaboration has been started. (20 Institutes or more were signed.) 1 st ICB meeting in Snowmass, 1 st TB meeting at KEK on Dec.. 2 nd TB meeting will be scheduled in May after ILC school. From 2008, ATF2 : the final focus test beam line, will be operated.

2

3

4 ICB-Members (18) ICB Members: Bob Kephart Brian Foster David Miller Fumihiko Gerry Dugan Cornell J.P. Delahaye Jai Gao John Corlett Kaoru Yokoya Nick Walker Nobaru Sasao Kyoto Paterson, Ewan (chair) Philip Burrows QMUL (Later, to Oxford Robert Meller Cornell Sachio Komamiya University of Tsutomu Nakanisi Nagoya Washio Masakazu Waseda Jinhyuk Choi

5 ATF Technical Board (TB) : Total 13 members August 1, 2005 Europe…………………………... N. Walker, DESY G. Blair, RHUL (Royal Holloway, University of London) P. Burrows, QMUL (Queen Mary, University of London) F. Zimmermann, CERN North America………………….. T. Raubenheimer, SLAC M. Ross, SLAC S.Mishra, FNAL A. Wolski, LBNL (Later, to the Cockcroft Institute in UK ) Asia……………………………… K. Yokoya, KEK N. Toge, KEK T. Sanuki, University of Tokyo J. Gao, IHEP E-S. Kim, PAL (Later, to KNU(Kyungpook National Univ.))

6 Three Deputies (with help of sub-Deputies of KEK): Total 6 Members Deputy for Beam operation: S.Kuroda (T.Okugi) Deputy for Hardware maintenance: N.Terunuma (M.Kuriki) Deputy for ATF2: A.Seryi (T.Tauchi) SGCs : Total 18 members H.Weise of DESY, F.Zimmermann of CERN, Philip Burrows of UK, Grahame Blair of UK, M.Ross of SLAC, A.Seryi of SLAC, R.Meller of US University, A.Wolski of LBNL, J.Gao of IHEP in Beijing, E.S.Kim of PAL, K.Kubo, S.Kuroda, N.Terunuma, M.Kuriki, T.Tauchi, T.Okugi, R.Sugawara of KEK, T.Sanuki of Tokyo University ATF SGC (System and Group Coordinators) : Total 18 members

7 1. Usually schedule of ATF machine operation is divided to two blocks of operating time per year with about four months summer long shutdown. One block is from mid. of Oct. to Dec., and the other is from mid. of Jan. to mid. of June. Since there are many collaborators, we proposed two meetings of TB per year in Dec. and May for review and recommendation of the research programs at ATF. We can allocate following points to TB and SGC Joint Meeting, if necessary. *TB and SGC Joint Meeting in Dec. is mainly devoted for the evaluation on present R&D’s. *TB and SGC Joint Meeting in May is mainly devoted for the evaluation on new proposals. Of course, we will discuss both issues on R&D’s and new proposal in TB and SGC Joint Meeting. 2. Requests to new proposal : Purpose, Research method, Period of the research, Manpower, Budget plan etc. should be reviewed for the approval. See Template for the new proposal (see 3. Member of ATF operation group : Shift leader is responsible for the safety and should be KEK staff. Since ATF operation group is responsible for beam tuning, making a good beam and required beam by R&D group, ATF operation group can involve many physicists and engineers from overseas countries.

8 Assignment of the ATF Beam Time TB: Approved Studies ~2/3 SP: Approved Studies Beam Tuning Maintenance Typical ~22 weeks/year About 20 % of total will be used for the maintenance and the beam tuning. It is estimated by current results. Guideline for approved studied by SP. 1.Short term study 2.No conflict with approved studies by TB and ICB. 3.Test study for new proposal 4.SP can accept until two shifts/week but it depends on the situation of studies.

9 Schedule of ATF operation, TB meeting and Long shutdown

10 Mission of ATF 1.Establish the technologies associated with producing the electron beams of the quality required for ILC. 2.Provide such beams to ATF2 in a stable and reliable manner. 3.Serve the mission of providing the young scientists and engineers with training opportunities of participating in R&D programs for advanced accelerator technologies.

11 ATF Accelerator Test Facility

12 R&D items in ATF 1. kicker study for extraction of ILC-like bunch spacing.1. kicker study for extraction of ILC-like bunch spacing. Multi-pole component of kicker and septum is under study. kicker study for ILC Damping Ring.2. Fast rise/fall strip-line kicker study for ILC Damping Ring. <3ns rise/fall is under study. 3. High resolution Ring-BPM for more small vertical emittance.3. High resolution Ring-BPM for more small vertical emittance. application of digital signal process is under study. 4. Coherent Synchrotron Radiation(CSR) study. development of CSR detection is underway. 5. Cavity BPMs.5. Cavity BPMs. nm resolution BPMs, PAL-BPM at ATF2, IP-BPM at ATF2. 6. Laser Wire beam size monitor.6. Laser Wire beam size monitor. Fast sweep LW at EXT-line, Shintake-monitor at ATF2. 7. Fast orbit feedback for ILC collision point.7. Fast orbit feedback for ILC collision point. digital feedback method is under development. 8. Many other instrumentation(ODR, XSR, Many other instrumentation(ODR, XSR, 9. S-band RF-gun study for stable injection into ATF-DR.9. S-band RF-gun study for stable injection into ATF-DR. 10. Pol. positron generation R&D based on Compton scattering.10. Pol. positron generation R&D based on Compton scattering. 11. Fast Ion Instability Measurement 12. Multi-bunch Instability Study

13 Highlight Studies in Extraction Line Stable beam extraction from DR –Kick angle compensation for multi-bunch, Double kicker system –Multi bunch extraction with ILC like beam spacing (2005~) –3 bunch extraction with 150ns spacing by 300ns flat-top double kicker. Instrumentation developments –Beam size monitors Optical Diffraction Monitor, Wire scanners (Tungsten, Carbon), Laser wire (UK, 2005~) –Nano meter resolution Beam position monitors : Cavity BPM Intra-train beam feedback –FONT (UK) / FEATHER (KEK) –Feed-forward to Extraction line from DR (UK, 2006~) Other R&D –Polarized positron generation Compton scattering with electron beam and polarized laser –Stabilization of components, Straightness monitor, StaFF (UK, 2006~) More new R&D in ATF will be proposed.

14 Prospect of ATF ATF International R&D will generate necessary results for ILC, especially how to control high quality beam, develop many kinds of advanced instrumentation, educate young accelerator physicists and engineers. ILC like beam which means 20 bunches with bunch spacing about 300nsec, in the future. Realization of about 35nm beam for long period.

From US, EU, Russia, China, Korea, India and Japanese Univ., Many young physicists and engineers are learning and developing advanced accelerator technologies for ILC project. ATF Control Room