1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014-2015 OASIS OSLC PROMCODE TC Domain Model.

Slides:



Advertisements
Similar presentations
Longitudinal Coordination of Care LTPAC SWG Monday July 22, 2013.
Advertisements

Longitudinal Coordination of Care LCP SWG Monday July 22, 2013.
1 The OASIS OSLC Lifecycle Integration for Project Management of Contracted Delivery (OSLC PROMCODE) Technical Committee (TC) Agenda for the First TC Meeting.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
ISO TC 184/SC San Francisco Opening plenary1 ISO TC184/SC4-SC5 JWG8 N249 SAN FRANCISCO OPENPLENARY.
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda January 6, :00 – 10:00 AM PST.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 PROMCODE Service Specification  PROMCODE.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
M2M Study Report: Status Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0008 Date Submitted:
Proposed TOSCA TC Timeline March 1, TC Deliverables Standards Track Work Products – “…is a Work Product produced and approved by a TC in accordance.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
1 All Rights Reserved, Copyright, Mikio Aoyama, 2014 OASIS OSLC PROMCODE TC Issues Discussed at The Ad Hoc Meeting during Innovate 2014 Memorandum Submitted.
BPEL F2F Jan 10 – 12, Proposed agenda Jan Administrative start up –attendance, quorum, minute takers –Review/accept minutes from previous.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
ARIP Technical Committee Convener Call 07 April
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
PROMCODE Technical Committee Convener Call 14 February
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
GNSO/Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
OData Technical Committee Convener Call June 5, 2012.
Simple Use Case of PROMCODE model July 9th, 2014 Japan team (Aoyama, Yabuta, Yoshida, Matsumoto, Wkao, and Kamimura)
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model.
Agenda Start up admin: roll call, approve agenda, appoint minute takers, approve last meeting minutes Review and approve latest draft of spec Issue discussion:
1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, 2014 OASIS OSLC PROMCODE TC Domain Model Revisited.
1 Current status of OASIS ebXML CPPA TC Yukinori Saito Electronic Commerce Promotion Council of Japan (ECOM, 10 th.
® Sponsored by GroundWaterML2 SWG 97th OGC Technical Committee Sydney, Australia Bruce Simons 02 December 2015 Copyright © 2015 Open Geospatial Consortium.
© 2013 OSLC User Group for Communications OSLC Member Section at OASIS present state and outlook, 6 September 2013 Open Services for Lifecycle Collaboration.
® Sponsored by Architecture DWG 98th OGC Technical Committee Washington, DC USA Carl Reed, Joan Maso 10 March 2016 Copyright © 2016 Open Geospatial Consortium.
PACR Technical Committee Convener Call 09 January /9/131.
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
XLIFF 2.x release cadence
OASIS TC Process Overview
Specification Development and Review Team
OASIS eTMF TC Inaugural Meeting 16 December 2013
OASIS Overview TC Process
OASIS Overview TC Process
FFM TC status Thinh Nguyenphu as FFM TC Chair NSN
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
OASIS Overview TC Process & Administration
TC Process Specification Flow
OASIS OSLC PROMCODE TC Recommended adoption of terms from OSLC Estimation and Measurement Service (EMS) Vocabulary Arthur Ryman 2015/01/19.
OSLC Domains TC Inaugural Meeting 30 September 2016
FFM TC status Thinh Nguyenphu as FFM TC Chair NSN
ARIP TC Inaugural Meeting 22 May 2015
OASIS Overview TC Process
CTI TC Inaugural Meeting 18 June 2015
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda Comment Review Period January 5, :00 – 10:00 AM PDT.
WS-RX TC Process for Specification Development
WS-RX TC Process for Specification Development
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
CANNABIS CONTROL COMMISSION
Martin Shaw – Reliability Solutions
November 2018 Opening Report
© All Rights Reserved.
NDIA Intent Guide Update for EVMIG.
Section 10.5 The Dot Product
Harmonisation Activity Progress report
Presentation transcript:

1 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, OASIS OSLC PROMCODE TC Domain Model Revisited and Use Cases Development Plan of Specifications (Memorandum) Specification Development and Review Team Mikio Aoyama, Kazuhiro Funakoshi, Yoshio Horiuchi, Tsutomu Kamimura, Shigeaki Matsumoto, Arthur Ryman, Masaki Wakao, Kazuo Yabuta, Hiroyuki Yoshida, 2014/07/21, 08/05, 08/19, 9/02, 9/16, 9/19, 10/01,11/11, 11/25, 12/10, 12/24, 2015/01/07, 01/21, 02/04,02/18(2/20), 03/04, 04/08, 04/22, 05/13, 7/8, 7/22 Specification Development and Review Team Mikio Aoyama, Kazuhiro Funakoshi, Yoshio Horiuchi, Tsutomu Kamimura, Shigeaki Matsumoto, Arthur Ryman, Masaki Wakao, Kazuo Yabuta, Hiroyuki Yoshida, 2014/07/21, 08/05, 08/19, 9/02, 9/16, 9/19, 10/01,11/11, 11/25, 12/10, 12/24, 2015/01/07, 01/21, 02/04,02/18(2/20), 03/04, 04/08, 04/22, 05/13, 7/8, 7/22

2 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, Time Line Revised MilestonePROMCODE Revised(4/22) Core (7/22) PROMCODE Revised(7/22) TC Launched2014/3/25 Start Writing Working Draft2015/3/5 Working Draft5/10 TC Review30 days Update Draft for Comments14 days Committee Draft6/249/159/20 Review of Member Section & Core? Committee Draft (Due)7/89/3010/10 Committee Draft Public Review60 days 9/811/3012/10 Update Spec for Comments => Candidate of OASIS Standard 14 daysImple. 90days? Committee Specification and SoU Due9/222/e Vote14 days+7 days3/m OASIS Standard10/43/e?3/e

3 All Rights Reserved, Copyright Next-Generation Project Management Data Exchange Architecture Committee, Upcoming TC Meeting Schedule Proposed ScheduleDate/Time [EST]Date/Time [JST]Note 29TC Meeting8:00 p.m., Jul. 79:00 a.m., Jul. 8 30TC Meeting8:00 p.m., Jul. 219:00 a.m., Jul TC Meeting8:00 p.m., Aug. 49:00 a.m., Aug. 5 32TC Meeting8:00 p.m., Aug. 189:00 a.m., Aug. 19