Accountability & Quality Update. – ACCESS ELLs/Alternate ACCESS March 20 th end of testing window. Materials should be returned within two instructional.

Slides:



Advertisements
Similar presentations
January 2001GZHANG NCDPI Accountability Division Evaluation Section C:\Minority\Achievement&Gap_ncare2001.ppt Minority Achievement and Achievement Gap.
Advertisements

Accountabil ity System Student Achievement Index I Student Progress Index 2 Closing Performanc e Gaps Index 3 Postsecondary Readiness Index 4 Overview.
South Dakota Accountability System – Year 2 School Performance Index Guyla Ness September 10, 2013.
Data Analysis State Accountability. Data Analysis (What) Needs Assessment (Why ) Improvement Plan (How) Implement and Monitor.
FY05 School Year Academic Support Preliminary Data Results (FY05 Fall & Winter Sessions) FY05 School Year Academic Support Preliminary Data Results (FY05.
Pitt County Schools Testing & Accountability The ABC’s of Public Education.
Accountability Update Ty Duncan Coordinator of Accountability and Compliance, ESC
NHCS READY Report December Presentation Format Curriculum Change Rationale and Timeline Proficiency for Grades 3-8 School Growth Proficiency for.
ESL Results and Targets Montgomery County Schools.
A New School Accountability Model. Draft – March Check for Updates to this Presentationhttp://
2010 California Standards Test (CST) Results Lodi Unified School District Prepared by the Assessment, Research, and Evaluation August 17, 2010 Board Study.
Accountability Services North Carolina Department of Public Instruction January 14, 2015 School Performance Grades.
Spring 2015 Test Administration Window for MCAS English Language Arts (ELA) Tests = ELA test administration window (March 23–April 6, 2015) If you are.
1 Policy No Child Left Behind of 2001 HSP-C-005/State Board of Education –Annual Language Proficiency Assessment –No Exemptions –Same standard, Same content.
Riverside County 2012 API and AYP Achievement Gap Mitch Aulakh.
State law and the federal Elementary and Secondary Education Act require Report Cards for every local school, every school district and for the state.
Accountability Updates NCAEE Region 1 May 2, 2014 M. E. (Butch) Hudson, Jr. Regional Accountability Coordinator Accountability Region 4.
PAIU C URRICULUM C OORDINATORS M EETING A PRIL 2015 PVAAS Update Kristen Lewald, Ed.D. PVAAS Statewide Director for PDE.
KCS DATA OVERVIEW. Accountability Results Composite School Performance School Year Change 2-Year Change Met All AMO Targets?Growth?
Registration andTransition Registration andTransition Bladen County Schools March 21, 2012 Presenter: Terry Smith.
ACCOUNTABILITY UPDATE Accountability Services.
ISES UPDATES April 16, Topics for Session Review of the Fall 2007 CD/YE Collection Changes in WSLS ISES Data CD/YE Element Changes October 1 Supplement.
KCS Achievement Data. District-wide Achievement District Achievement  Achievement plots will be included for the following subjects  Algebra I  Algebra.
1 Requirements for Focus Schools Contractors’ Meeting March 4, 2013 Presenter: Yvonne A. Holloman, Ph.D.
2011 Achievement Gaps By Various Subgroups: Reading and Math EOG Winston-Salem/Forsyth County Schools Board of Education October 11, 2011.
Winston Salem/Forsyth County Schools Testing Information Atkins Academic and Technology High School Parent Meeting February 16, 2012 Monta’ Ervin, Curriculum.
Welcome to Abbett Elementary! Curriculum Night 2015.
1 1 Next Generation School Assessment and Accountability Thursday, November 17, 2011 Draft - July 13, 2011.
Parkway District Improvement…. 10/16/ Outcomes  Why we are in District Improvement.  What is DISTRICT IMPROVEMENT?  How we got this rating. 
Academic Achievement Gaps in WCPSS Presented To Raising Achievement, Closing Gaps Taskforce September 18, 2009 Wake County Public School System.
2012 MOASBO SPRING CONFERENCE Missouri Department of Elementary and Secondary Education 1 April 26, 2012.
NHCS READY Report October READY Annual Report Contents Growth Proficiency: Detail for Grades 3- 8 and High School Progress: Annual Measurable Objectives.
Kingsville ISD Annual Report Public Hearing.
1 School Improvement & Accountability Update for P.S. Jones Middle Presented by: Tracey Nixon Principal.
Credit by Demonstrated Mastery (CDM) An Overview for School Counselors December 10, 2013.
Graduation Rate: A Process; A Product New Hanover County Schools September 2012.
WCPSS Student Achievement Evaluation and Research Dept. August 19, 2008.
Online Testing Overview English II EOC, Grade 8 Science EOG, ACCESS 2.0 for ELLs administered electronically in Utilizing school testing windows.
Measuring College and Career Readiness PARCC RESULTS: YEAR ONE Somerset Hills School District ____________.
Thank you for being willing to change the date of this meeting! Annabelle Low 7lbs 13oz.
Determining AYP What’s New Step-by-Step Guide September 29, 2004.
EVAAS Roster Verification Process Spring 2013 New Hanover County Schools.
Provided by: PVAAS Statewide Team for PDE
District Test Coordinator
Measuring College and Career Readiness
Administrative Conference, September 2013
Spring 2017 Georgia Milestones State Results
Sustaining and building on the excellence of LCPS
Hickory Public Schools Accountability Update - Math
2016 READY ACCOUNTABILITY DISTRICT RESULTS
PBMA 2016 Learning Gains.
EVAAS Roster Verification Collaborative Conference for Student Achievement 2013 Koury Convention Center SAS® EVAAS® for K-12 Copyright © 2010, SAS.
November Accountability & Quality Update
Why was the NCAAAI Developed?
2015 Data and AMO Presentation
District Test Coordinator
Accountability and Quality Update
Let’s Experience Online Testing!
WinScan32 and IndivRpt32 Updates
Accountability & Quality Update
Wednesday, Jan :30 a.m. Thursday, Feb. 1 4:30 p.m.
Texas State Accountability
Computer-Based Testing (CBT) Certification Tool
Accountability & Quality Update
Analysis and Reporting, Accountability Services

Director of ESEA Programs
Parent Information Session
March Accountability & Quality Update
Mississippi Succeeds Unprecedented Achievement, Unlimited Potential
Presentation transcript:

Accountability & Quality Update

– ACCESS ELLs/Alternate ACCESS March 20 th end of testing window. Materials should be returned within two instructional days of last testing session. – EVAAS Fall Roster Verification (RV) is complete. Spring RV tips: – Complete RV Spreadsheet along the way ( today). – Include EC, LEP and AIG staff. – Collaborate with data mangers and guidance counselors for transfers. – It’s all about instructional responsibility. – Spring 2015 Testing Training, April 30, 2015, at 9 AM. Online Tests- All EOCs, NCFEs, CTE and select EOGs ( 5 th Sci., 8 th Sci..,7 th Math, 7 th ELA) 4-5 days delay on English II, English III, Civics and Economics, American History I and American History II ; administer at the beginning of testing window (1-3) days. NC Test Browser must be installed on computers used for testing. Can’t use computers with Windows XP. – ACT Make-up Test Date is March 17 th CCRAA Grade 11 March 3 rd -17 th

Achievement Gap Composite (GLP) Purpose: To establish the EOG/EOC achievement gap for each school in Montgomery County. Criteria: Ethnicity (White, Black, Hispanic, Asian, Two or More Races) and Student with Disabilities. Calculations: 1. H (Highest Performing Subgroup) – S (Subgroup) = D (Difference) OR H-S=D 2. Total D (Add Differences)/Total S (Number of Subgroups) = C (Composite) OR D/S=C 3.Total C (Composites)/ Total CC (Course Categories)= AG (Overall Achievement Gap for Grade Span) OR C/CC=AG

MCS Reading/Math EOG Example 1. H (Highest Performing Subgroup) – S (Subgroup) = D (Difference) OR H-S=D SubgroupReadingMathAverageDifference White Black Hispanic Asian Two or more Student w/Disabilities

MCS Reading/Math EOG Example 2. Total D (Add Differences)/Total S (Number of Subgroups) = C (Composite) OR D/S=C DifferenceSubgroup Sum= /6= 21.6

Overall Achievement Gap 3. Total C (Composites)/ Total CC (Course Categories)= AG (Overall Achievement Gap for Grade Span) OR C/CC=AG Reserved for the district overall achievement gap which includes K-8 and 9-12 data sets.