1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Entergy Louisiana, LLC (North) 2010 to 2012 Draft Construction Plan
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Oct 14, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
1 New Orleans, LA July 31, 2007 Randy Helmick Vice President, Transmission Business Entergy Transmission Planning Summit.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
1 EMI’s “Bright Future” Solar Project CENTRAL in Jackson – Entergy Property Tracking with tilted axis – Estimated annual yield of 917,400 kWh.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
ONCOR Electric Delivery/ Texas New Mexico Power East Bell County to TNP One 345 kV Line Upgrade Projects Board of Directors July 17, 2007.
Barrilla Junction Area Transmission Improvements Project
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Entergy Integration Study Update
RMR Exit for Spencer 5 – Remedial Action Plans
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Presentation transcript:

1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003

2 ELI-North

ELI-North Transmission Reliability Projects Danville-Hodge: Build line ISD Sterlington-Bastrop: Build Line ISD Sarepta: Tap 345kV line ISD

4 Sarepta: Tap the 345kV line & Install a 345 to 115kV Auto The 115kV line from McNeil to Sarepta from south Arkansas to northwest Louisiana is 56miles long. Contingency: The loss of any section of the line between McNeil to Emerson will cause severe low voltages (68% to 91% to 6 stations). Recommended Solution: Build a new 345/115kV substation at Sarepta. Estimated Cost: $12,000,

5

6 Sterlington to Bastrop: Build New 115kV Line The 115kV line from Sterlington to Bastrop in north Louisiana is 11 miles long. The distance from N. Bastrop to the Sterlington to N. Crossett line is 6 Miles and the distance from N. Bastrop to the tap is 4 Miles. Contingency: Loss of the Sterlington to Bastrop 115kV line will result in 82% to 89% voltage levels from Bastrop to Oakgrove to Darnell. The loss of the Sterlington to IPCO results in voltage collapse in the area. The 115kV line from Sterlington to IPCO cannot be opened most of the year. Recommended Solution: Build a new 115 kV line with 1,272MCM ACSR conductor from Sterlington to Bastrop OR bring the Sterlington to Crossett North 115kV line into N. Bastrop (in & out) and eliminate the 115kV N Bastrop tap by bringing the Bastrop to Log Cabin line into N. Bastrop with another In & Out. Estimated Cost: $8,000,

7

8 IPCO BASTROP NORTH BASTROP LOG CABINGALLION STERLINGTON

9 IPCO BASTROP NORTH BASTROP LOG CABINGALLION STERLINGTON

10 Danville to Hodge: Build New 115kV Line The 115kV line from Danville to Hodge in north Louisiana is 4.2 miles long. Contingency: The loss of the Danville to Hodge 115kV line causes low voltages (91% to 79%) from Hodge to Sailes. 43 miles from Hodge to Ringgold. Recommended Solution: Build a new 115 kV line with 1,272MCM ACSR conductor from Danville to Hodge. This will relieve all overloads and low voltages. Estimated Cost: $2,000,

11

12 Winfield-Standard: Upgrade Line (2007 ISD) Danville-Hodge ( ISD) Carryover Vienna-Bernice: Upgrade line (2007 ISD) Sterlington-Bastrop: Build line Carryover ( ISD) ELI-North Transmission Reliability Projects Walnut Grove-Lampkin-Monroe Upgrade line capacity ISD

13 Walnut Grove to Lampkin to Monroe 115kV Line: Upgrade line capacity The 115kV line from Walnut Grove to Lampkin to Monroe in north Louisiana is 15 miles long. This is one of the 115kV lines serving the Monroe Area. Contingency: The single contingency loss of 6 different 115kV lines will overload Walnut Grove to Lampkin from 4% to 24% in The Lampkin to Monroe 115kV Line will overload by 4% to 11% in 2007 for 6 different single contingencies. Recommended Solution: Upgrade the capacity of the Walnut Grove to Lampkin 115kV line by June 2005 and the Lampkin to Monroe 115kV line by June The line should be upgraded to 2000 Amps. Estimated Cost: $6,000,

14

15 Winnfield to Standard 115kV Line: Upgrade line capacity The 115kV line from Winnfield to Standard in north Louisiana is 25 miles long. Contingency: The loss of the Jena to Beaver Creek 115kV line or the loss of the Beaver Creek autotransformer will cause the Winnfield to Standard to overload by 17%. Recommended Solution: Upgrade the Winnfield to Standard 115kV line by rebuilding the line with 1,272MCM ACSR conductor. Estimated Cost: $8,000,

16

17 Vienna to Bernice 115kV Line: Upgrade line capacity The 115kV line from Vienna to Bernice in north Louisiana is 17 miles long. Contingency: The loss of the Wyatt to Parnell 115kV line in Arkansas will cause the Vienna to Bernice Line to overload by 15%. Recommended Solution: Upgrade the Vienna to Bernice 115kV line by rebuilding the line with 1272MCM ACSR conductor. Estimated Cost: $6,000,

18

19 Winfield to Danville Build New 230kV Line New Source for Redgum Area 2008 ELI-North Transmission Reliability Target Areas Monroe Area: Improvement Plan

20

21