Tracking Calorimetery Particle Identification WBS 1.5.2 DETECTORS.

Slides:



Advertisements
Similar presentations
Meets DOT 106 & SAE J1402 Meets DOT 106 & SAE J1402 Both Ends Swivel After Installation Both Ends Swivel After Installation Factory or Field Assembly Factory.
Advertisements

Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Spark Plugs Topics covered in this presentation: Spark Plug Construction Spark Plug Reach, Seating and Heat Range Spark Plug Servicing.
Materials Feasibility for Laser Processing CO2 Laser(10.6 µm): Materials Feasibility 1. Organic Materials: Polymers (Plastics), Wood Based Products 2.
AUTOMOTIVE ENGINES COMPONENTS DESIGN Unit - 1. Mention classification of engineering materials. The engineering materials are mainly classified as metals.
AnDY at IP2 Infrastructure Requirements & Experimental Construction 1Charles Folz, BNL.
Harvard PCM (Plate Cleaning Machine) Robert J. Simcoe (Bob) Ed Los Jonathan Grindlay.
TOUGHENED GLASS FIBER REINFORCED BODY TOUGHENED GLASS FIBER REINFORCED BODY ONE PIECE BODY FOR OPTIMUM INTEGRITY ONE PIECE BODY FOR OPTIMUM INTEGRITY STANDARD.
Spheres and Cylinders Volume. A sphere is made out of clay and is placed in a cylinder. The diameter of the sphere is the same as the height and diameter.
OPERA AUDIO NEW ANALOG PRODUCTS ■ A multi-pivot static balance system ■ 230mm (9″) effective length ■ 16mm overhang & 23.5°offset ■ Stainless.
Expansion and Contraction
Cylinders or Space Frames ? David Hitlin September 16, 2005.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Effects of Thermal Energy Name: ________________ Class: _________________ Index: ________________.
SEALS Seals protect critical components by excluding contaminants or by retaining fluids inside the housing of a machine Seals are an important part of.
YPPC’s Metallic MAG. DRIVE Process Pumps Product Overview.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Rectangular Prisms and Cylinders
Gaskets & Seals Nizwa College of Technology.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Engineering Materials Manufacturing Mr. O’Rourke.
Traditional Fixtures & Fittings 1 J. Byrne Fixtures & Fittings J. Byrne
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Progress Report. What we’ve done so far… A fluid dynamics model to calculate leakage A method to set pass/fail limits for roughness A Quality Control.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
2 October 17 th, AACHEN. Double Chooz collaboration meeting. CIEMAT.
Introduction Why there must be a gap between two rail bars (rail way track)?
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
007 (M1,M2,M3) ½”-2” 007 (M1,M2,M3) ½”-2”. Modification Overview- 007  007 ¾-1” ( ) 1½ -2” ( ) ½” (1993-Current)  007M1 ¾-1” ( )
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Metals. Ferrous metals – contain iron Non-ferrous – contain no iron Alloys – a mixture of two or more metals.
AMP 101 Product Line 320 Series Vertical Sump.
P. Sutcliffe Liverpool University
1. Black Board / Slate  2. Time Table 3. Boxing Ring 4. Needle 5. Pepper
YPPC’s Metallic MAG. DRIVE Process Pumps Product Overview.
Roller/rail - System for PANDA
Reverse Engineering Air Regulator By: Sean Paras and Lloyd Evans.
HCAL preliminary analysis and results
SiD Solenoid Status and Plans
- chambers & absorbers -
SiD Engineering Status Report
Types of Resistance Strain Gauge
Pixel CO2 Cooling Status
Stainless Steel Water Well Casing.
Manufacturing lesson 3 Materials
What are the Metric Measures of Volume?
Traditional Fixtures & Fittings
Rail fixtures & fastening
Conductors & Insulators
STEEL PLATES.
Inner DET. Integration Inner detector envelope Radial clearances.
1) Defining Volume 2) Volume = lwh 3) Volume = Bh
Electricity 2 types of electricity
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Tracking Calorimetery Particle Identification WBS DETECTORS

Space Issues CDR has 5cm gaps: Move BCAL out 3cm 2cm 8cm NEW Curtis Meyer, 20 May’2004

36/48 Modules of B.C Design 1. 1.This Design incorporates two Carbon- fiber cylinders of 0.5 cm thk 2.The CDC is enclosed in a Carbon_fiber cylinder running all along the length of 2m 3.The second cylinder is 4m long supporting the rails for CDC & FDC 4.Two rails are positioned at 4 O’clock and 7 O’clock positions

0.65 ~ 0.85 DETAILS OF THE RAILS AND SPACING

1. Casing & Track rail: Non-magnetic stainless 2. Steel Balls: Silicon nitride ceramics 3. Under seal: Nitrile rubber without metal part 4. End plate: 316 stainless steel 5. Ball retaining band: 304 stainless steel 6. End seal: 316 SS. 7. Screw: XM7 stainless steel 8. Grease fitting: Brass 9. Grease: Shell Alvania EP2 2 LWH20 series rails from IKO LOAD RATING Static : 4.52 KN Dynamic: 4.10 KN