Submission doc.: IEEE /0849r2 Slide WG Editor’s Meeting (July ‘11) Date: Authors: Peter Ecclesine (Cisco Systems) July 2011
Submission doc.: IEEE /0849r2 Slide 2 Volunteer Editor Contacts TGs – Kazuyuki Sakoda – TGmb – Adrian Stephens – TGaa – Alex Ashley – TGac – Robert Stacey – TGad – Carlos Cordeiro – TGae – Henry Ptasinski – TGaf – Peter Ecclesine – TGah – Minyoung Park – TGai – Tom Siep – Editors Emeritus: –TGk – Joe Kwak– –TGp – Wayne Fisher – –TGr – Bill Marshall – –TGu – Necati Canpolat – –TGv – Emily Qi – –TGw – Nancy Cam-Winget – –TGz – Menzo Wentink – Peter Ecclesine (Cisco Systems) July 2011
Submission doc.: IEEE /0849r2 Slide 3 ANA Announcements Current ANA announced to group is r6. (2011 Jul 12) –See –All new requests received by end of meeting will be uploaded and announced via WG reflector Procedure for ANA is contained in 07/0827r0. –See Editorial Guidance –ANA assignments should be done before the time of moving from WG LB to Sponsor ballot. –If a resource number is not in the ANA Database, please use in drafts! –Editors to replace any ANA controlled resources numbers with upon incorporation of material into drafts. –Editors need to check the ANA database to determine which resources are controlled and ensure that values are requested from the ANA. Peter Ecclesine (Cisco Systems) July 2011
Submission doc.: IEEE /0849r2 Editor’s discussion of MDR In May, we discussed holding draft reviews in preparation for requesting approval from the Sponsor 11-11/615r0 WG 11 MEC Process, 11-09/1034r Style Guide, 11-09/533r1 ARC Recommendation re MIB Attribute Types & Usage, and P802.11REVmb Draft 8.0 Annex C.2 Guidelines for MIB authors and editors In July, after having performed the review of 11ae, 11aa and 11ad drafts, and refined the review and reporting process, –See 11-11/872 TGaa, 11-11/873 TGae and 11-11/874 TGad MEC Reports The editors strawpolled of the draft review process –July 18 PM2 Editor’s meeting reviewed 11-11/615r3 Procedure, and a strawpoll approved the procedures therein Some editorial errors were noted and resolved in 11-11/615r4 WG MEC Procedures. –We expect the process to be renamed the WG Mandatory Draft Review Process. July 2011 Peter Ecclesine (Cisco Systems)Slide 4
Submission doc.: IEEE /0849r Style Guide See wg11-style-guide.doc Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts. Submissions with draft text should conform to both the WG11 Style Guide and IEEE Standards Style Manual Slide 5Peter Ecclesine (Cisco Systems) July 2011
Submission doc.: IEEE /0849r2 Slide 6 Editor Amendment Ordering Amendment NumberTask GroupREVCOM Date Amendment 8TGvFeb Amendment 9TGuFeb Amendment 10TGsSept Revision802.11mbMar 2012*est Amendment 1TGaeJun Amendment 2TGaaJun Amendment 3TGadDec Amendment 4TGafSep Amendment 5TGacDec Amendment 6TGahJuly Amendment 7TGaiSept 2013 Data as of July 2011 See Amendment numbering is editorial! No need to make ballot comments on these dynamic numbers! Peter Ecclesine (Cisco Systems) July 2011
Submission doc.: IEEE /0849r2 Most current doc shaded green. TGPublished or Draft Baseline Documents SourceMEC Style GuideEditor Snapshot Date Publi shed smbaeaaadafacahai sY12.0Frame 8.0Yes2009Kazuyuki Sakoda19-Jul mbY9.1Frame 9.0Yes2009Adrian Stephens19-Jul aeY OpenOffic e 3.2 Yes2009Henry Ptasinski19-Jul aaY WordYes2009Alex Ashley19-Jul adY WordYes2009Carlos Cordero19-Jul afY Frame 9.0No2009Peter Ecclesine19-Jul acY Frame 9.0No2009Robert Stacey19-Jul ahMinyoung Park aiTom Siep Changes from last report shown in red. Slide 7 July 2011 Draft Development Snapshot Slide 7Peter Ecclesine (Cisco Systems) July 2011