1 OCIO Kickoff Production Release Solution Acceptance Retirement Sales, AgreementPlanning, Execution, TestingDeployment, PilotProduction Support 234 Signed.

Slides:



Advertisements
Similar presentations
QuEdge Testing Process Delivering Global Solutions.
Advertisements

Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
ITIL: Service Transition
Chapter 3 Project Initiation
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
GAI Proprietary Information
SDLC Nilesh Gangrade Feb 26th, Agenda Project Vs Product Vs Process Project Vs Product Vs Process Project Engagements Project Engagements Client.
Software Process and Problem Statements CSSE 371, Software Requirements and Specification Mark Ardis, Rose-Hulman Institute September 3, 2004.
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Introduction to Requirements (Chapters 1-3 of the requirements text) CSSE 371, Software Requirements and Specification Don Bagert, Rose-Hulman Institute.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Requirements - Why What and How? Sriram Mohan. Outline Why ? What ? How ?
Software Project Transition Planning
Lifecycle Phases time InceptionElaborationConstruction Transition  Define the scope of the project and develop business case  Inception Define the scope.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Information Systems Development – The System Approach 1. “System.
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 SOFTWARE LIFE-CYCLES Elements and Definitions. 2 Requirements System Design Detailed Design Implementation Installation & Testing Maintenance The WATERFALL.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Software Engineering Institute Capability Maturity Model (CMM)
Unified Software Practices v 5.0-D Copyright  1998 Rational Software, all rights reserved 1 /26 RUP Architecture.
Web Development Process Description
1 Software Process Lecture Outline Nature of software projects Engineering approaches Software process A process step Characteristics of a good.
RUP Fundamentals - Instructor Notes
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
© Blackboard, Inc. All rights reserved. Back to the Feature: An Agile, User-centric Software Development Lifecycle Cindy Barry Senior Product Manager Martha.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Software Testing Life Cycle
Taiwan APT OSM Estimation & Planning
Creating a Practical IPv6 Transition Plan Jeff Doyle President Jeff Doyle and Associates, Inc. Global IPv6 Summit in China April, 2008.
Kick-off Meeting Kick-off Meeting Presented By:.  Project/s overview and Scope  Project Organization Structure  Client Overview  Project Profitability.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
PROJECT & QUALITY MANAGEMENT 90 EXTREME (PQ90X) Presented by: Sophia Layne, MBA, PMP, ITIL-F President/Owner Quality Works, LLC.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Software Quality Assurance
Project Presentation eProcurement System. M.TECH S16- Team S03 Institute of Systems Science Table of Content Project Background Project Requirement User.
VirtuCo :: Process description ::. :: Reference ::
Fifth Lecture Hour 9:30 – 10:20 am, September 9, 2001 Framework for a Software Management Process – Life Cycle Phases (Part II, Chapter 5 of Royce’ book)
REQUIREMENTS - WHY WHAT AND HOW? Steve Chenoweth & Chandan Rupakheti CSSE 371 Chapters Requirements Text. Question 6.
The Traditional System Development Life Cycle There are a number of important steps in the creation of a system, regardless of which approach you use.
AS-IS Process = 335TO-BE Processes = 194 Document work Validate work Integrated work testing Execute work Release work Integrate and schedule work Plan.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
Module 1: Introducing Windows Server 2003 Network Infrastructure Planning, Tools, and Documentation.
Petals SAP Point Of Sale System Second Project Presentation M.Tech Team SE 15 (Saturday) Team Aug-2008.
Test Manager’s Role Best Practice By Gabriel Rodriguez.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
Product development Engineering & Regulatory Raj Agrawal InnAccel.
“Provide best value for customer agencies and taxpayers” 1 Software Asset Management Fred Allen - SAM Program Manager General Services Administration Interagency.
Chapter 8: Iteration 1 - Basics.  We review here the requirements for first iteration of our case studies. They are a subset of the requirements as described.
Unified Software Practices v 5.0 Copyright  1998 Rational Software, all rights reserved 1 R Rational Unified Process  “de facto standard”, framework.
Homework #1a Lifecycle Paper For each stage of the life cycle provide a list of items you think should be there. There should be at a minimum of five items.
SUNY PACS - Environnent Management Regroup 2/10/2016.
Unified Software Practices v 5.0-D Copyright  1998 Rational Software, all rights reserved 1 /26 Rational Unified Process – Part 2 Original slides modified.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Dash Project Managament Framework Project Control Method 1 Robert Wiecko,
Microsoft.NET Overview Introduction to.NET Microsoft Readiness Framework Microsoft Solutions Framework Microsoft Operations Framework Frameworks Summary.
Certified Software Tester How To Build a Testing Project, Part 1.
ITIL: Service Transition
WORK BREAKDOWN STRUCTURE
JTAMS PRE-MILESTONE B ANALYSIS
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Rational Unified Process
Technology Maturation & Manufacturing Development Phase
Executive Project Kickoff
Presentation transcript:

1 OCIO Kickoff Production Release Solution Acceptance Retirement Sales, AgreementPlanning, Execution, TestingDeployment, PilotProduction Support 234 Signed Project Plan Client: Major milestones Partner: System Diagrams Partner: High-level Schedule Estimate + BoE Charge code(s) [Requirements Specification Document] Project POC List [List of JVP artifacts] Project Mgmt. Plan (PMP) Project Schedule NTIS System Diagrams NTIS Equipment & S/W List C&A Package [Acceptance Criteria] [Test Plan (all-inclusive term)] [End of Test Completion Report] Issue Log Responsibility Matrix [JVP Processes, Workflow, etc.] [JVP Artifacts] PIA 508 OCIO Risk Mgmt. Plan Config. Mgmt. Plan PMIS (Project Server) PMP (updated) Project Schedule (updated) NTIS Diagrams (updated) Physical Configuration Report Open POA&M List Production Acceptance Criteria [Pilot Test Plan] [End of Test Completion Report] Issue Log (updated) Operational Support Plan Initial Operational Capability (clnt.) Project Portfolio update NTIS New Solution Life Cycle v03       Phase I: Initiation Phase II: Solution Development Phase III: Solution Deployment Phase IV: Operations and Maintenance

Notes  Life cycle phases  Stages  Milestones  Phase artifacts  External items  Overarching artifacts and processes

ArtifactOwner/CreatorDependenciesNotes Project Plan Estimate + BoE Charge code(s) Major milestones Sketches, diagrams Requirements Specification Document [Technical POC List] [List of JVP artifacts] OFS PMO OFS/Accounting OFS Project Schedule Logical, Architecture Diagrams NTIS Equipment & S/W List C&A Package Acceptance Criteria Test Plan (all-inclusive term) End of Test Completion Report Issue Log Responsibility Matrix [JVP Artifacts]