Prof Ralph V. Locurcio, PE CON 2001 CVE 4070. Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

WBS-Construction of House (Example) WBS Dictionary
Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Sustainable Residential Design Project Project 9 DS413: Design Studio 413 May 9, 2012.
A Duplex Conversion the First Time Sandra Shuffler Change Manager, Investor, Mom.
WOOD LIGHT FRAME CONSTRUCTION
PM – TECHNICAL ANALYSIS WORK BREAKDOWN STRUCTURE PRESENTED BY: RASHMI TAK PGDM 09/40.
Project Management Requirements Prof. Ralph V. Locurcio, PE.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
EGR Defining the Project Step 1:Define the project scope Step 2:Establishing project priorities Step 3:Create the work breakdown structure Step.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Civil Engineering & Architecture 2.3 Residential Design.
CONSTRUCTION SCHEDULING. steps to effective time management Examine the Contract List Major Contractual Obligations Divide Project into Major Work Areas.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Assignment Problems Variation of transportation problems. One-to-one assignment. Workforce assignments, machine assignments, etc. (go to example)
7 Set of Floor Plans Primary Considerations
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
Single Family Homes in the Shenandoah Valley Va, Florence Ave Waynesboro, Class Sq.Ft. Zip 244.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Practice House 1. Make a rectangular foundation 2. Put an interior wall in the middle. 3. Add an exterior door, interior door and at least one window on.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Finishing the Building
Construction Drawing Occupational Safety and Fundamentals
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Space Planning Chapter 7 and 16.
Chapter 12 Network Scheduling Techniques. Scheduling Techniques Gantt or bar charts Gantt or bar charts Milestone charts Milestone charts Line Balancing.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
CON 2001 Construction Methods Tool #1 - Construction Scheduling Presented by Elia Twigg, P.E. (Prof. Ralph V. Locurcio, P.E.)
IET 120 CONSTRUCTION PROJECT Name: Jesse Webb-Greenhill.
High Efficiency Home with full Warehouse/Guesthouse and Cabana House By: Sutton Yanosky.
Project Management Planning Techniques
CVE 4070 Construction Engineering Project Organization Test #1 review Prof. Ralph V. Locurcio, PE.
CON 2001 & CVE 4070 Construction Engineering Tool #1 - Construction Scheduling Prof. Ralph V. Locurcio, PE.
Home looks better with us. Not staged Staged Start your home selling or remodeling project with a few questions…... Why do you think your house is not.
Building Your Future with Mountain Peak Homes Corinne T. Moritz Bella Vista Subdivision, Mountain Peak Homes1.
Scheduling and Budgeting Engineers Without Frontiers CEE 402.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
CEE 578 Senior Capstone Design Types of Construction Drawings
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
BUILDING A BETTER ESSAY: BLUEPRINT TO HOUSEWARMING.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Foundations of Technology Construction
UNIT II Scheduling Procedures & Techniques FLOAT
Major Steps In Building a SFR
Construction Documents
WBS-Construction of House (Example) WBS Dictionary
Planning and Scheduling a SIMPLIFIED Construction Project
Project Name – ID # 7/1/2009 Current Project Status Project Issues
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Gantt Chart.
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
R Single-Family Home Repair Exemption
INTRODUCTION WORK BREAKDOWN STRUCTURE
Construction Engineering Change Order - 2 Prof. Ralph V. Locurcio, PE
House Construction Budget Plan
Foundations of Technology Construction
In-Class Scheduling Exercise
Presentation transcript:

Prof Ralph V. Locurcio, PE CON 2001 CVE 4070

Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits 1 3 Site Work 3 4 Pour Foundation 19 5 Pour floor slab 8 6 Framing or masonry for walls 22 7 Construct roof & dry in 16 8 Complete exterior finishes 15 9 Rough-in plumbing & electrical& tel Rough-in HVAC 4 11 Install insulation 4 12 Install drywall 5 13 Paint and wallpaper interior Install kitchen & cabinets & trim 5 15 Install plumbing fixtures 4 16 Install electrical fixtures 4 17 Install HVAC equipment 3 18 Install carpet, tile and appliances 6 19 Install landscaping 3 20 Install driveway 2 21 Final inspection for CO 1 22 Make final repairs 2 23 Cleanup for occupancy 1 Total 173 Actual 140

WBS for Senior Design Activity or Task Assigned PlannedActualPlannedActualFloat%Done person) Start Finish LagComp Phase-1 (5%) General Conditions Engineer Aug 3-Sep 0 Apply for Permits Engineer-2123-Aug 29-Aug -5 Phase-2 (15%) Site Work 3 Pour Foundation 19 Pour floor slab 8 Framing or masonry for walls 22 Construct roof & dry in 16 Phase-3 (50%) Complete exterior finishes 15 Rough-in plumbing & electrical& tel 14 Rough-in HVAC 4 Install insulation 4 Install drywall 5 Phase-4 (95%) Paint and wallpaper interior 10 Install kitchen & cabinets & trim 5 Install plumbing fixtures 4 Install electrical fixtures 4 Install HVAC equipment 3 Install carpet, tile and appliances 6 Phase-5 (100%) Install landscaping 3 Install driveway 2 Final inspection for CO 1 Make final repairs 2 Cleanup for occupancy 1

Note: The following items are required for full credit: 1. Schedule must use MS Project 2. Use Septemnber 1 as your starting date for the construction 3. Calculate start & finish dates based on your flow chart & Sept 1 start 4. Schedule must be on one page; landscape format 5. Be sure to arrange the tasks in "logical" construction order 6. Must use task sequencing & overlap per your Flow Diagram 7. Add lead or lag to separate or overlap a task or sequence of tasks 8. All activities must be labeled with activity names to the right of the bar 9. All activities must show % complete to left of bar 10. Show % complete in the activity bar for all tasks 11. All activities must be completed in less than 173 days 12. All activity bars must be colored blue & use cross hatch pattern 13. Include the 3 "phase" activities with black bars as: (1) Planning (2) Foundation & Site (3) Vertical (4) Exterior & Finish 14. Include a title & your name in the heading