1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
Mid-America Regulatory Conference Warner Baxter June 9, 2010.
Jim Larranaga Men’s Basketball Head Coach, AP National Coach of the Year University of Miami Our Formula for Success: The Miami Way.
1 OPSI Raleigh, NC Gas Market & Electric Integration John Lawhorn, Senior Director Policy & Economic Studies October. 8, 2013.
Queue Reform at the Midwest ISO NARUC February, 2008.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
Citizens League Electrical Energy: Affordability and Competitive Pricing Working Team Electric Transmission.
Minnesota’s Better Energy Future Mike Bull, Assistant Commissioner, Renewable Energy The Next Generation Energy Initiative.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Plug-In Electric Vehicles… What has to happen on the other side of the outlet? MARC Conf. Session 4 – Electric Cars: Can we charge our way to a carbon-free.
Wind Power Development In South Dakota E-Week Presentation Rapid City, SD February 19, 2008.
The Continuing Evolution of U.S. Electricity Markets
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Eastern Wind Integration and Transmission Study
The Transmission Imperative November 3, 2011 Jay Caspary.
EnergyForward Fleet Transition 2014 AAPT Summer Meeting July 28, 2014 Minnesota Power David J. McMillan, Executive Vice President.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
The Council of State Governments Eastern Regional Conference Gordon van Welie, President and CEO, ISO New England August 16, 2010 Portland, Maine.
BUILDING THE NEXT ERA OF CLEAN ENERGY 2010 Mid-America Regulatory Conference - Integrating Renewables to the Grid F. Allen Wiley Vice President, Business.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
Why Should Retail Customers Care About the MISO Market? WIEG Board Meeting November 8, 2007 WIEG Board Meeting November 8, 2007 Submitted by: Kavita Maini,
Updated 1/28/2011.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
2015 Mace Advocacy alliance policy conference
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Monterey Plaza Hotel October 8-10, 2007
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Steve Bossart, Moderator October, 2015 USAEE Pittsburgh North American Conference.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Integrating wind resources: siting decisions in the Midwest Julian Lamy (speaker) Ines Azevedo Paulina Jaramillo.
1 DOE Office of Electricity Delivery and Energy Reliability David Meyer – May 2005 Developing Policy Options To Enhance Security of Energy Supply for Electricity.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
ERCOT – MISO DC Tie Study Comments
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Dale Arnold Director, Energy Services Ohio Farm Bureau Federation.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
OPSI 11 th Annual Meeting Presentation FERC Order 1000 Implementation October 13,
Transmission As Enabler
Clair Moeller Mid-Continent ISO
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Creating Benefits for New England: Putting the Pieces Together
Gordon van Welie, President & Chief Executive Officer
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO

2 Midwest ISO Reliability Footprint

3 Electric System Development – Historical View Traditional Electric System Development (Generation and Transmission) –Planned at a single company level –Designed for single company use –Funded at company / state level Decision basis –Meet local requirements (i.e., load growth) –With local natural resources –Few national policy issues –Limited regional use Last major build out of baseload capacity and transmission ended in the early 1980s

4 WECC MIDWEST NORTHEAST ERCOT SOUTH Coal Nuclear Gas Hydro Wind Other The current regional generation fleets reflects the natural resources of each region – with gas being the default peaking fuel for all

5 WECC MIDWEST NORTHEAST ERCOT SOUTH Coal Nuclear Gas Hydro Wind Other … and the sources of each regions’ electrical energy reflects those generation portfolios and resources

6 …While the transmission system reflects the desire to move energy from a company’s generation to the load it serves – without a robust “backbone”

7 Xcel Energy Transmission

8

9 Midwest ISO Transmission Map

MW Load RPS 10,000 – 12,000 MW

11 Who Pays? Remember Open Access – Transmission Owners cannot discriminate & favor their own generation over another's So – the utility must open it’s transmission lines to others generation Today the developer pays for transmission from the generator to the transmission 100% Transmission upgrades needed have the developer pay 50% and the utility pay 50%

12 Midwest ISO Planning Principles reflect need to address local and regional issues Make the benefits of a competitive energy market available to customers by providing access to the lowest possible electric energy costs Provide a transmission infrastructure that safeguards local and regional reliability Support state and federal renewable energy objectives by planning for access to all such resources (e.g. wind, biomass, demand-side management) Create a mechanism to ensure investment implementation occurs in a timely manner Develop a transmission system scenario model and make it available to state and federal energy policy makers to provide context and inform the choices they face Midwest ISO Board of Director Planning Principles Fundamental Goal The development of a comprehensive expansion plan that meets both reliability and economic expansion needs

13 Midwest ISO is actively engaged in planning from local to regional level RGOS Phase I Scope: Develop transmission for mandates in IA, IL, MN, WI; GW, Completion 3 rd Q 09 Participants: MISO Stakeholders, Regulators, Governors, PJM Lead: MISO for MTEP09; UMTDI (Phase I) and MGA Who’s Watching: State Regulators, Governors Offices (UMTDI, MGA), FERC, State Transmission Authorities MTEP Scope: Develop MISO transmission; GW (20% scenario); on-going Participants: MISO Stakeholders Lead: MISO Who’s Watching: Stakeholders JCSP Scope: Develop East. Int. transmission; GW (20% scenario) Participants: MISO, PJM, SPP,TVA, MAPP, Utilities Lead: MISO for Dept of Energy Who’s Watching: Utilities, ISO's/RTO's EWITS Integration Study Scope: Operating impacts of JCSP; End of Aug 2009; GW (20% scenario) Participants: MISO, PJM, SPP,TVA, MAPP, Utilities, Enernex, Ventyx Lead: Enernex for Dept of Energy Who’s Watching: Utilities, ISO's/RTO's RGOS I MTEP & RGOS II JCSP EWITS RGOS Phase II Scope: Develop transmission for mandates in IA, IL, MN, WI; GW, Completion 3 rd Q 09 Participants: MISO Stakeholders, Regulators, Governors, PJM Lead: MISO for MTEP09; UMTDI (Phase I) and MGA Who’s Watching: State Regulators, Governors Offices (UMTDI, MGA), FERC, State Transmission Authorities RGOS = Regional Generation Outlet Study MTEP= Midwest ISO Transmission Expansion Plan JCSP = Joint Coordinated System Plan EWITS = Eastern Wind Integration and Transmission Study

14 Different policy assumptions result in very different siting outcomes with different transmission system requirements.

15 The transmission overlay for the Reference Case (Status Quo) establishes the need for some backbone development…

16 …While the 20% Wind Energy Case highlights the need for substantial transmission backbone development

17 We must effectively manage our current infrastructure while carefully planning and developing our future infrastructure 60% of the electric grid infrastructure (T/D/G) is at or near the end of original planned life 20% of T/D/G is past original planned life In the Midwest, the average age of infrastructure is very high –Baseload generation = 42 years –Transmission = 40+ years The region use of the electric system is also increasing the transmission congestion Current Infrastructure Planning must balance many issues –Use of existing generation fleet –National policy issues –Efficient use of natural resources –Demand response –Costs Construction Operating Fuel Decommissioning Environmental Regional / national use of the electric system must be considered as the planning is done Unknowns (policy and financial) challenge planning Future Infrastructure

18 Planning Activities Key Issues Congestion Renewable Policy Operational Impacts New Generation and Demand Response Changing Regulatory Requirements Fair Cost Allocation Load Growth and DSM Aging Infrastructure Key Issues