Dose Rate Reduction Methods at Shimane Nuclear Power Station Tadashi Kanaoka1, Hiroyasu Kajitani1, Tsuneo Sato1, and Naoshi Usui2 1The Chugoku Electric.

Slides:



Advertisements
Similar presentations
ANTIOXI – Advisory Board Meeting Klas Lundgren Page ANTIOXI Description of Work Packages 3 and 4 Klas Lundgren.
Advertisements

11-Apr ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
14th Annual RETS/REMP Workshop June 28-30, 2004 U.S. Nuclear Power Sister Plant Radiological Effluent Release Comparisons J.T. Harris 1,3, D.W. Miller.
1 Decontamination techniques Experience and perspectives for Russian NPP units.
City of Black Hawk Water HammerSeptember 2002 Arber Water Hammer Travis Meyer, P.E. Richard P. Arber Associates.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Application of cavitation jet technique to operating nuclear power plant September,12.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Pre-Filming Method of Reducing Metal Release from Alloy 690 for SG in Primary Water of PWR 2009 ISOE Asian ALARA Symposium Aomori September 9, 2009 Sumitomo.
1 August 30-31,2010 Kyushu Electric Power Co.,Inc. Nuclear Power Operatio n Dept. Masahiro Yoshinaga Approach for dose reduction in Sendai NPS August 30-31,2010.
Measures for containing an increase in pipes’ dose-equivalent rate in the hydrogen-injected environment at the Shimane Nuclear Power Station Unit 1 1 Tomohiro.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
Cr and Co release reduction from stainless steels in PWR and BWR 2009 ISOE Asia ALARA Symposium Aomori EPRI Radiation Protection Conference September 9,
Overview of Incident at Fukushima Daiich Nuclear Power Station (1F) (Informal personal observations) April 2011.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
CHAPTER 13.7 Exhaust Gas Re-Circulation Valve
ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4.
Submersible Level Transmitters The materials included in this compilation are for the use of Dwyer Instruments, Inc. potential customers and.
SUETOSHI Tetsui 末利 銕意 President TES Research Co. Ltd. P.E. (Chemistry & C.T. Management) : Engineer & Manager at Osaka Gas Company Researcher:
Measures for Reduction of Radiation Exposure at Higashidori Nuclear Power Station Nuclear Power Dept. Tohoku Electric Power Co.
ALARA Activities at Ohi NPP Ohi Nuclear Power Plant Kansai Electric Power Co., Inc.
1 OCCUPATIONAL EXPOSURE at JAPANESE NUCLEAR POWER PLANTS in 2005 October 12, 2006 Shigeyuki Wada Safety Information Division Japan Nuclear Energy Safety.
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
© Hitachi-GE Nuclear Energy, Ltd All rights reserved. コピーライトの表示については、作成元で責任を持って適宜変更してください。 ⇒ 2010 ISOE Asia ALARA Symposium Hitachi- GE Nuclear.
ISOE ・ ATC 2006 ALARA Symposium 1 Approach of Hitachi for Dose Rate Reduction October 12, 2006 Hitachi, Ltd.
1 TEPCO’s ALARA Program (Basic Policy of Mid- and Long- Term Exposure Reduction) Toshiyuki HAYASHIDA Tokyo Electric Power Company Radiation Protection.
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
0 Zinc Injection from Hot Functional Test in Tomari Unit 3 Nov MITSUBISHI HEAVY INDUSTRIES, LTD. HOKKAIDO ELECTRIC POWER CO., INC.
PSN CDCC Rev2 Copyright 2009, Toshiba Corporation. 1 Precise control of Fe concentration in feedwater for Co-60 concentration reduction.
HYDRO POWER PLANT
1 Introduction of Research and Development Project Evaluation System at NEDO Momoko OKADA New Energy and Industrial Technology Development Organization(NEDO)
Summary Report of the EPRI Standard Radiation Monitoring Program
MHI PROPRIETARY : CLASS B All Rights Reserved, Copyright (C), MITSUBISHI HEAVY INDUSTRIES,LTD. NO.1 Tungsten balls charge method radiation shield system.
Scott Cameron Manager Radiation Protection 2008 International ALARA Symposium ALARA Performance at OPG.
1 Dose reduction actions in Tsuruga-2 NPP Hiroshi WADA, Yuuichi HAMANAKA, Masayuki FUKUDA Tomomi YOSHINAGA, Eiji SANEHIRA,Masahiro YANO, Yasuo UNI, Kazushige.
1 TEPCO’s Challenges for Occupational Exposure Reduction -Installation of Additional CF in Fukushima Daiichi NPP- Shunsuke HORI, Akira SUZUKI Tokyo Electric.
Table of Contents  General Description  Concept of RX Vessel and Location of Defect  Radiation Dose Control  Repair Schedule of Bottom Header Defected.
ISOE/ATC ALARA Symposium 2006 The Japan Atomic Power Company 1 Progress of the Zinc Injection in Tsuruga NPP Unit 2 October 12, 2006 THE JAPAN ATOMIC POWER.
Infinite is Enhancement of the functions of the Japan Atomic Energy Agency Library’s Fukushima Nuclear Accident Archive using a novel data flagging system.
Copyright © 2011 by Oxford University Press, Inc. Energy and the Environment James A. Fay / Dan S. Golomb FIGURE 10.6 Modeled versus observed O 3 concentrations.
Improvement of TEPCO’s ALARA Process Shiro TAKAHIRA Tokyo Electric Power Company Radiation Protection Group ISOE-ATC Symposium October 12, 2006, Yuzawa,
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Copyright 2008, Toshiba Corporation. CDCC PSN ISOE International ALARA Symposium, Tsuruga Japan,13-14 Nov., Reduction.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
All Rights Reserved. Copyright © 2008, Hitachi-GE Nuclear Energy, Ltd. 1-0 ※ この資料の複写、第 3 者への公開を固く禁じます。 All Rights Reserved. Copyright © 2009, Hitachi-GE.
adiation safety management practices in 19th preventative maintenance of Kori unit 4 and future plans.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
1 ALARA at the Borssele nuclear power plant. 2 ALARA at the Borssele P Borssele  NPP Borssele  In the delta in the Southwest of the Netherlands  KWU.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Occupational Radiation Protection at Swedish Nuclear Power Plants: Views on Present Status and Future Challenges Ingemar Lund et al. Department of Occupational.
Zapata, N. (*), Castillo, R. and Playán, E. 1IRRIGATION AND ENERGY COLLECTIVE IRRIGATION NETWORK DESIGN AND MANAGEMENT FOR ENERGY OPTIMIZATION: THE “CINTEGRAL”
Reduction of the collective doses in Almaraz Nuclear Power Plant through source term reduction and the work load reduction.
ISOE Asian Technical Center 2005ALARA Mini-Workshop Fugen Nuclear Power Station, JAEA- 1 Demonstration of Zinc Injection Technique in Fugen Nuclear Power.
Contents Regulatory Position and Utilities’ Action
1 Activitiesfor Dose Reduction Hamaoka Nuclear Power Station Chubu Electric Power Co.,Inc. November 2005.
Commonality Initiatives in US Nuclear Power Plants to Improve Radiation Protection Culture & Efficiency W. David Wood Director, Environmental & RP American.
Slide 1 3rd EC/IAEA/ISOE Workshop on ”Occupational Exposure Management in Nuclear Power Plants” Fuel decontamination at Ringhals 1 with the new decontamination.
Hokuriku Electric Power Company Dose Reduction Measures at Shika Nuclear Power Station Unit-1 Takahashi Toshihiko Hokuriku Electric Power Company.
Control of occupational exposure when working within a reactor containment building at power Matthew Lunn British Energy Generation Ltd. Sizewell B Power.
28-Jan ISOE International ALARA Symposium JNES, Tokyo, JAPAN, August,2013 Presentation on: Dose Reduction and Management during Overhauling.
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
ALARA Activities at Ohi NPP
ALARA Programs & Occupational Dose Trend in Wolsong NPP
The Success of the ALARA Principle – the View of an Inspector
Date of download: 11/2/2017 Copyright © ASME. All rights reserved.
Richard L. Doty PPL Susquehanna, LLC
FEE INCREASES Public Work Shop June 2, 2018.
Chapter 11 Principles of Experimental Design.
Presenter: Chuck Marks
2019/7/9 Application of cavitation jet technique to operating nuclear power plant MITSUBISHI HEAVY INDUSTRIES, LTD.  Hironori Onitsuka KORYO ENGINEERING.
Presentation transcript:

Dose Rate Reduction Methods at Shimane Nuclear Power Station Tadashi Kanaoka1, Hiroyasu Kajitani1, Tsuneo Sato1, and Naoshi Usui2 1The Chugoku Electric Power Company, INC 2Hitachi-GE Nuclear Energy, Ltd

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 2 0.The location of Shimane NPS and Head office Shimane NPS Head offie

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 3 1.Introduction Shimane Nuclear Power Station Unit 1 continues operating smoothly since commercial operation started in An increasing trend of the dose rate has been observed since the hydrogen injection was applied at 21st operating cycle (1998) and the dose reduction became the urgent problem. unit 1 unit 2

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 4 2(1).Radiation exposure of the outage Figure 1Radiation exposure at Shimane Nuclear Power Station Unit 1 after hydrogen injection Highest level among the total radiation exposure of the outage works in recent Japanese BWR plants.

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 5 2(2).The dose rate of the PLR piping Figure 2PLR dose rate trend at Unit 1 Atmospheric dose rate in the pressure containment vessel are increasing since the hydrogen injection start

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 6 3.Dose rate reduction committee 3WG were settled under the committee. Maintenance staff and headquarter persons were added to the committee. Superintendent (Station) Dose rate reduction committee Chief examiner:Deputy Superintendent Managers of each section of station Managers of headquarter Chemistry control WG Equipment management WG Radiation control WG Headquarter staff General Manager(Nuclear dept.) Report Technical support Hitachi-GE Nuclear Energy Figure 3Structure of dose rate reduction committee

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 7 4.Examination items of dose rate reduction committee Short term target is to lessen the dose rate of 28th outage at Unit 1. Middle and long term items aim for permanent dose rate reduction. Item Chemistry control WG Equipment management WG Radiation control WG Objective s Dose rate reduction in PCV Improvement of work methods and work environment Improvement of radiation control Matters NWC pre-oxidation operation, CF bypass operation, Hi-F Coat, etc Enlargement of chemical decontamination area,etc Piping dose rate prediction method, Temporary shielding, Survey of good practice, etc Extension to middle and long term Figure 4Examination items at dose rate reduction committee Middle and long term matters Zinc injection, Improvement of water chemistry control, etc Adjustment of execution timing of inspection to reduce dose rate Chemical decontamination to Valve and PLR-pump impeller, etc Establishment of piping dose rate prediction method Improvement of mounting method of temporary shielding,etc

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 8 5(1).Applied countermeasures until 28th outage Hi-F Coat was applied after chemical decontamination at the 27th outage. NWC pre-oxidation operation of 90 days was conducted at the beginning of the 28th operating cycle to form a fine oxide structure under NWC conditions. Pump Cooler Ion exchange column Catalyst column Chemical injection system Filter Surge tank ( with heater ) Pump Target ( PLR piping etc. ) Figure 5 Outline of Hi-F Coat treatment equipments

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 9 5(2).Results of countermeasures(1) dose rate Figure 6-1 PLR dose rate trend at Unit 1 The PLR dose rate has decreased to the same level before beginning of HWC.

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 10 5(2).Results of countermeasures(2) dose rate Figure 6-2 Dose rate change of PLR piping after the 27th outage Dose rate of PLR piping was about 0.5 mSv/h at the 28th outage at Unit 1 and became much lower than that at the 27th outage

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved. 11 5(2).Results of countermeasures(3) total radiation exposure Figure 7Trend of total radiation exposure during the 28th outage (Outage works) Total radiation exposure could be suppressed to about 70% of the planned value. Term of the outage could be cut for about 40 days compared to the original plan

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved Future activities(1) On-line monitor Experimental equipments to gather basic data such as energy distribution of gamma ray and atmospheric dose rate in the PCV. Figure 8 Appearance of experimental equipments

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved Future activities(2) Zinc injection Zinc injection is a permanent countermeasure to reduce dose rate to meet the company need to continue hydrogen injection. DZO FW pump FW piping Figure 9 Image of zinc injection system

Copyright© The Chugoku Electric Power Co.,Inc. All rights reserved Conclusion ■We have decreased the dose to the same level before beginning of HWC. ■We will evaluate the contribution and durability of Hi-F Coat etc.. ■We will research the Zinc injection etc. as further countermeasures.