Research Operations Update S. P. Gerhardt J. Hosea, R. Ellis, R. Kaita, L. Roquemore and the NSTX Research Team NSTX-U Team Meeting B318 5/7/2013 NSTX-U.

Slides:



Advertisements
Similar presentations
NSTX-U Collaboration Status and Plans for: University of California at Davis N.C. Luhmann, Jr., R. Barchfeld, C.W. Domier, C.M. Muscatello, M. Sohrabi.
Advertisements

Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
V. A. SOUKHANOVSKII, NSTX-U FACILITY ENHANCEMENT BRAINSTORMING, 7 February 2012 Proposed Facility Enhancements for NSTX Upgrade V. A. Soukhanovskii for.
Fast-Ion-D-Alpha and Solid-State NPA Diagnostics for NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U Team Meeting Stefan Gerhardt Contributions from B. Stratton, R. Kaita, A. Diallo, and J. Hosea and the NSTX Research Team August 2014 Team Meeting.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX-U Collaboration Status and Plans for: ORNL Boundary Physics and RF Research J.M. Canik, J.B.O. Caughman, J.-W. Ahn, S.J. Diem, T.K. Gray, D.L. Green,
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
XP1518: RWM PID control optimization based on theory and experiment S. A. Sabbagh, J.W. Berkery, J.M Bialek Y.S. Park, (et al…) Department of Applied Physics,
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Diagnostics B. Stratton and the NSTX Research Team Operations/Diagnostics + XMP/XP Status Meeting PPPL January 28, 2015 NSTX-U Supported by Culham Sci.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Hebrew.
Radiative divertor with impurity seeding in NSTX V. A. Soukhanovskii (LLNL) Acknowledgements: NSTX Team NSTX Results Review Princeton, NJ Wednesday, 1.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC SPG NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Research Operations Update NSTX-U Team Meeting Stefan Gerhardt B-318 4/25/2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
Wave Heating and Current Drive TSG: XMP/XPs for the 2015 NSXT-U Campaign RF-TSG R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli Univ. Rep: P.
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX NSTX Team Meeting –Masa Ono May 1, 2015 NSTX-U Team Meeting May 1, 2015 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Monitoring impact of the LLD Adam McLean, ORNL T. Gray, R. Maingi Lithium, TSG group preliminary research forum PPPL, B252 Nov. 23, 2009 NSTX Supported.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
J-W. Ahn 1 K.F. Gan 2, F. Scotti 3, R. Maingi 1, J.M. Canik 1, T.K. Gray 1, J.D. Lore 1, A.G. McLean 4, A.L. Roquemore 3, V.A. Soukhanovskii 4 and the.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Research Operations Update S. P. Gerhardt J. Hosea, R. Ellis, R. Kaita, L. Roquemore and the NSTX Research Team NSTX-U Team Meeting B318 5/7/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) This Talk NSTX-U Port Allocations and Diagnostic Installation Prep MAPP on LTX HHFW center conductor upgrade update 2

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) Overall Comments on Diagnostics From the May 2 nd rollover meeting: Diagnostic installations can/will start as soon as Aug. 1 st. –And some work possibly can/should be sooner December 2013-March 2014: Presently scheduled for test pump-down. Test-cell work is approaching critical path…diagnostic installation work must be timely and efficient. –If your diagnostic goes on exactly as before, then the installation will be as per existing procedures written by construction group. Be ready to support them. –If your diagnostic is new, then it needs custom procedures for installation. Talk to me, Brent, Bob, Lane, about what procedure it should go in. –No major in-vessel diagnostic work should be planned before CD-4 in 2014.

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) Overall Comments on Diagnostics From the May 2 nd rollover meeting: Diagnostic installations can/will start as soon as Aug. 1 st. –And some work possibly can/should be sooner December 2013-March 2014: Presently scheduled for test pump-down. Test-cell work is approaching critical path…diagnostic installation work must be timely and efficient. –If your diagnostic goes on exactly as before, then the installation will be as per existing procedures written by construction group. Be ready to support them. –If your diagnostic is new, then it needs custom procedures for installation. Talk to me, Brent, Bob, Lane, about what procedure it should go in. –No major in-vessel diagnostic work should be planned before CD-4 in Coming months are critical for finalizing diagnostic design and fabrication, installation plans and procedures. NSTX-U project is NOT going to wait for any diagnostic not required for CD-4. Have your vacuum interface ready by middle/end of summer.

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) Complete Port Allocation Tables & Maps Have Been Developed Contain all Diagnostics, GDC Anodes and Filaments, Electrical Feedthroughs, Vacuum Gauges and Gas Injectors Example sheet for midplane ports: Using these to synchronize diagnostic and engineering needs for port space. If you want to see these, let me know…these are what we are working towards implementing

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) New Port Covers Have Been Designed For Bays E, I, and J More Clever Diagnostic Engineering By L. Roquemore Bay E Supports 3 UV Spectrometers (LoWEUS, XEUS, MonaLisa) and MIG1 Bay I Supports XCS, TGS, IR & Visible Cameras, SSNPA, SGI, 1D CCD & EIES, Microwave Imaging, QMB, Bolometers Design is very close to done. Bay J Supports IR and Visible Cameras, UT-K and Divertor Spectrometers, Upward LITER, UCLA Reflectometer and Polarimeter, LBO, RF Probe. Warning: These images are a few weeks old. Details have changed slightly. Talk to Lane or Brent for most up to date. Bay-L Cap (not shown) Supports MPTS exit window, High-k exit, plasma TV+GPI view, SSNPA, spectroscopy & CHERS view, GDC feedthroughs, magnetics feedthroughs.

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) Some Background Activities on Gas Injection System Preparation Had an engineering peer review of “electromagnetic” MGI valves for NSTX-Upgrade. –Provided input on valve design to U.-Washington collaborators. “Finalized” with NSTX-U engineers the locations of all injectors, pressure gauges, and GDC feedthroughs. Begun conceptual design work on high-throughput divertor gas injectors for NSTX-U. Developed a PCS software specification for the NSTX-U gas injection system. – Includes (as long-term goal) PCS control of SGI, divertor gas, MGI. Note: most software engineer resources presently dedicated to Upgrade scope tasks.

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) Preparation of Purdue University Materials Analysis and Particle Probe – MAPP – for sample exposure on LTX nearing completion J.P. Allain (Purdue), D. Andruczyk (U. of Illinois), R. Ellis, R. Kaita, D. Labrie, M. Lucia, M. Mardenfeld, et al. Molybdenum alloy (TZM) holders machined for four samples to be exposed and heated individually “Geneva” drive for reproducible positioning of samples designed, installed, and tested Successful fit-up of probe drive with test chamber on LTX Near-term plans Pumpdown, leakcheck, and bakeout of bellow drive prior to installation on LTX Thermal Desorption Spectroscopy planned as first measurements for samples exposed to LTX plasmas Heating samples and observing spectrum with residual gas analyzer allows determination of molecules adsorbed by surface due to plasma exposure

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) NSTX HHFW Compliant Center Conductor Upgrade Status R. Ellis and J. Hosea Successful CDR March 30. Bids for copper non-compliant portion of center conductors are due today; award May 6. We will order compliant section prototypes from two separate vendors. –Drawing for compliant section approved May 6. –Uses geometry shown at CDR. –Requisitions by May 7. Two back plates successfully test fit in RF Test Facility. –Spools connecting feedthroughs to backplates are complete. Designing adapter plates for two feedthroughs. Fabricate adapters in May. Install antenna mockup beginning of June. 12/23/2015

NSTX-U NSTX-U Team Meeting, Research Operations Notes-Gerhardt (5/7/2013) 10 Fit-up of two antenna back plates in RF test stand Test mock-up utilizes single feed from design pre-2008 configuration. Will use actual Faraday cages and BN limiters in test stand.