February 13, 2008RPC2007-Mumbai1 RPC Production for Fast Muon Trigger System for Byungsik Hong Korea University for the PHENIX Collaboration.

Slides:



Advertisements
Similar presentations
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Advertisements

1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
PHENIX Decadal Plan o Midterm upgrades until 2015 o Long term evolution after 2015 Dynamical origins of spin- dependent interactions New probes of longitudinal.
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Mar. 17, 2006 Imran Younus Probing Gluon Polarization with Longitudinally Polarized p+p Collisions at  s = 200 GeV.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
PHENIX Detector Upgrade for Triggering Fast Muons from W-Boson Decays Using RPC Technology Xiaochun He, Georgia State University For PHENIX Collaboration.
Performance of PHENIX High Momentum Muon Trigger 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
PANIC05 M. Liu1 Probing the Gluon Polarization with A LL of J/  at RHIC Ming X. Liu Los Alamos National Lab (PHENIX Collaboration)
Spin Physics with PHENIX (an overview, but mainly  G) Abhay Deshpande Stony Brook University RIKEN BNL Research Center July 28, 2011.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
Prospects in ALICE for  mesons Daniel Tapia Takaki (Birmingham, UK) for the ALICE Collaboration International Conference on STRANGENESS IN QUARK MATTER.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Kyoto Univ. RIKEN Katsuro Nakamura (Kyoto University) 2012/ 2/ 13 Kyoto University GCOE Symposium 2012/2/131 Kyoto University GCOE Symposium.
Performance of PHENIX High Momentum Muon Trigger.
First measurement and future prospects for measurements of single spin asymmetries in W production with the PHENIX experiment at RHIC Young Jin Kim for.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Performance of PHENIX High Momentum Muon Trigger.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Dec 2002 Craig Ogilvie 1 Physics Goals of Si Vertex Detector  Physics priorities latter part of this decade –spin carried by gluons:  G vs x –modification.
PHENIX W-Boson Trigger Itaru Nakagawa RIKEN/RBRC On behalf of RPC/MuTrig-FEE Collaboration.
( ATLAS was designed for LHC: L=10 34 cm -2 s -1 ) [ Now we expect 7.5 x instantaneous and 10 x integrated luminosity ] PILEUP: from ~30  >200 proton.
Spin Physics with PHENIX (an overview, but mainly  G) Abhay Deshpande Stony Brook University RIKEN BNL Research Center PANIC’11 at MIT July 28, 2011.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
October 19, 2007Heavy Ion Meeting1 RPC Upgrade for PHENIX Byungsik Hong Korea University.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
RPCs for the W measurement in PHENIX Chong Kim Korea University Japan-Korea PHENIX collaboration workshop, Nov. 27, 2012 for the PHENIX collaboration.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Trigger & Tracking detector for CMS
Electron Trigger in PHENIX Kenta Shigaki (KEK) at PHENIX Heavy Flavor and Light Vector Meson Physics Working Group Meeting on March 9, 2000.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Evidence for Strongly Interacting Opaque Plasma
Production ad Quality control of RPCs for the CMS muon barrel system
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
CMS muon detectors and muon system performance
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
PHENIX RPC R&D EFFORT Beau Meredith
RPC Production for Fast Muon Trigger System for
11th Pisa meeting on advanced detectors
Presentation transcript:

February 13, 2008RPC2007-Mumbai1 RPC Production for Fast Muon Trigger System for Byungsik Hong Korea University for the PHENIX Collaboration

February 13, 2008RPC2007-Mumbai2 Contents  Motivation  Characteristics for PHENIX RPCs  Quality assurance plan  Schedule Gap production and installation  Summary

February 13, 2008RPC2007-Mumbai3 Motivation  The origin of the proton spin u u d Quark Spin ΔΣ = 0.25 ∓ 0.10 → known as Spin Crisis Ref.) EMC, Phys.Lett.B206, 364 (1988); Nucl.Phys.B328, 1 (1989) Spin ½ quarks Spin ½ q-bars Spin 1 gluons

February 13, 2008RPC2007-Mumbai4 Present Understanding x  Spin dependent gluon distribution functions by the QCD analysis of DIS data ΔG = 0.47 ∓ 1.08 (largely unknown) (Ref.) M. Hirai, S. Kumano, N. Saito, Phys. Rev. D 74, (2006)  Spin dependent quark distribution functions by the QCD analysis of DIS data Δq(x) : well known, Δq(x) : not well known

February 13, 2008RPC2007-Mumbai5 Detailed Quark and Antiquark Spins  Main motivation of the PHENIX RPC upgrade  W-boson production The sea quark polarizations of the proton can be probed by The single spin asymmetry, A L, of W + and W -. R L

February 13, 2008RPC2007-Mumbai6 Analysis Method  The quark and antiquark polarizations of the proton can be estimated through A L, at Q 2 = M W 2, x 2 >> x 1 x 1 >> x 2

February 13, 2008RPC2007-Mumbai7 Experimental Requirement Design Luminosity of RHIC L = 2x10 32 /cm 2 /s for √s = 500 GeV σ tot = 60 mb Raw rate at PHENIX = 12 MHz PHENIX DAQ limit ≈ 2 kHz for muon arms Required RF ~ 6,000 Cf.) Current RF by MuID trigger ~ 500 We need to introduce the muon trigger, based on the momentum measurement. → RPC based muon trigger upgrade

February 13, 2008RPC2007-Mumbai8 PHENIX RPC Locations RPC1(a,b)RPC2 RPC3 We need total 256 RPC modules. (For the detailed plan, see Rusty Towell’s talk in PL-8 on Friday.)

February 13, 2008RPC2007-Mumbai9 Why do we employ RPC?  General characteristics of RPC Fast response - Suitable for the trigger device Good timing resolution: 1~2 ns Good spatial resolution - Typically a few cm - Determined by the strip width and the cluster size Low production cost High-rate capability in avalanche mode

February 13, 2008RPC2007-Mumbai10 Specific Characteristics of Trigger RPC Characteristics of double gap RPC in avalanche mode as a muon trigger detector Time resolution1 ~ 2 ns for M.I.P. Efficiency> 95 % for M.I.P. Rate capability1 ~ 2 kHz/cm 2 Noise rate for plain RPCs10 ~ 50 Hz/cm 2 for ~ Ohm∙cm Noise rate for oiled RPCs0.5 ~ 5 Hz/cm 2 for ~ Ohm∙cm Resistivity of resistive plates10 10 ~ Ohm∙cm Typical strip multiplicity1.5 ~ 3.0

February 13, 2008RPC2007-Mumbai11 Efficiency Typical shape of the efficiency curve for various thresholds Efficiencies for double- and single gap (Ref.) S. H. Ahn et al., Nucl. Instrum. Methods A 508, 147 (2003)

February 13, 2008RPC2007-Mumbai12 Time Resolution FWHM ~ 3 ns No SF 6 Time spectrum at 9.0 kV with Th = 270 fC Time resolutions as a function of HV No SF 6

February 13, 2008RPC2007-Mumbai13 Charge  Our definition of the avalanche charge < 10 pC  Definition of the avalanche mode operation P(streamers) < 10%  Large pulse Large number of strips Cause difficulty for the reconstruction of high momentum muons No SF 6

February 13, 2008RPC2007-Mumbai14 For the specific R&D effort for the PHENIX RPC, see Beau Meredith’s talk in PL-11 on Sat. ~10 pC for the limit of avalanche ~2.7 pC at ε~95%

February 13, 2008RPC2007-Mumbai15 Korea Univ. & CMS The Korea Detector Laboratory (KODEL) of Korea University has been an active member of the CMS (Compact Muon Solenoid)/LHC at CERN since For more details, see the following two talks:  Sung Keun Park in PL-3 on Thursday  Kyong Sei Lee in PL-7 on Friday

February 13, 2008RPC2007-Mumbai16 Endcap Region of CMS Phase I Phase II Gap Production for CMS Endcap RPCs

February 13, 2008RPC2007-Mumbai17

February 13, 2008RPC2007-Mumbai18 ► Bakelites are produced and cut in Italy ► Gas gaps are produced at Korea University ► RPC frame & parts are procured in China (CIAE) ► Final assembly is done at BNL. Flow of RPC Gaps and Parts for PHENIX bakelite route gas cell route frames and parts Korea BNL China Italy

February 13, 2008RPC2007-Mumbai19 Quality Control of Gaps  Inspection of raw bakelite for the surface quality  Checking the graphite surface and the condition for PET coating  Test for gas leak and spacer bonding Add 20 hPa to each gap (1 hPa =1 mbar ) No detached spacers Pressure loss : < 0.2 hPa for 15 minutes  Test for high-voltage holding and current 1.5 days for flushing + 5 days for HV test Current limit for each gas gap right after the production: < 3 μA/m 2 /gap at working HV (9.4 kV at 1013 hPa )  Assignment of the bar code only for the qualified gas gaps

February 13, 2008RPC2007-Mumbai20 Current Limits for PHENIX PHENIX Region Current limit for each gap at 8.5 kV ( μ A) Current limit for each gap at 9.4 kV ( μ A) Current limit for RPC at 9.4 kV ( μ A) RE3 Ring 1-2 (N+S)1210 RE3 Ring 3-4 (N+S)2415 RE3 Ring 5-6 (N+S)3515 RE2 Ring 1-2 (N+S)1210 RE2 Ring 3-4 (N+S)2415 RE2 Ring 5-6 (N+S)2515 RE2 Ring 7-8 (N+S)3515

February 13, 2008RPC2007-Mumbai21 Examples of CMS Endcap RPCs 9.4 kV (72 h) 8.5 kV (12 h) Current ( μ A) Individual Gap ID Rejected Gaps Blue: begin Pink: end

February 13, 2008RPC2007-Mumbai22 PHENIX Schedule I  2008 January Send 6 sets of prototype C (RPC3A) gaps to BNL March Send prototype D gaps to BNL Complete RPC3 ‘half octant’ Install two ‘half octant’s in one arm One in the RPC2 and another one in the RPC3 positions Install one octant absorber made of ~30 cm (or 2 λ I ) thick Cu in one arm ~June Start the mass production of RPC gaps for PHENIX RPC 3A RPC 3B RPC 3C

February 13, 2008RPC2007-Mumbai23 PHENIX Schedule II  2009 Install absorber in the North arm Install RPC2 and RPC3 in the North arm  2010 Install absorber in the South arm Install RPC2 and RPC3 in the South arm  2011 Take out one nuclear interaction length absorber Install RPC1 in both arms Start to take the high statistics polarized p+p data

February 13, 2008RPC2007-Mumbai24 Current Production Plan PHENIX Region Number of RPC Modules (Gaps) Estimated months for production Tentative Schedule RPC3 (North)48(96)~ 2.5 Start ~June 2008 RPC2 (North)64(128)~ 3.0 Finish by the end of 2008 RPC3 (South)48(96)~ 2.5 RPC2 (South)64(128)~ 3.0 Finish by the end of 2009 RPC1a (both arms)16(48)~1 RPC1b (both arms)16(64)~1 Finish by the end of 2010 Sum256 (560)~13

February 13, 2008RPC2007-Mumbai25 Summary  The origin of the proton spin is the fundamental question of nuclear physics.  The PHENIX is upgrading the muon trigger system by using the RPCs in order to filter out the small cross-section W- candidate events. The flavor dependent quark and anti-quark spin distribution functions can be measured.  Korea University will produce all PHENIX RPC gas gaps. The mass production and installation will be completed by  Additional potential application of the L1 muon trigger for heavy-ion collisions still need to be explored, for example, Heavy-flavor trigger in combination with the forward vertex upgrade Dimuon trigger for the vector mesons for RHIC II

February 13, 2008RPC2007-Mumbai26 Back-up Slides

February 13, 2008RPC2007-Mumbai27 CMS Endcap RPC 1. Function : L1 muon triggers 2 wings (RE+, RE-) 4 stations (RE1, RE2, RE3, RE4) Pseudo rapidity coverage : 0.9 < η < 2.1 (1.6) η segmentations : 10 (6) 2. Total # of RPCs : 756 (432) Total # of FEBs : 2,268 (1,296) Total # of channels : 85,248 (41,472) 3. By March 2007, the gap production for phase I (0.9 < η < 1.6) was completed for the first operation of CMS in 2008.