R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.

Slides:



Advertisements
Similar presentations
LSC - 28 February M. Pezzetti – Cryogenics 1 28 February 2014 M. Pezzetti EDMS Id: v.1.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Barriere O, Le Roux P
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Safe-Room Status Intermediate ‘Conclusions’ M. Brugger (based on HSE discussion)
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Follow-Ups and Notes. Project News LMC R2E (SEE Events) Update (see link)link RadWG SEE list (link) and Post-Mortem Database (link) synchronizedlink MCWG.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
1 1. Some recent views ( ) 2 Linac tunnel
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
K. Foraz, S. Prodon TS-IC TS workshop – May 2005 Underground logistics K. Foraz, S. Prodon TS-IC.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
R2E Point 5 mini safe room cooling / ventilation A. L. Perrot, 30 th April 2013.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
R2E-LHC Iterations Layout & Rack Locations – Collection of drawings – Inspection & Pictures – Review of monitor locations Review of Radiation Levels: –
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/02/04.
Status, Schedule and EVM for the test facility project
Framework Schedule from EYETS 2016 to LS2
Identification of the unused cables
Equipment simplified model SMR UR safety
Francois and Lau EATM 17 July 2012
on behalf of the RF group
Helium spill in LHC tunnel
News from R2E – Safe Room Proposal of local fire-resistant racks agreed upon Performed visit (HSE, EN-EL, R2E) to clarify details Solution already integrated.
LHC Civil Engineering Activities for YETS – LS2
Y. Muttoni - J.P. Corso TS Workshop Archamps
SPS activities during LS2 TE-EPC (Power Converter Group)
East Hall under construction
K. Foraz on behalf of OSS members
Review of UJ56 relocation options
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
Powering and Safety day Underground access during powering tests
Presentation transcript:

R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012

Outline 1.R2E mitigation activities - status 2.R2E LS1 planning 3.Documentation 4.Organisational aspects R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE2

Areas of the R2E mitigation activities Main critical areas today considered UJ76 UJ14/16 RR13/17 UJ56 RR53/57 US85 R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE3

Status of the mitigation activities Actions already performed – shielding ( ) Point 1: RBs/UJs Points 2 & 8: UJ22/23/88/87 Point 7: UJ76 wall Point 6: ducts between RAs/UAs 63/67 Xmas break 2011 RBs and UJs in LSS1, Xmas break 2011 R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE4

Shielding activities Christmas break Point 1: RBs/UJs 5

Shielding activities Christmas break R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE6

2008: UX85 cryogenics cold compressor system, PLCs QURCA & QUICC : UPS removed from UJ : UX85 cryogenics valves positionners (QURCA, QUICC) 2009: US85 fire & ODH detector control racks and associated detectors units Christmas break: UJ56/76 EN/EL RTUs UJ56/76 fire & ODH detection control racks TS4: UJ14/16 PIC TS5: cryogenics US85 CPU (QURCb) Actions already performed – relocation ( ) Status of the mitigation activities R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE7

Actions already performed – relocation ( ) 2011 Xmas break Point 1: Fire detectors (from RR13/17 to US15) Points 4/6: cryogenics CPUs (from UX to UL) Point 5:UPS (from UJ56 to UL557) UL557: Civil engineering activities (ducts, vault along 20 m) Point 8: Ethernet racks (startpoint) (from US85 to UL86) WIC & timing racks (from US85 to UA83) QURCb & rack EYQ (from US85 level 2 to lUS85 level 0) 2012 Technical Stops (TS1-3) Point 1: cable trays, survey references, empty racks installed in ULs Point 5: cable trays, GGPSO preparatory work for installation, UL557 new lightning, pipes survey of the UL557 by CE Point 7: cables trays, survey references, empty racks moved to nominal location EL preparatory work before wall dismantling Point 8: cable trays Status of the mitigation activities R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE8

Actions to be performed during Xmas break 2012 Relocation Point 1: cable trays, if time start cables installation, Point 5: UL557: GGPSO installation, cable trays modification, new lightning UJ56: survey activity to link UJ56 to LHC tunnel framework Point 7: power sockets replacement Point 8: start installing the UPS cables between US85 and UA83, Shielding Point 8: CE activities (rail installation) for US85 mobile shielding Status of the mitigation activities R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE9

Relocation Point 8 Point 5 Point 1 Point 7 Shielding Points 1, 5, 7 & 8 Integration studies R2E activities in Point 8 Point 5 Point 1 Point 7 Planning – LS1 Finished and approved Sequences finished Merged into LHC LS1 planning Status of the mitigation activities R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE10

R2E LS1 planning work by M. Barberan R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE11

Point weeks Start = End of April 2013 End = mid July 2014 Point 5 – 68,5 weeks Start = mid April 2013 End = Aug Point 7 – 54 weeks Start = May 2013 End = June 2014 Point weeks Start = mid May 2013 End = mid Dec R2E LS1 planning work by M. Barberan & K. Foraz R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE12

13 Criticality Point 1: EL 45 weeks, CV 33 weeks Point 5 : EL 59 weeks (2 shifts), CV 32 weeks (2 teams), CE 9 weeks No margin! Anticipation in implementation (2012 Technical stops)  20 days in total  Profit of each day & each available ressource Minimise the criticality level Point 7 : EL 58 # weeks, CV 16 weeks, CE 9 weeks &  Very close supervision of work in-situ  Material procurement  Installation procedures Key points to avoid delays  Storage areas management R2E LS1 planning

Constraints by LHC activities  Exception: Point 1- preparatory work start during ELQA sectors 12 &81; but equipment unplug only after ELQA  R2E after ELQA tests in adjacent sectors Constraints on LHC activities  Point 1: Cool down starts when R2E commissioning activities are finished  Point 7: Cryo and 3 VAC control racks (insulation vacuum control for QRL and cold magnets) relocated and commisionned before the cool down can start in adjacent sectors.  Point 5: - Cool down depends of the R2E cryo activities - Shielding transport via Pt4/6 and/or via PM54 => co-activities with LHC and/or CMS to be optimised Pt5 planning may slightly change R2E LS1 planning R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE14

Integration studies Documentation (1/2) Title= %integration R2E% (exact) in EDMS: 32 documents R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE15

- ‘Protection of equipment located in UJ76 ‘ (Phase I, edms: ) - ‘Mobile shielding for RR73/77’ (edms: ) - ‘Protection of equipment located in US85’: Phase I (edms: ) & Phase II (edms ) - ‘Strategy against SEE for Fire and Oxygen deficiency detection systems’ (edms: ) - ‘Protection of equipment located in UJ56’ ( edms: ) - ‘R2E shielding for LHC Points 1, 5, and 8’ (edms: ) - ‘Protection of equipment located in UJ14 and UJ16’ (edms: ) - ‘Protection of equipment located in UJ76 (phase II)’ : under preparation Documentation (2/2) ECRs All in EDMS :/projects/LHC machine/LHC R2E Project/related documents/Integration and Installation :/projects/LHC machine/LHC R2E Project/related documents/Integration and Installation R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE16

Organisation towards LS1 - R2E relocation & shielding meetings are now weekly from mid November focus on installation & material issues - Work-package analysis Point 1 : 28/09/2012 Point 5: 19 & 26/10/2012 Point 7: 9 & 16/11/2012 Point 8: 10/09/2012 Documents by Maria (soon in edms for approval) - Installation drawings checks Start in December by EN/MEF-int if drawings available Drawings provided by EN/EL and EN/CV (firm) - Installation procedures Request by EN/MEF-OSS at the end of the WPA Follow-up in R2E meetings (start mid-November) ICL LS1 & R2E meetings R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE17

Critical points during LS1 implementation  Integration  Material Intermediate survey scansBE/ABPFollow-upEqpt owners & services - procurement - storage before installation - Installation non conformities Cross-checks with modelsEN/MEF  Delays vs planning  Installation Follow–up & adaptationEN/MEF Required actionTeam Critical points Day-to-day in-situ supervision EN/MEF, BE/OP Management of storage areasEN/MEF R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE18

19 1. Day-to-day in-situ management & supervision (rapidly react/solve problems of all nature as they occurred, direct contact with the groups supervisors, cleaning/ waste management) 5. Planning: follow – up and adaptation (detailed installation planning & critical path weekly updated, impact on/of the non R2E works) 3. Material delivery & contracts: weekly follow – up 6. Communicating (periodical reviews of the activities, non conformities & planning) 2. Safety supervision (sites managers to enforce safety and environment protection rules, ‘VIC’, follow the implementation of safety measures/procedures) 4. Integration: non conformities follow-up (weekly reports, intermediate survey scans ) Organisation during the LS1 installation R2E implementation & worksite organisation R2E Point coordinator in charge R2E point coordinator involved

Main concerns – Review 2011  Integration Technical solution proposed by EN DSO and M. Brugger to DGS/SEE: Fire proof racks in TZ76 (see Markus presentation) - Relocation of EN/EL equipment located in the UJ56 safe room - TZ76 separating wall dismantling  Worksite supervision – R2E point coordinators Point 1: M. Jeckel Point 5: B. Lefort Point 7: O. Andujar Point 8: B. Mikulec  Storage requests (surface- tunnel) - Space already reserved in surface for shielding blocks - Material storage under the equipment owners responsibility (discussed during work-package analysis) R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE20

Main concerns towards LS1  Integration - Installation drawings Checks by LHC integration team (ICL) Should start in Dec with EN/EL – EN/CV - Cables trays in USC55 Discussion with CMS and EN/EL  Material procurement  Manpower Regular follow-up by R2E will start mid November Equipment owners should finalise their requests R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE21

Summary  Integration & planning studies = finished R2E activities will start Mid April 2013  ECR documentation almost finished (Pt7 ECR missing)  WPA : in progress  Main concerns raised during R2E 2011 review= solved  Main concerns towards LS1: Installation drawings & procedures, material requirement, storage areas, manpower Follow-up start Mid November in the R2E relocation & shielding meetings R2E project meeting, 23rd October 2012A. L. Perrot, EN-MEF/LE22

Addendum

R2E LS1 planning Evolution Point 5 7/06/2012  54 weeks 12/06/2012  64,5 weeks (10 weeks ) CV No work in // with EL CV  2 Teams EL  2 Shifts 13/07/2012  66,5 weeks No works during Christmas (2 Weeks) 10/08/2012  67, 5 weeks Transport UTAs (1 Week) 23/10/2012  68,5 Weeks ERD & Power Converters Board (1 Week)

LS1 R2E civil engineering activities  Point 5: UL557-UL558: 2 ducts Ø350mm R2E work package analysis, 10 th September 2012A. L. Perrot, EN-MEF/LE25 UL557: mini ‘safe room’ implementation UL557-UJ56: 4 ducts 16 m long Ø400mm UJ56 – LHC tunnel: 5 ducts Ø350mm  Point 7 TZ76 wall dismantling

access EL UPS: already relocated in TZ76 Point 7 – Relocation Equipment to be relocated outside UJ76- level 0 inside blue thick borders equipment to be relocated. 48 V dc system CO AUG CO Anti-panic ligthning R2E work package analysis, 10 th September 2012A. L. Perrot, EN-MEF/LE26

Point 7 – Relocation TZ76 equipment layout after relocation Today: extremity of the separating wall R2E work package analysis, 10 th September 2012A. L. Perrot, EN-MEF/LE27