Control of Hazardous Energy Lockout/Tagout 2 Why bother with lockout/tagout? Lockout and tagout procedures are designed and implemented to protect you.

Slides:



Advertisements
Similar presentations
Lockout/Tagout Awareness Training
Advertisements

Lock Out Tag Out UNIVERSITY of N ORTHERN C OLORADO.
Lockout/Tagout/Verify Awareness
BIDMC EH&S Dept1 Lockout/Tagout Training Proper Lockout Procedure BIDMC EC 60 Policy A teaching hospital of Harvard Medical School.
Lock Out/Tag Out Training Lock-Out/Tag-Out OSHA Definition. Lockout/Tagout (LOTO) refers to specific practices and procedures to safeguard employees.
LOCKOUT TAGOUT Introduction Each year nearly 150 people die because there was a failure to control energy.
CONTROL OF HAZARDOUS ENERGY “LOCKOUT/TAGOUT” (LOTO)
Introduction Most accidents are caused by the uncontrolled release of hazardous energy. Many of these accidents can be prevented by proper lock-out/tag-out.
Lockout/Tagout for Injection Molding
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
Lockout/Tagout (LOTO):
Presented by Environmental Health and Safety
LOCKOUT/TAGOUT.
Lockout and Tagout.
THE INTERNATIONAL SOCIETY OF FIRE SERVICE INSTRUCTORS Electronic INSTRUCT-O-GRAM Program Lockout / Tagout Policy.
Lockout/Tagout Authorized Employee. What Is Hazardous Energy? –Often invisible –Can be hydraulic or mechanical –Live or stored –Moving machine or equipment.
Lockout-Tagout (Control of Hazardous Energy) This training program is designed to inform management of the requirements of the Lockout-Tagout Program for.
Lockout/Tagout (The Control of Hazardous Energy)
Controlling Hazardous Energy
Control of Hazardous Energy – Lockout/Tagout 29 CFR
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation “Imagine yourself performing maintenance inside of a machine and suddenly,
Lockout - Tagout Control of Hazardous Energy CFR
Copyright  1999 Business & Legal Reports, Inc. BLR’s Safety Training Presentations Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Lockout / Tagout Control of Hazardous Energy
Lockout/Tagout Affected Employees. © Business & Legal Reports, Inc Session Objectives You will be able to: Recognize hazardous energy sources Carry.
Lockout/Tagout Authorized Employee Slide Show Notes
Oklahoma State University EHS Lockout/Tagout Standard Proper Lockout Procedure.
NWACC Business & Industry Workforce Development Institute J- 1 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT) FOR GENERAL INDUSTRY.
Trindel Insurance Fund
Lockout/Tagout Standard
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
Lockout/Tagout for Affected Employees Understand the Basics.
© 2009 Factory Strategies Group LLC. All rights reserved. Safety Series (Sample Slides) Lockout - Tagout.
Lock-Out / Tag-Out Types of Energy Types of Energy Electrical Electrical Mechanical Mechanical Chemical Chemical Thermal Thermal Hydraulic Hydraulic.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
 The purpose of this Lockout/Tagout Procedure is to have a positive method of confirming that a piece of equipment, machine, or device is not energized.
Control Of Hazardous Energy
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
A PRESENTATION ON LOCKOUT/ TAGOUT” (LOTO) BY ORILOYE JIDE 13/03/2015
Pennsylvania Bureau of Deep Mine Safety Lockout/Tagout Program.
Lockout/Tagout.
Basic Lockout Guidelines
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Copyright © 2012 American Safety Management Inc. Lockout Tagout.
Lockout - Tagout Control of Hazardous Energy OSHA Standard
Confined Spaces 29 CFR is the OSHA regulation that requires employers to protect employees in general industry from the hazards of entering a.
Control of Hazardous Energy 29 CFR Lockout/Tagout Basics? Regulatory requirements Energy Isolation Devices Energy Sources Affected, Authorized.
© BLR ® —Business & Legal Resources 1408 Lockout/Tagout Authorized Employee.
1 Lockout/Tagout MEETING THE STANDARD MEETING THE STANDARD.
LOCKOUT – TAGOUT TRAINING PROGRAM. Lockout/Tagout + The OSHA Standard for the Control of Hazardous Energy (Lockout/Tagout) 29 CFR covers the.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Lock Out Tag Out Affected Employees.
LOCK-OUT/TAGOUT SAFETY SAFELY MAINTAINING EQUIPMENT AND MACHINES.
CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TRYOUT). LOCKOUT/TRYOUT The OSHA Standard for the Control of Hazardous Energy (Lockout/Tryout) 29 CFR covers.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
29 CFR  In this course, we will cover the following:  The need for energy control procedures  Methods of lockout / tagout  Employer’s responsibilities.
Lockout/tagout for authorized employee
LOCKOUT/TAGOUT/VERIFY
Lockout/Tagout Standard
Lock Out / Tag Out The Control of Hazardous Energy
Energy is a good servant but a cruel master.
Energy Control Procedures Lockout/Tagout 29 CFR
Confined Spaces 29 CFR is the OSHA regulation
Control of Hazardous Energy
Presented by Environmental Health and Safety
Lockout/tagout Refresher Training
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Control of Hazardous Energy Lockout/Tagout

2 Why bother with lockout/tagout? Lockout and tagout procedures are designed and implemented to protect you from an accidental release of energy.

3 What is an “energy source?” Energy sources include: Energy sources include: Electrical Electrical Mechanical Mechanical Pneumatic Pneumatic Hydraulic Hydraulic Chemical Chemical Thermal Pressurized water or steam Gravity

4 Hazardous Energy Problems associated with hazardous energy include: Problems associated with hazardous energy include: Accidental start-ups Accidental start-ups Electrical shock Electrical shock Release of stored or residual energy Release of stored or residual energy

5 Control of Hazardous Energy The following slides demonstrate some of the potential hazards associated with energy sources.

6 Swift justice for a Texas Shoplifter

7 Curly finds himself in trouble (again)…

8 Rick Smith (as a child)

9 What is the difference between lockout and tagout? Lockout – a padlock and locking device are used to physically “hold” an energy control point, such as a switch, lever or valve handle. This makes it impossible for energy to be released.

10 Types of lockout devices Plug Locks Plug Locks Ball Valve Lockout Ball Valve Lockout Gate Valve Lockout Gate Valve Lockout Group Hasp Group Hasp Electrical Electrical Hydraulic, pneumatic, and other pressurized systems. Hydraulic, pneumatic, and other pressurized systems.

11 What is the difference between lockout and tagout? Tagout – a written warning that tells operators not to operate a switch, lever or valve that could release hazardous energy. Tagouts DO NOT physically prevent someone from releasing potentially hazardous energy.

12 Examples of Tags

13 When should you lockout? A lockout should be used when working around systems where an unexpected release of energy could occur, causing injury or equipment damage.

14 Common examples of when lockouts should be used: Clearing jammed or blocked mechanisms Clearing jammed or blocked mechanisms Preventive Maintenance Preventive Maintenance Working in confined spaces Working in confined spaces Repairs on electrical circuits Repairs on electrical circuits

15 Isolate ALL energy sources Prior to starting a job, all energy sources must be identified (mechanical, electrical, etc.). Each energy source must be locked out.

16 Multiple or Group Lockout Lockout boxes are frequently used so that multiple employees can install their personal safety locks. These boxes are typically stored in close proximity to the associated piece of equipment. Boxes are usually labeled to identify the corresponding plant system.

17 Multiple Lockout

18 Group Lock

19 Prepare for shutdown Prepare for shutdown Shut down the machine or equipment Shut down the machine or equipment Safely release all stored or residual energy Safely release all stored or residual energy Isolate the machine or equipment from ALL energy sources Isolate the machine or equipment from ALL energy sources Apply the Lockout or Tagout Device(s) to the Energy Isolating Device(s) Apply the Lockout or Tagout Device(s) to the Energy Isolating Device(s) Verify isolation by physically attempting to “run” the machine or equipment. Verify isolation by physically attempting to “run” the machine or equipment. How to de-energize equipment

20 Repairman attempted to lockout raw mill separator Repairman attempted to lockout raw mill separator Repairman properly installed lock on associated MCC breaker Repairman properly installed lock on associated MCC breaker Repairman properly attempted to start equipment to verify lockout Repairman properly attempted to start equipment to verify lockout Equipment started because breaker was still energized (although it appeared to be open) Equipment started because breaker was still energized (although it appeared to be open) “Real World” Example

21 Clinker Sample Bldg MCC

22 Clinker Sample Bldg MCC

23 High Voltage Switchgear When de-energizing a high voltage switchgear, employees must contact a qualified electrician. Only qualified electricians are authorized to work on these systems.

24 High Voltage Switchgear

25 Every employee working in the plant Every employee working in the plant has been issued his or her own lock. has been issued his or her own lock. A specific lock color is assigned to each department. A specific lock color is assigned to each department. Locks SHOULD NOT be used to secure personal lockers, tool boxes, etc. Locks SHOULD NOT be used to secure personal lockers, tool boxes, etc. An individual should NEVER ask a co- worker to install or remove his or her personal lock. An individual should NEVER ask a co- worker to install or remove his or her personal lock. Lock & Lockout Protocol

26 Plant Lockout Policy (taken from Plant Manager’s memo dated 13 June 2002) “In lieu of these issues I want to make sure every employee understands that if they leave their lock, for any reason, on a piece of equipment and leave the plant site and that lock has to be removed either by getting the employee back to remove it, or cutting the lock off, disciplinary action will be taken against that employee. Further, that employee will be responsible to purchase the new lock after it has been cut off.”

27 Lockout/Tagout Standards OSHA regulates lockout/tagout OSHA regulates lockout/tagout through the “Control of Hazardous Energy” standard, 29 CFR MSHA regulates lockout/tagout MSHA regulates lockout/tagout through 30 CRF ,

28 Employer responsibilities under the “Control of Hazardous Energy” standard Establish an energy control program Establish an energy control program Establish energy control procedures for machines and equipment Establish energy control procedures for machines and equipment Provide employee training Provide employee training Conduct periodic inspections or audits of the energy control program Conduct periodic inspections or audits of the energy control program

29 When the standard applies An employee is required to remove or bypass a guard or other safety device. An employee is required to remove or bypass a guard or other safety device. An employee is required to place any part of their body in contact with the point of operation of an operational machine or piece of equipment. An employee is required to place any part of their body in contact with the point of operation of an operational machine or piece of equipment. An employee is required to place any part of their body into a “Danger Zone” associated with a machine operating cycle. An employee is required to place any part of their body into a “Danger Zone” associated with a machine operating cycle.

30 Work on electric equipment controlled by plugging in or unplugging the equipment. The plug is under exclusive control of the employee performing maintenance. Work on electric equipment controlled by plugging in or unplugging the equipment. The plug is under exclusive control of the employee performing maintenance. “Hot Tap” operations involving transmission and distribution systems for gas, steam, water, petroleum products, etc. “Hot Tap” operations involving transmission and distribution systems for gas, steam, water, petroleum products, etc. Exceptions to the standard

31 Minor Servicing Tasks Employees performing minor tool changes and adjustments that are routine, repetitive, and integral to the use of the equipment and that occur during normal operations are not covered by the Lockout/Tagout Standard, provided the work is performed using alternative measures that provide effective protection.

32 Outside Contractors Whenever outside contractors are engaged in activities covered by Lockout/Tagout, the on-site employer and the outside contractor shall inform each other of their respective Lockout or Tagout procedures. Whenever outside contractors are engaged in activities covered by Lockout/Tagout, the on-site employer and the outside contractor shall inform each other of their respective Lockout or Tagout procedures.

33

34

35 “FATAL FIVE” (main causes of injury) Failure to stop equipment. Failure to stop equipment. Failure to disconnect from power source. Failure to disconnect from power source. Failure to dissipate (bleed, neutralize) residual energy. Failure to dissipate (bleed, neutralize) residual energy. Accidental restarting of equipment. Accidental restarting of equipment. Failure to clear work areas before restarting. Failure to clear work areas before restarting.

36 Electrical Energy Hazards Arc flash Arc flash light Arc blast

37 Arc flash Temperature can escalate rapidly near the center of an arc flash, reaching 35,000 F. Copper melts at 1,981 F. The skin is very sensitive to temperature; while sitting in the sun for only six hours at 110 F, cell structure will start to break down. At 158 F, cell destruction occurs in one second. At 200 F, incurable third degree burns are incurred in one-tenth of a second.

38 Arc flash

39 Arc Flash Light At 35,000 degrees Fahrenheit, an arc flash can generate enough light to cause serious injury to the eyes. It is not uncommon for an electrician to develop cataracts three years after visual exposure to an arc flash.

40 Arc flash

41 Arc Blast Arc blast is a force caused by the rapid expansion of air due to the transition of solid conducting material into vapor. This rapid expansion can occupy 67,000 times the initial volume of the transitioning material. The blast can easily knock a person across a room, and the sound from the explosion can destroy a person’s ability to hear.

42 Arc Blast

43 Plugging in Electrical Equipment When “plugging in” or “disconnecting” 480 volt electrical equipment, THE DISCONNECT SWITCH MUST BE OPENED. The following pictures will demonstrate the reasons why!!

44

45 Electrical Burns

46 Site specific electrical hazards

47 Site specific electrical hazards

48 Site specific electrical hazards

49 Site specific electrical hazards

50 ANY QUESTIONS? THANKS FOR YOUR ATTENTION!