CHATSWORTH HIGH SCHOOL. LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD 1858301CHATSWORTH HSChatsworth.

Slides:



Advertisements
Similar presentations
Tam Valley School Modernization - Phase 1 Summer 2011.
Advertisements

1 Zero Tax Increase Referendum: Community Information Session.
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
CUSTODIAL INSPECTIONS Tips on how to get ready for the upcoming inspection season.
Cathedral of the Immaculate Conception Project Information Session.
S1725 BUILDING S1725, AREA MAP, MAP # 2. BUILDLING S1725, SITE MAP, MAP # 2 S1725.
Addressing Highest Priority Facility Needs
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
ADA Improvements on Administration Buildings Indian Valley Campus (One Stop Project)
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
May 6, 2010 Irvine Unified School District HMC Architects.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Civil Engineering & Architecture 2.3 Residential Design.
Construction Project Michael J. Bruno Bruno Construction Management.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
© 2011 wheresjenny.com Renovating your House. © 2011 wheresjenny.com Renovating your House Vocabulary. Have an extension: Build on to the existing house.
Tel : Fax: P.O.Box : Dubai, UAE.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
House Design Project Overview What each student must accomplish – 10 journals: date, time, weather, and what was accomplished or learned – Bubble drawings.
The Glenn House Mohammad Baradaranshoraka Kamal I. Mamoua Dinesh Gudavalli Swati R. Nair Udaya Sathya Chakradhar Kedarisetty Daeyang Heo December 04, 2014.
Job Order Contracting A Washington State Procurement Option
Building Services Department Summer Building Services Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
ADVANTAGES OF PERFORMING THE PROPERTY CONDITION ASSESSMENT (PCA) AND FLOOR AREA MEASUREMENT (FAM) JOINTLY HUNT CONSULTING, INC. PRESENTS Hunt Consulting,
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Finishing the Building
Kitchen ItemCostWhereStyle Sink Faucet$135 (paid)C-listBrushed stainless Sink ` Main Countertop Island Countertop Island Cabinet Cabinet hardware.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
ID 440: Project 1: Hospitality Design
Final Assignment part 1: revise stairs Some minor markups.
Capital Improvement Program for September 9, 2014.
Bathroom Notes Chapter 24. Types of bathrooms: Master Bath –A full bath –Part of the master bedroom area.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Smrha-Monroe Family Pictures of the House August 2005.
Team 3. …Because the next generation of building is restorative. East Halls.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
Things to Know about Remodelling a Small Bathroom Ph. No.(914) or (888)
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
Bond Project Update September 2017
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Building Services Summer 2016 Update
TECHNICAL SPECIFICATION AND REQUIREMENTS
Cornwall Central School District
2016 FCS Bond Project #5 Franklinton Middle School - Elevator & Toilet Renovation, H/C Exterior Ramp Scope: This project will upgrade the existing middle.
Capital Improvements Presentation
Huntsville City Schools Huntsville High School Softball
ISA Prime Developments
Boulevard PROFESSIONAL CENTER
2018 Bond Review and Proposal
~ West Seneca Central Schools ~
Recent Bond Accomplishments
Troy School District 2013 Bond Program – Series 1 Construction Update June 2016 Barton Malow | TMP.
Stoughton Public Library
Presentation transcript:

CHATSWORTH HIGH SCHOOL

LOCNSNAMTASK_NAME 8583CHATSWORTH HSPURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD CHATSWORTH HSChatsworth HS - Baseball Netting 8583 CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR) 8583CHATSWORTH SH (JOC)BASEBALL NETTING (JOC) 8583 CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O) NO DETAILED DESCRIPTION NO SPACE IDENTIFICATION NEED FIELD CLARIFICATION NEED PROJECT COST

LOCNSNAMTASK_NAME 8583CHATSWORTH HS PURCHASE & INSTALL MODULAR BUILDING AT GIRLS SOFTBALL FIELD NO NEW BUILDINGS AT SOFTBALL FIELD SINCE INITIAL SURVEY

LOCNSNAMTASK_NAME CHATSWORTH HSChatsworth HS - Baseball Netting 8583CHATSWORTH SH (JOC)BASEBALL NETTING (JOC) NETTING IS NOT CAPTURED, WHAT ABOUT STEEL POSTS?

LOCNSNAMTASK_NAME 8583CHATSWORTH SH (B LETTER)SHADE FAB/PADDING/BLEACHERS (B LTR) SHOULD THESE COMPONENTS BE SURVEYED?

 WE’RE ASSUMING THIS IS A RESTROOM RENOVATION WITHIN THE ADMINISTRATION AND PE BUILDING.  ASSUMING “POT” MEANS PATH OF TRAVEL, WHAT ADDITIONAL INFORMATION WILL BE NEEDED TO BE VALIDATED?  ADA FIXTURE VALIDATION. LOCNSNAMTASK_NAME 8583CHATSWORTH SH (M&O WORK)RPR/REN ADMIN/PE BLDGS RR-POT (M&O)

THERE ARE 12 RESTROOMS IN BOTH THE ADMINISTRATION AND PE BUILDING 24016ADMINISTRATION TOILET 24016ADMINISTRATION TOILET 24016ADMINISTRATION TOILET 24016ADMINISTRATION TOILET 24016ADMINISTRATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET 23677PHYSICAL EDUCATION TOILET

LIGHT FIXTURE COMPONENT HAS BEEN MODIFED FROM ORIGINAL SURVEY. FREQUENCY FOR GLUE UP CEILING TILE IS NOW 6. SHOULD THE RSL BE UPDATED GLOBALLY?

SAME AS 1 OF 12

NEW SINK - RSL NEEDS TO BE UPDATED FROM 10 TO 30. NEW TOILET - COMPONENT NEEDS TO BE CHANGED FROM TO 22895, WITH AN RSL OF 30.

NEW SINK, TOILET, FLOOR COVERING, AND PAINT. UPDATE RSL FOR THE GLUE UP CEILING TILE TO 0.

NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, URINALS, SINKS, PARTITIONS, AND HAND DRYER. TWO T-12 FIXTURES HAVE BEEN REPLACED WITH THREE T-8 FIXTURES.

NEW PAINT ON THE WALLS. NO URINAL COMPONET IN CURRENT DATA.

UPDATE CERAMIC WALL TILE RSL FROM 5 TO 35. UPDATE CERAMIC FLOOR TILE RSL FROM 10 TO MISSING 3.5 WATER CLOSET COMPONENTS IN CURRENT DATA.

UPDATE CERAMIC WALL TILE RSL FROM 5 TO 25. UPDATE CERAMIC FLOOR TILE RSL FROM 20 TO 35. UPDATE URINAL RSL FROM 2 TO 8. UPDATE INTERIOR DOORS FROM 5 TO 20.

DRY TOILET TRAPS TYPICAL WITHIN CLOSED BATHROOM NO SIGNIFICANT CHANGES

NEW CERAMIC WALL TILE, CERAMIC FLOOR TILE, TOILETS, SINKS, PARTITIONS, LIGHTING FIXTURES, AND HAND DRYER.

NEW LOCKER ROOM COMPONENTS

NEW SOLAR PANELS

NEW DRINKING FOUNTAINS

NEW ROOF COVERING OVER ADMINISTRATION BUILDING

NEW COACH’S OFFICE

 WHY AREN’T OTHER PROJECTS ON THE LIST?  SHOULD THESES OTHER PROJECTS BE VALIDATED?  WHAT ARE OUR TIME CONSTRAINTS?  WHAT PROCESS IS REQUIRED TO ADD NEW BUILDINGS?  REDLINE  SURVEYS FOR ALL CRAFTS

 SERVICE CALLS  A SINGLE BARD UNIT CAN BE REPLACED WITH A SERVICE CALL. UNITS COST BETWEEN $9,500 TO $13,000.  INSTALLED COSTS CAN BE $28,000 OR MORE. SERVICE CALLS ARE UP TO 100 HOURS.  UNIT CHANGE- OUTS REQUIRE HVAC, CARPENTRY, ELECTRIC, WELDING, ETC.

 TO DATE 24 HOURS OF TIME HAS BEEN SPENT VALIDATING THESE 5 PROJECTS.  UPDATES HAVE YET TO BE MADE TO THE DATA WITH WHAT HAS BEEN FOUND.  IN ADDITION TO THE GIVEN PROJECTS LIST, WE NEED A COMPONENT REPORT OF THE ORIGINAL SURVEY SORTED BY BUILDING AND SPACE.