DCS and Motors Helen Heath, David Cussans, Magnus Loutit University of Bristol.

Slides:



Advertisements
Similar presentations
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Mr C Johnston ICT Teacher
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
André Augustinus 16 June 2003 DCS Workshop Safety.
E951 POWER SUPPLY 5/13/02 IOANNIS MARNERIS Brookhaven National Labs.
TPC Very High Voltage Control Status report Marco Boccioli 20/04/2006.
02/10/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Electrical Design Project Presentation.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
04/26/04By: Strobridge & Sulkoski1 G.U.S.T.E.R. General User System for Testing Engineered Rotors.
Given Connections Solution
What is a Computer Network? Two or more computers which are connected together.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
A rapidly developed control system for WITCH A. Lindroth, V. Kozlov.
First SPL Collaboration Meeting Organization of the Collaboration - Preliminary ideas - R. Garoby 12/12/2008.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Kicker generator and controls installation in ECA5? Etienne CARLIER
Chiller control system Lukasz Zwalinski – PH/DT.
OCR GCSE ICT DESIGNING DATA CAPTURE FORMS. LESSON OVERVIEW In this lesson you will learn about how to design a data capture form.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
19/05/10FV 1 HyTec crate – DCS integration issues.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
IN 1900 ICT Project Final Presentation. Group name : Code Squad.
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
Status of the NA62 network R. Fantechi 23/5/2012.
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
SeaPerch Electrical System. Electrical System Overview Assemble the control box. Make the Cat5 connector. Wire the motors to the tether. Wire the control.
TITLE: Power Distribution OBJECTIVES
MEDICIS Safety Alarms Systems
Status & Plans for WA105 Control System
What is ASEMR /ASKUE/ and the Need for Its Implementation
SeaPerch Electrical System
MICE RF System Power Supplies, Control and Monitoring Status report
IT Architecture Technical blueprint for evolving a corporate infrastructure resource that can be shared by many users and services processing systems hardware.
Computing room PC farm UPS.
MERcury Intense Experiment Experiment Layout
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
EMU Slice Test Run Plan a working document.
Cryogenic C&C Scope of work
Special Magnets Controls
PSS0 Design & Concept of Operations
START OF REVISION OF UR TUNNEL INTEGRATION
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Hardware integration and interfaces
SeaPerch Electrical System
Our Process CMSC 345, Version 1/04.
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

DCS and Motors Helen Heath, David Cussans, Magnus Loutit University of Bristol

DCS Draft Document introduced at last meeting. – No comments received

Short Term Decisions from last meeting Laying cable from tunnel to control room Gilles Marie informed of cable choice. Rack J01 has been allocated in PC farm on surface. Will also have interlock for limit- switches.

Decisions & Tasks from last meeting Architecture of control system decided. Space allocated in “upstairs” rack. Gilles Marie informed about choice of cables and locations. Need to liaise with CERN beams/targets group for specification of PLC and interface boards (Piotr Golonka)_ Install PLC and connect cables. Specify obtain and fix ATEX diaphragm motor Design/install end-limit interlock Modify PLC code to interface to NA62 DCS Integrate motor control into DCS user interface

Motor controls Work of Magnus Loutit – Preliminary drawings available for the control of the existing motors (attached to this presentation) 1A (X), 1B (Y), 1C(Diaphragm) – Bill of materials being compiled

Note about Diaphragm Motor May not be possible to find a24V-DC ATEX-2 rated motor. Most low voltage motors have brushes, which spark, so aren't suitable for potentially explosive environments. The fall-back solution if we can't find a suitable motor in time is put a temporary box near the CEDAR containing a relay and a 240V- ->24V power supply.