1 LIFE+ communication Presentation at LIFE+ Kick-off meeting Warsaw, 13 January 2011.

Slides:



Advertisements
Similar presentations
1° Transnational Workshop – Rome 3rd- 4th February PROJECT WEBSITE AND PROJECT GRAPHIC DESIGN 1.
Advertisements

1 Information and Publicity in programming period.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Disseminating and Using MICS data.
Проект финансируется Европейским Союзом Visibility workshop for IBPP Civil Society projects – Moscow, Visibility Guidelines for EU-Funded.
LIFE external communications team AEIDL 1 LIFE+ communication Presentation at LIFE+ Kick-off meeting.
Communication, Exchange and dissemination of good practices.
EC VISIBILITY REQUIREMENTS LOCAL INTEGRATION OF REFUGEES IN BELARUS, MOLDOVA AND UKRAINE.
WP2 – communication and dissemination
Slide n°1 LIFE NAT platform Meeting Fi-S-DK The external monitoring team Roles & Responsibilities & News.
PER-NATUR INTERREG III A ITALIA - ALBANIA Project part-financed by the European Union (ERDF) (ERDF)
Presented by: Tasha Williamson. Introduction Important instruments for dissemination of information to a wide audience, including academics, community.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Slide n°1 LIFE09 Kick- off meeting 13 January 2011, Warsaw COMMON PROVISIONS : 1. TECHNICAL ASPECTS Izabela Madalinska, Technical Desk Officer, LIFE Unit,
Presentation at LIFE Kick-off meetings
Grip-it PUBLICITY GUIDELINES for APPROVED SUBPROJECTS Participants Seminar – September 2006 Manuela Fischanger Responsible for Component 4 – Info and Pubblicity.
Information & Publicity Guidelines Joint Technical Secretariat of the Programme “Greece-Bulgaria ” European Territorial Cooperation Programme.
Norwegian partners and Project Promoters Kick-off seminar for Estonian-Norwegian research projects, Tallinn Senior Adviser Aleksandra Witczak.
DISSEMINATION AND VALORISATION PLAN Once Again-st is a dissemination and valorisation intervention Dissemination implies all actions, tools and channels.
The Programme is funded by Erasmus+ under
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions: Dissemination NATURAL HISTORY MUSEUM – UNIV. OF CRETE (NHMC) Project co funded by.
Name, Surname, Position Event, Date, Place Managing a LIFE project.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Action Plan for AWM WP5: Establishment of Permanent Adriatic Welfare Observatory Welfare Mix Days Ulcinj, July Andrea Russo Adriatic Welfare Mix.
LIFE12 ENV/IT/ «CLEANSED» «Innovative integrated methodology for the use of decontaminated river sediments in plant nursing and road building» Start:
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
Izabela Madalinska, Technical Desk Officer, LIFE Unit, European Commission Slide n°1 LIFE09 Kick-off Meeting Introduction LIFE09 Kick-off Meeting, 13 January,
INTERACT Sharing INTERREG experiences presentation by Annica Westerlund.
The Marketing of a PACA Exercise and a PACA Project Jörg Meyer-Stamer.
1. 2 Press and media relations CPR Introductory Briefing, 18 March, Gigiri  Promotes global press coverage of urban and human settlements issues  Media.
Project overview: objectives, work programme & management guidelines FIRST MEETING OF EUROPEAN POLICY CORE GROUP Thursday, 03 March 2005 in Berlin PRESENTATION.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
The Communication of LIFE’s results: how to spread the world? Simona BACCHERETI LIFE Programme Communications Team LIFE Nature Platform Meeting September.
PATCH-WORLd PArenTs and CHildren Working, ORganising and Learning together 23/24 October 2009 Sofia Final Conference This project has been funded with.
Presented by: Barbara Tomassini - Communication and Public Consultation KE COMMUNICATION and AWARENESS RAISING: SWIM-SM suggested priorities for nd.
CULTURe EXchange Platform (CULTUR-EXP) Project Overview Prof. Ramaz Kvatadze Georgian Research and Educational Networking Association – GRENA
RECOMMEND 2nd Working summit Comp 2 „Communication & Dissemination“ Ingrid Rozhon 28th Nov 2012 Peterborough / UK.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Leader subcommittee meeting- 26/11/ THE CONTACT POINT OF THE EUROPEAN NETWORK FOR RURAL DEVELOPMENT Main tasks of the Contact Point in relation to.
Slide n°1 LIFE09 Kick-off Meeting Other LIFE Stakeholders The Monitoring Team Roles & Responsibilities LIFE09 Kick-off Meeting, 13 January 2011, Warsaw.
Work Package 4 Practicalities Kick-off meeting Judith Freita Ramos Project Deputy for Detectors at ESS.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
Orientation for new Lead Partners and Partners Information & Publicity Requirements Lead Partner and Partner Seminar 12 June 2008 – Voss, Norway Kirsti.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
17 January 2003DIP meeting - Frankfurt introduction Vartkes Goetcherian
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
THE INTERACT PROGRAMME Contents:  Objectives  Delivery structure  Services  Themes  Target Groups and Networks  What is new?  Status of Knowledge.
Achievements Work Package 1 Achievements Work Package 6: Support the Commission with the overall coordination of the programme.
CCIC Component 2 Communication & Dissemination. The Team in Eindhoven Tieke VeuskensEindhoven –T: E :
Management of Tempus projects Kick-off meetings of 2011 projects.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
Todd’s specialty is audio and video production and has been with RAB for 7 years.
1 Project Coordinators’ meeting March 2010 NATIONAL TEMPUS OFFICES (NTOs) & HIGHER EDUCATION REFORMS.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
Information & Communication Irma Astrauskaitė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Collaboration and communication with the EC and External Monitoring Team: What is expected of the Beneficiaries External Monitoring Team, SE Europe.
Creating and implementing a communication plan COMMUNICATIONS AND VISIBILITY.
European Union COMMUNICATION AND VISIBILITY. Importance of Visibility EU taxpayer money Need for awareness, accountability and transparency EU should.
Information and Communication Guidelines for European Structural and Investment Funds Programmes
Co-Financed by European Regional Development Fund and made possible by the INTERREG IVC MITKE Overall progress 5th Steering Group Meeting Rzeszów, 30th.
1 Communication Activities Grant holder's Meeting, December 2011, Brussels.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
AVA Communication Magda Klimontowska University of Liverpool
Welcome! Bienvenue ! Bine ați venit! Willkommen!.
ASTRALE GEIE - Your Monitoring Team -
Welcome! Bienvenue ! Bine ați venit! Willkommen!.
Welcome! Bine ați venit!.
Presentation at LIFE Kick-off meetings
Presentation transcript:

1 LIFE+ communication Presentation at LIFE+ Kick-off meeting Warsaw, 13 January 2011

January Contents of presentation External communications team LIFE communication tools Your project’s communication

January External Communications Team

January Role of the CoT AEIDL Communications Team EC ASTRALE Monitoring Team Beneficiaries Assisting the EC with LIFE communications  to facilitate transfer of experience and know-how  to promote the LIFE programme to the general public  based on information provided by monitors and beneficiaries Providing communication assistance to beneficiaries

January Communications Team: organigramme Coordinator Ref. Persons - Env. Pol & Governance - Nat & Biodiversity -Info & Com Editorial Pool of 7 journalists Production Webmaster Graphic & web design/ Layout Dissemination Knowledge Transfer Facilitator (dissemination of results) InfoDoc Information Analyst Database Manager Assistant

January What does the CoT do: LIFE communication tools 1.WebsiteWebsite 2.LIFEnewsLIFEnews 3.Thematic brochuresThematic brochures 4.Best projects brochureBest projects brochure 5.Project databaseProject database 6.New projects compilationNew projects compilation 7.General dissemination material 8.Multimedia archive 9.Communication assistance to projects (e.g. factsheets)Communication assistance to projects (e.g. factsheets) For more information (including advice for good project communication) see also your “LIFE+ Welcome package”, that was sent to you on the LIFE USB stick.

January Your project’s communication

January Why communicate? improve participation of relevant stakeholders share knowledge and experience achieve synergies with other projects promote yourself and your product

January Communication requirements Common provisions (CP) and contractual obligations

January Visibility (CP §13.1) Publicise project and its results Acknowledge the support given by the Community in all documents and media:  books,  brochures,  press releases,  videos, software,  audio-visual material Details to be given in each activity report

January Website (CP §13.4) Create a new or use an existing website  should be online the latest 6 months after project start and kept for at least 5 years after project end  shall be regularly updated disseminate project activities, progress and results Web address must be indicated in the reports

January LIFE logo (CP §13.2,13.3, 13.8)LIFE logo should appear on all documents, media and durable goods LIFE+ Nature projects shall also use the Natura 2000 logo However  LIFE logo may not be referred to as a certified quality label or eco-label Please note: products not bearing the logos are considered ineligible costs (CP §26)

January Notice boards (CP §13.5) Erect and maintain notice boards describing project  display at strategic places accessible  carry LIFE (Nature 2000) logo

January Layman’s report Contractual obligation: In electronic and paper format To present the project, its objectives, its actions and its results to a general public For decision-makers and non-technical parties 5-10 pages In English and in the beneficiary’s language

January After-LIFE communication and conservation plans Contractual obligation for ENV&POL, INF&COMM and BIO projects: as a separate chapter of the final report in paper and electronic format sets out plans for continued dissemination and communication of results after the project’s end in the project's language and (optionally) in English

January Further requirements Events  Inform Commission of and invite to all seminars and public conferences (at least 3 weeks in advance) Audio-visual material (CP§13.9.)  The EC shall not be considered “co-producer”  Credits shall include an explicit and readable mention of the LIFE support (e.g. “With the contribution of the LIFE financial instrument of the European Union”)  Non-exclusive rights are granted to the EC to reproduce, dub, distribute and use any audio-visual documents produced by the project

January Last but not least

January Use the external communications team! Send them:  News of your project  Meetings and events  Prizes the project has won, etc. Products (in e-format)  Photos (captions, credits)  DVDs  Guidelines and recommendations  Newspaper clippings, etc. To be uploaded on the LIFE website or database

January Contact the Communications Team Please do not hesitate to contact the CoT directly Tel.: +32 (0) …. As always, with a copy to your ASTRALE monitoring team.